Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.3
Permit Number - TR-ROW-0526-00527
Review Name: RIGHT-OF-WAY REVIEW v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/16/2026 | Transportation Application Review Express | PENDING ASSIGNMENT | |||
| 07/22/2026 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | Resubmittal Required - For permit approval - Refer to Email sent to billy@duravo.build on 7/16/2026 for further requirement details. 1) Durazo Construction will require a TDC portal profile account to be create or added to the permit contact information for continued Review 2) Based on the proposed scope of work, DTM has determined that the project has the potential to increase traffic volumes and modify traffic circulation on S. Blacksbury Avenue. Accordingly, a Traffic Impact Analysis (TIA) or Traffic Circulation Report is required and must be submitted to DTM for review to evaluate the operational impacts associated with the proposed school access and parking configuration |