Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0424-00383
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/18/2024 | ROW Engineering Review | APPROVED | 1. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 2. PAVEMENT PATCHING IS NECESSARY WHERE PAVEMENT IS CUT. PATCH LIMITS- THE LIMITS OF THE PAVING SHALL BE A MINIMUM OF 1-FT OUTSIDE THE EXCAVATION. 3. POTHOLES SPACED CLOSELY TOGETHER AND WITHIN 8-FT OF EACH OTHER WILL NEED TO BE JOINED TOGETHER BY ONE SURFACE PATCH. 4. BACKFILL WITH CLSM SLURRY OR AGGREGATE BASE COURSE (ABC.) 5. ASPHALTIC CONCRETE USED SHALL BE CITY OF TUCSON MIX NO. 3 OR COT MIX NO. 2 WITH TR-22, INSPECTOR TO ADVISE. 6. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 7. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION 8. MAINTAIN PEDESTRIAN ACCESS 9. MAINTAIN BICYCLE TRAFFIC TRAVEL LANE. |
||
04/17/2024 | Historic | REVIEW COMPLETED | Consistent with the direction provided in the previously completed archaeological report, any trenching, boring, grading or digging should be monitored by a qualified archaeologist. Once the work is completed, a draft report should be submitted to the city's HPO. Questions? Jodie.Brown@tucsonaz.gov | ||
04/16/2024 | MITZ District | REVIEW COMPLETED | |||
04/15/2024 | Transportation Application Review | REVIEW COMPLETED |