Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1
Permit Number - TR-PIA-0424-00007
Review Name: PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/21/2024 | Engineering Project Managers | APPROVED | |||
| 05/14/2024 | Floodplain Administration Review | REQUIRES RESUBMIT | 1. 2. Provide details and sizing calcs for proposed transverse grate at Geronimo and at upstream inlet. 3. Provide call out for higher strength RCP for all proposed RCP that does not have minimum requirement of 3-feet cover. 4. Label TIA easement at existing upstream outlet structure. 5. Add notation to plans and report regarding maintenance responsibility for both existing airport outlet easement at parcel Parcel 138170370, proposed channel and berm on same parcel, and for proposed stormdrain pipes in ROW. 6. Explain status of proposed regional detention basin at southeast area of project. [ref: TS 4-04.10.9.1] |
||
| 05/22/2024 | PIA Engineering Review | REQUIRES RESUBMIT | See DTM comments on attached plan set. | ||
| 05/08/2024 | Transportation Maps and Records Review | REQUIRES RESUBMIT | |||
| 04/17/2024 | PIA Coordinator Express | REVIEW COMPLETED | |||
| 04/18/2024 | Traffic Engineering Review | REVIEW COMPLETED | It appears that the project limits are mostly contained curb to curb. There is no striping on this stretch of road. The plans call out for the relocation of a speed limit sign. All other signage within the project limits should be protected-in-place. This could be called out in the General Notes. | ||
| 04/19/2024 | Transportation Landscape Review | REVIEW COMPLETED | See comment on plan , add note to plan accordingly |