Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.2
Permit Number - TR-ROW-0526-00527
Review Name: RIGHT-OF-WAY REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/27/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Review comments - Site plan - Proposed is a NEW connection road to school parking lot? Provided more details for work area in the ROW - 1) Driveway as noted to meet PAG 206 Standard Detail - Call out concrete construction up to 8' behind edge of pavement 2) NEW driveway and road placement will require compliance with Chapter 25 standards - Minimum 12' between driveway placements - Current Church driveway to the South of proposed locations? 3) The new access road is proposed to be only 11' wide, so it will be one-way traffic, which direction will traffic flow 4) What is purpose of access road - Bus, Parent pick up/drop off, ??? 5) Is there an associate PDSD permit for new road placement on property. Please provided permit number. Additional permits may be required for propose scope of work, PDSD review required. --- Traffic Control Plan - Will there be a TCP plan for work along Gollob Rd? And what is impact to ROW on Eastside of School - Gollob Rd is City Collector - Note: Gollob Rd and Blacksburg Rd are both currently under Pavement moratorium conditions for Asphalt impact.. Upload revised or additional supporting documentation associated with scope of work and any related Traffic control plan. Reference UDC Chapter 25 standards for Driveway placement.. PAG 206 Standards Details, and TSM 10-01.4.3.. |
||
| 05/22/2026 | Transportation Application Review Express | REVIEW COMPLETED |