Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE ENTITLEMENTS REVIEW v.1
Plan Number - TP-PRE-1026-00226
Review Name: PRE-APPLICATION CONFERENCE ENTITLEMENTS REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Entitlements * | REVIEW COMPLETED | PDF file of preliminary review is available in the TDC account. For any questions, please let me know: maria.gayosso@tucsonaz.gov. Thank you. | |||
| Fire New Construction * | REVIEW COMPLETED | TP-PRE-1026-00226 • Pre-Application Conference Entitlements Review v1 • 1980 E AJO WY TUCSON, AZ 85713: Based on the information provided, TFD has the following comments: 1. Verify required hydrant coverage. IFC 24, 507.5 2. Maintain aerial access in accordance with IFC 2024, Appendix D 105.2 Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review * | REVIEW COMPLETED | ADOT project: Interstate 10: Kino to Country Club Project is in the proximity. ADOT review required. From ADOT's plans, the I-10 West Off Ramp will be removed and the 4-way intersection will become T-Intersection. Sidewalk required along abutting property, new driveways will need to meet COT SD 206. | |||
| Signs * | REVIEW COMPLETED | All proposed signage shall be to current sign standards and be applied for by separate permit. | |||
| Site Engineering * | REVIEW COMPLETED | 1. The proposed project will require a grading permit. 2. Balanced basin detention and first flush retention will be required. 3. Show a complete pedestrian circulation path throughout the site. 4. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Site Engineering to assure compliance with the applicable UDC development criteria and Technical Standards. These comments are to provide guidance on what will be needed for the future development package and PDP. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
| Site Landscape * | REVIEW COMPLETED | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, PLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: CARVANA CAR VENDING MACHINE ACTIVITY NO: TP-PRE-1026-00226 ADDRESS: 1980 E AJO WY ZONING: RESIDENCE ZONE (R-1) LAND USE PER UDC TABLE 7.6.4-1: COMMERCIAL 11.13.2026 THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING. SITE LANDSCAPE/NPPO COMMENTS: 1. Add a summary on the cover of the PDP that states: All site landscape required per UDC 7.6.4 for site landscape and screening and parking lot trees will be provided with the development package submittal. Also, include a general note with regard to Commercial Rainwater Harvesting per TSM 4-01. 2. A color rendering of the site including landscape areas with shade trees will be a welcome addition for clarity during this rezoning case. 3. The eastern subject parcel may include protected native plants. At development package submittal a NPPO or a NPPO waiver will be required. See UDC 7.7; UDC 7.7.3. Applicability; UDC 7.7.4 NPPO General Provisions and Standards; UDC 7.7.4.c. Plan Approval Prior to Permitting; UDC 7.7.4.d. Professional Expertise 7.7.5.c.5; also see AM 2-11.3.0 Permitted Exceptions. If applicable, the Planning and Development Services Department will provide the applicant with the NPPO waiver form upon request. Thank you. CHAD KELLER, PLA LANDSCAPE ARCHITECT CITY OF TUCSON, PDSD, SITE REVIEW SECTION CHAD.KELLER@TUCSONAZ.GOV 520.837.4923 |
|||
| Site Zoning * | REVIEW COMPLETED | CDRC Entitlements Pre-Application Transmittal PDSD Zoning Review FROM: Loran Shamis; Principal Planner PROJECT: TP-PRE-1026-00226 Address: 1980 E AJO WY Parcel(s): 13219147B and 132191520 Existing Zoning: R-1 Proposed Zoning: C-3 for proposed height Existing Use: Vacant Proposed Use: Retail – Vehicle Rental and Sales TRANSMITTAL DATE: November 18, 2026 COMMENTS: 1. COMMENT: The proposed development is required to comply with Administrative Manual 2-06 – Development Package (Site Plan and Tentative Plat). 2. COMMENT: The proposed use Retail – Vehicle Rental and Sale which is permitted in the C-3 zone subject to use specific standards UDC 4.9.9.G.1& .2. 3. COMMENT: Per UDC 4.9.9.G.1, Outdoor lights shall not operate later than 10:00 p.m., except for security lighting provided it does not exceed 10% of all outdoor lighting. 4. COMMENT: Per UDC 4.9.9.G.2, Any lights used to illuminate outdoor activity shall be arranged so as to reflect the light away from adjacent property and comply with Chapter 6, Outdoor Lighting Code, of the Tucson Code. 5. COMMENT: The maximum height permitted in C-3 is 75’. Other Dimensional standards can be found in UDC Table 6.3-4.A. 6. COMMENT: Demonstrate compliance with UDC Table 7.4.4-1 – Minimum Number of Motor Vehicle Spaces Required. The minimum parking requirements is 1 space per 400 sq. ft. GFA of show room, retail, and office area, plus 1 space per 10,000 sq. ft. of gross lot area, plus 1 space per 300 sq. ft. GFA of Automotive and Vehicle Repair use. The design criteria for vehicular use are is 7.4.6. 7. COMMENT: Demonstrate compliance with UDC Table 7.4.8-1 – Minimum Required Bicycle Parking Spaces. The minimum short-term bicycle parking requirement is 1 space per 6,000 sq. ft. GFA. the minimum long-term bicycle parking requirement is 1 space per 12,000 sq. ft. GFA. The design criteria for bicycle parking can be found in UDC 7.4.9 8. COMMENT: A pedestrian circulation path that meets the requirements of Technical Standards Manual 7-01 is required. 9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Loran.Shamis@tucsonaz.gov. |
|||
| Traffic Engineering Review * | REVIEW COMPLETED | No comments | |||
| TW New Area Development * | REVIEW COMPLETED | For 2110 E Ajo Way Potentially serving this new development is a 6-inch ductile iron service stub from the 8-inch PVC water main (C Zone) located on the southeast side of the parcel. Water pressure in this area is 73-80 PSI at an elevation of 2516ft. Water pressure can vary by an additional 5 psi +/-. This project may require individual pressure regulators as part of private plumbing. There are designated easements located in and around the parcel. Easements are reserved for utility and/or access purposes as recorded in the property documentation. No physical construction or permanent structures are permitted within the boundaries of recorded easements. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. For 1980 E Ajo Way A water main extension will be required to provide water service to this lot. The extension may be tied into the existing 8-inch PVC C-Zone water main located along the northeastern side of the 2110 E. Ajo Way parcel. There are designated easements located in and around the parcel. Easements are reserved for utility and/or access purposes as recorded in the property documentation. No physical construction or permanent structures are permitted within the boundaries of recorded easements. If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to Deepesh Dawadi (Engineering Manager) at Deepeshraj.Dawadi@tucsonaz.gov. |