Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: RIGHT-OF-WAY REVIEW v.2
Permit Number - TR-ROW-0325-00356
Review Name: RIGHT-OF-WAY REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/24/2025 | Transportation Application Review Express | PENDING ASSIGNMENT | |||
| 04/25/2025 | ROW Engineering Review - Standard | REQUIRES RESUBMIT | NO Traffic control plan included, Attached document is only a Cover sheet. Original Traffic Control plans Redline notes were not addressed and not Comment response letter include to address Redline comments. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Please provide 1) Traffic Control plan addressing Original submission review comments 2) Address Pedestrian access and accommodation to maintain ADA compliance 3) With Original proposed design No Ramps were called out for Curb clearance and No TC was addressed for Driveway impact during the Ped detour. 4) Pedestrian detour requires ramps (where required for movement), and Channelizing devices with detectable edges for edge line, Detour path to be min 48" width. |