Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0825-00985
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/06/2025 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | 1) Review Traffic Control plan redline notes - Pedestrian detour access route required for closure of sidewalk.. 2) Proposed work area located with in active City of Tucson Project area - Valencia Widening Project - City PM Arturo Ledesma - Arturo.Ledesma@tucsonaz.gov 3) PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED IF NO MARKED ADA RAMPS AND CROSSING ACCESSABLE WITHIN 660' OF SIDEWALK CLOSURE. ACCESSABLE. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 4) Bike Lane Access and Accommodation Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
||
| 08/06/2025 | Engineering Project Managers - Standard | REVIEW COMPLETED | |||
| 08/05/2025 | Transportation Application Review Express | REVIEW COMPLETED |