Permit Review Detail
Review Status: Approved
Review Details: RIGHT-OF-WAY REVIEW v.1
Permit Number - TR-ROW-0325-00370
Review Name: RIGHT-OF-WAY REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/24/2025 | ROW Engineering Review - Standard | APPROVED | |||
| 04/29/2025 | Archeological Sensitivity - Standard | NOT REQUIRED | Per Daniel Robertson (DTM): The work was done on 3/18-3/19 as an emergency. There was an outage of approx 100 residences at that time. Team Fishel notified my inspector and then applied for a permit within 48hrs as is specified by CH25. They did not apply for the correct permit type, which should have been a ROW Emergency Permit. The excavation was limited in size and was on top of a previous excavation to repair conduit in the exact same location as a previous repair. |
||
| 03/24/2025 | Transportation Application Review Express | REVIEW COMPLETED |