Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0523-00768
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/31/2023 | Traffic Engineering Review | APPROVED | 1. PLACE “BUSINESS ACCESS” SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. 7. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 |
||
| 06/02/2023 | ROW Engineering Review | NOT REQUIRED | |||
| 06/02/2023 | DTM Electrical | REQUIRES RESUBMIT | We do not permit items of this scale to be installed on our concrete poles. • In order to pursue this installation, COT-DTM would require proof of public notification/outreach and public approval. • Following community acceptance, we would require additional information of the equipment to be affixed to include specifications of weights and wind resistance data; o This information would be submitted to our pole manufacturer for review. • If approved, we would then require UofA P.D. to contract one of our JOCs to replace this pole with a steal pole painted to match. |
||
| 05/18/2023 | MITZ District | REVIEW COMPLETED | |||
| 05/16/2023 | Transportation Application Review | REVIEW COMPLETED |