Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-1123-00385
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Entitlements | REVIEW COMPLETED | DATE: 2/28/2024 REVIEWED BY: Gabriel Sleighter, Planner CASE NUMBER: TP-PRE-1123-00385 Loop Automotive – 1st and Glenn PROJECT ADDRESSES: 2845 N 1ST AVE PARCEL NUMBERS: 107-12-3150 EXISTING ZONING: C-2 EXISTING USE: Automotive: Major Service and Repair (excluding bodywork and paint-booths) PROPOSED ZONING: C-3 PROPOSED USE: Trade Service and Repair: Major (includes automotive bodywork & paint booths) PROJECT DESCRIPTION & LOCATION: The applicant is requesting to rezone from C-2 to C-3 Commercial to allow for auto body and paint booth uses at the existing Loop Automotive repair shop. The approximately 1-acre site is approximately 400 feet north of the intersection of Glenn Street and 1st Avenue, on the west side of 1st Avenue. The applicant seeks to bring the shop’s existing paint booth into operation and add a second paint booth within the existing building footprint. The concept site plan also indicates a proposal for new covered parking, which is outside the scope of this entitlements review. APPLICANT NAME: Earl Yousey E-MAIL: earl@dbfllc.com PLAN DIRECTION ADOPTED PLAN (S): PLAN TUCSON AND HOUGHTON EAST NEIGHBORHOOD PLAN PLAN AMENDMENT REQUIRED BASED ON CONCEPT PRESENTED (SEE NOTES BELOW) 1 YES 1 NO 0 TO BE CONFIRMED LATER PLAN SUPPORT BASED ON CONCEPT PRESENTED (SEE NOTES BELOW): 0 YES 0 NO 1 WILL DEPEND ON DESIGN Applicable Plan Policies: Plan Tucson: The Plan Tucson Future Growth Scenario Map illustrates different building blocks within the city that have specific policies to promote future growth opportunities. The proposed development lies within the Business Centers building block of the Future Growth Scenario Map. This building block includes areas that are major commercial or employment districts which act as major drivers of Tucson’s economy. Loop Automotive is in an area near 1st Ave and Stone Ave with a preponderance of businesses centered on Automotive Service, Sales, and Repairs. Plan Tucson encourages the preservation of the distinctive physical character and identity of individual neighborhoods and commercial districts in the community. Cragin-Keeling Area Plan: The purpose of the Cragin-Keeling Area Plan is to guide future development to protect the natural amenities of the area and to enhance existing neighborhoods. The Plan’s Land Use Area Map indicated the subject parcel is designated “Mixed Uses” with a broad range of allowed commercial uses. Surrounding Zoning and Land Uses: Owners of this parcel have initiated to process to rezone the property to C-2 to allow for the operation of two automotive paint booths. Surrounding zoning is C-2 to the north, east, and south. The parcel to the west is zoned R-2 and is multi-family housing. Land uses in the commercially zoned parcels include self-storage, multiple auto or motorcycle shops, used car dealer, and a gas station. Analysis: The applicant is proposing a rezoning of the parcel to support the operation of two automotive paint booths at the existing Loop Automotive shop on 1st Avenue, 400 feet north of Glenn St. The shop is integrated into the community and neighborhood commercial fabric of the area, with a preponderance of other automotive-centric businesses such as auto repair and electronics shops and used vehicle dealerships. Adding related services to existing commercial uses in this area is consistent with Plan Tucson policy and the land use direction provided by the Cragin-Keeling Area Plan. A rezoning application requires a preliminary site plan and design compatibility report – any potential issues with existing non-compliant land uses such as the residential building or any required site improvements must be addressed with that submittal. Plan policy supports the rezoning request, but submittal acceptance will depend on adherence to zoning and technical standards in the submittal. A plan amendment is required to proceed as proposed. ADDITIONAL NOTES: None. |
|||
Fire New Construction | REVIEW COMPLETED | TP-PRE-1123-00385 • Pre-Application Conference Review v1 • 2845 N 1ST AV TUCSON, AZ 85719: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
Site Engineering | REVIEW COMPLETED | Site Engineering has no comments or concerns about the proposed rezoning. Lianne Evans lianne.evans@tucsonaz.gov |
|||
Site Landscape | REVIEW COMPLETED | Landscape/NPPO has no concerns about the proposed rezoning for this site. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov |
|||
Site Zoning | REVIEW COMPLETED | Rezoning Pre-Submittal Transmittal FROM: Nicholas Martell PDSD Zoning Review PROJECT: Rezoning Pre-submittal meeting TP-PRE-1123-00385 Address: 2845 N 1ST AV TUCSON Parcel(s): 107123150 Existing Zoning: C-2 Proposed Zoning: C-3 Existing Use: Commercial-Automotive Service and Repair Proposed Use: Addition of Commercial-Trade Service and Repair Major TRANSMITTAL DATE: February 23, 2024 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 - Development Package. 2. Proposed use and use-specific standards: 4.9.4.X.1 3. Development standards: 75’ Building Height Maximum 4. Perimeter yard setbacks: Adjacent to the R-2 Zone: 1½(H) 5. Applicable street setbacks: First Avenue is a Major Street, subject to UDC 6.4.5.C: For nonresidential and multifamily development abutting an Arterial or Collector Street the minimum required street perimeter yard is ten feet, as measured from the existing or future property line as determined by the adopted Major Streets and Routes Plan, whichever is greater. 6. Parking requirements: See UDC Article 7.4.4 https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-5445 7. Additional comments: a. Ensure that the preliminary development plan (PDP) satisfies the requirements of 2-03 of the administrative manual: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-8425 b. Provide the building footprints, heights, and all other UDC standards from these comments to the PDP. c. An IPP or Parking reduction may be required, as the site will be reviewed for full code compliance. d. DP20-0271 is still open and will need to be completed before the any submittal. e. It does not appear that the existing covered parking has been permitted. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at nicholas.martell@tucsonaz.gov. |
|||
Traffic Engineering Review | REVIEW COMPLETED | No comments or concerns from DTM Traffic Engineering division. Note that there is an RTA funded project on 1st Ave from Grant Rd to River Rd that will construct improvements adjacent to this parcel in the future. https://dtmprojects.tucsonaz.gov/pages/first-avenue |