Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3
Permit Number - TR-PIA-0424-00007
Review Name: PRIVATE IMPROVEMENT AGREEMENT REVIEW v.3
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/10/2025 | PIA Engineering Review | APPROVED | |||
| 06/06/2025 | Transportation Maps and Records Review | APPROVED | Please change the signing names and order on the cover sheet for the Mylar and final paln set - per my notes on the plans. | ||
| 06/09/2025 | Floodplain Administration Review | REVIEW COMPLETED | DTM Drainage Review: approved with conditions: The concern is the proposed size of the pipe on El Vado Rd appears to be half the TSMS flowrate coming from the two cell box culvert and the flooding complaints in the area. There was a statement in the drainage report regarding TIA having some drainage improvements recently that have reduced discharges impacting the project area although this was not explained. Please provide revised drainage statement that includes additional information regarding the TIA 's reduced flowrates and drainage improvement that reduced these flows. Elizabeth Leibold P.E., CPM, CFM (520) 429-4905 (wk cell) Civil Engineer – Floodplain Manager - CRS Coordinator Engineering Division |