Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-1125-00248
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Fire New Construction * | REVIEW COMPLETED | TP-PRE-1125-00248 • Pre-Application Conference Review v1 • 3901 N ORACLE RD TUCSON, AZ 85705: Based on the information provided, TFD has the following comments: 1. Verify turnaround meets the requirements of IFC, 2024, D103.4 2. Provide Knox access at gates, IFC 2024, 506.1.1 Please feel free to reach out with any additional questions. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review * | REVIEW COMPLETED | DTM Review Comments: 1) Proposed work zone with in ADOT Right of Way - ADOT review will be required. 2) Driveway to be brought up to PAG 206 Standards. 3) Unused Driveway/Curb cut to be closed and brought to PAG curb standards 4) Sidewalk along Property frontage to be brought to PAG 200 standard - Damage sections to be replaced. |
|||
| Site Engineering * | REVIEW COMPLETED | Permit: TP-PRE-1125-00248 Location: 3901 N ORACLE RD Review Date: 12/11/2025 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Manual (TM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code. Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Comments: 1. A Drainage report to show full compliance with first flush retention/balanced basin detention requirements. Refer to the Design standards for Stormwater Detention and Retention Chapters 2, 3, & 4. Drainage report content and format requirements can be found in chapter 10 of the DSSDR as well. 2. A grading plan with cut/fill quantities and area of disturbance will be required. TSM 2-01.0.0 3. Provide updated Waste Stream Calculations for the entire site according to TSM 8-01.8.0. Provide trash enclosure detail in compliance with TSM 8-01.8.9 4. Clearly show all site downspouts and sidewalk scuppers. to ensure that stormwater from roof drains, up to and including flow from the ten-year storm event, does not pass over sidewalks per Technical Standards Manual 7-01.4.3E. 5. Pedestrian circulation is required to connect all buildings, dumpster areas, common areas, and the sidewalk on all the street frontages per TSM 7-01.3.3. The pathway along the north will not be compliant in connecting to trash enclosure to the East because of the necessity to cross a loading zone. o It should be noted that everything on the site should be connected for pedestrian circulation which means showing connection to the existing building to the East 6. Show that the retention/detention basin is the minimum required 10 feet setback from structures. DSSDR 5.3.1.11 If they are to be proposed within that setback, a Geotech report will be required to provide recommendations on possible reduced setback requirements This review is for Pre-Application purposes. Please be aware that additional comments may be forthcoming during submission process. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
|||
| Site Landscape * | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: BUILDING ADDITION TO EXISTING SITE ACTIVITY NO: TP-PRE-1125-00248 ADDRESS: 3901 N ORACLE RD ZONING: C-2 COMMERCIAL ZONE LAND USE: COMMERCIAL 12.10.2025 THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING. SITE LANDSCAPE/NPPO COMMENTS: 1. A Native Plant Preservation Plan (NPPP) or a NPPO waiver is required per UDC 7.7. See UDC 7.7.3. Applicability; UDC 7.7.4 NPPO General Provisions and Standards; UDC 7.7.4.c. Plan Approval Prior to Permitting; UDC 7.7.4.d. Professional Expertise 7.7.5.c.5; also see AM 2-11.3.0 Permitted Exceptions. If applicable, the Planning and Development Services Department will provide the applicant with the NPPO waiver form upon request. 2. UDC 7.6.2. APPLICABILITY The provisions of this section apply to the following: A. All new development; and, B. Expansion of existing development, as provided below: 1. Buildings Greater Than 10,000 Square Feet On sites where the gross floor area of the existing building (s) is more than 10,000 square feet, expansion in square footage of land area, floor area, lot coverage, or vehicular use area as follows: b. If the expansion is 25% or greater or if expansions as of February 15, 1991, cumulatively result in a 25% or greater expansion in land area, floor area, lot coverage, or vehicular use area, the standards of this section apply to the entire site. 3. A landscape plan set is required. Preparation of the landscape plans shall adhere to UDC 7.6.4 and Administrative Manual 2-10. 4. Parking lot canopy trees are required at 1 tree for every 4 parking spaces provided, see UDC 7.6.4.B. Structurally covered parking spaces do not count toward the ratio, see UDC 7.6.4.B.1.c.(8). Trees are to be distributed evenly throughout the parking area, see UDC 7.6.4.1.a.(1). See Technical Standards Manual 5-01.3.0 for additional landscaping in vehicular use area requirements. 5. An updated street landscape border is required along Oracle Rd per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C. Commercial land use along MS&R and non-MS&R requires a 10’ street landscape border. 6. A drip irrigation plan and details are required for all proposed landscape planting areas. 7. DTM review is required for all planting and irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) if necessary for this project. 8. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 9. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required. 10. Coordinate the Landscape Plan, Commercial Rainwater Harvesting Plan and the Civil Grading Plans to have identical basin size, grades/percent slopes, spot elevations and curb cut inlet and outlet locations. 11. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area. 12. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0 Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
|||
| Site Zoning * | REVIEW COMPLETED | CDRC TRANSMITTAL TO: Planning & Development Services Department FROM: Fernando L. García PDSD Zoning Review Section PROJECT: 3901 N ORACLE RD TP-PRE-1125-00248 Parcel: 106-050-003A Zoning: C-2 TRANSMITTAL DATE: DECEMBER 10, 2025 1. The proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package. Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency. 2. General Merchandise Sales (subject to use-specific standards 4.9.9.B.1), Administrative and Professional Office (subject to use-specific standards 4.9.13.P), and Commercial Storage (subject to use-specific standards 4.9.10.A and 4.9.13.Q) are all permitted uses in the C-2 zone and I-1 zone. Please clarify square footage dedicated to each use on the development package. 3. Although a 2003 development package may have approved the construction of a 8,550 sf building at the rear of the property, approval for development on that permit only last three years per UDC Section 3.3.3.G.6.a. As such, the proposal for a new building in the rear of the property will be considered an expansion in gross floor area of 25%, and as such, require the entire site to come into compliance with current code and development standards. 4. Minimum required motor vehicle and short-term/long-term bicycle parking will be based upon the uses and their square footages. As this break-out between uses on site is not clear, please reference UDC Table 7.4.4.-1 for mot vehicle parking and Table 7.4.8-1 for bicycle parking. Please be aware that the site will be required to comply with new electric vehicle service equipment (EVSE) requirements as indicated in UDC Section 7.4.11.B and Table 7.4.11-1. 5. Pedestrian circulation is required to connect to the existing right-of-way along N Oracle Rd as well to connect all public areas of the development. Clarify whether the new proposed building includes a showroom or is a storage area open to the public (customers). The pedestrian circulation path along the new proposed building is bisected by the loading zone. Demonstrate unbroken connectivity between pedestrian connectivity paths. This may require redesigning the path so that it passes in front of, rather than behind, the loading zone. No pedestrian circulation is shown between the front and rear halves of the development. 6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, the Zoning Review Section will conduct a full review to assure compliance with applicable UDC development criteria and technical standards. 7. If you have any questions, please contact me at fernando.garcia2@tucsonaz.gov. |
|||
| TW New Area Development * | REVIEW COMPLETED | Based on the information provided, Tucson Water has no objections to, or comments on the proposed development. Potentially serving this project is a 12in CA (Cement Asbestos), A zone, potable water main located on the east side of the parcel ROW of N Oracle Rd. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Abdullah Salman | Project Manager Tucson Water - New Area Development Abdullah.Salman@tucsonaz.gov |