Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-1222-00043
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Fire New Construction | REVIEW COMPLETED | Section 503.2.5 Dead ends. Dead-end fire apparatus access roads in excess of 150 feet (45 720 mm) in length shall be provided with an approved area for turning around fire apparatus. All portions of the buildings shall be within 600' of a fire hydrant on an approved route You shall provide the following notes on your cover sheet: Fire sprinkler underground plans shall be submitted to and a permit obtained from TFD Fire sprinkler plans shall be submitted to and a permit obtained from TFD Fire alarm plans shall be submitted to and a permit obtained from TFD Owner shall provide KNOX key boxes and KNOX Locking F.D.C. caps Fire sprinkler system is required the F.D.C. shall be located on the street side in compliance with IFC 2018, Chapter 9, Section 912.2.1 Fire department aerial access will not be required. Questions: Jennifer Peel-Davis Tucson Fire Department Fire Plans Examiner Fire Inspector I, II and Fire Alarm Plans Examiner Jennifer.Peel-Davis@Tucsonaz.gov Desk: 520-837-7033 |
|||
Site Engineering | REVIEW COMPLETED | 1. If new impervious area is greater than 2000 square feet, First Flush will be required. Detention is not required as long as water harvesting is maximized. 2. Ensure connection of new buildings to existing pedestrian circulation path (TSM 7-01) 3. Ensure current DP21-0352 is in final status or withdrawn before applying for this project, or submit this as a revision to DP21-0352. Joshua Garcia joshua.garcia@tucsonaz.gov |
|||
Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PROJECT: NEW HIGH SCHOOL ACTIVITY NO. TP-PRE-1122-00043 ADDRESS/PARCEL: 7525 E SPEEDWAY BL/133-13-005F ZONING: 0-3 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards. COMMENTS: 1. Maximize rainwater harvesting into landscaped areas as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 2. Ensure current DP21-0352 is in final status or withdrawn before applying for this project, or submit this as a revision If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
|||
Site Zoning | REVIEW COMPLETED | FROM: Iman Monshizadeh PDSD Zoning Review Section PROJECT: TP-PRE-1222-00043 (Desert Christian High School) TRANSMITTAL DATE: 01/17/2023 A Development Package will be required for this site. Information on the development package can be found at: https://www.tucsonaz.gov/pdsd/apply-permit Setbacks for the O-3 zone for this use adjacent to a residential zone are 10’ or ¾ * Height of the structure (whichever Is greater). For this situation the setback to the north will be: (Estimated) Building A: 19’ Building B: 21’ Parking calculations are based off number of students not GFA. Parking will be unaffected. Ensure all new entrances and exits to structures have pedestrian access to the entire site. |
|||
Traffic Engineering Review | REVIEW COMPLETED | No Comments | |||
TW Hydraulic Modeling Review | REVIEW COMPLETED | 1. Tucson Water has no objections to the proposed development and offers the following comments for your convenience. 2. The owner/developer will need to construct all on-site and off-site water mains necessary to serve this development at his or her own expense. 3. The design of any new public water mains will need to be accepted within Tucson Water’s normal Water Master Plan and Water Design Plan review processes before construction may begin. 4. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |