Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-1026-00210
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Design Review * | REVIEW COMPLETED | PDF File of Design Professional's Preliminary Review is available in the TDC Account and was also emailed to the applicant. If you have any questions, pelase let me know: maria.gayosso@tucsonaz.gov. Thank you. | |||
| DTM - Park Tucson * | REVIEW COMPLETED | The Park Tucson Division does not have any concerns with the reduction of proposed parking spaces requested. BG | |||
| External Reviewers - COT Environmental Services * | REVIEW COMPLETED | Proposed project must include provisions for trash and recycle collection for west and east building. If proposing centralized storage and collection to serve both buildings, must position storage/enclosure so provides minimum 14'x40' clear approach for each container, with a 25 ft overhead clear, meet minimum access and maneuvering requirements, and include enclosure detail, per TSM 8-01.0. Feel free to contact me with any questions. Andy Vera (520) 837-3798 Andy.Vera@tucsonaz.gov |
|||
| Fire New Construction * | REVIEW COMPLETED | TP-PRE-1026-00210 • Pre-Application Conference Review v1 • 1010 E 10TH ST TUCSON, AZ 85719: Based on the information provided/requested, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| Historic * | REVIEW COMPLETED | HISTORIC REVIEW REQUIRED: The subject property is a contributing historic property to the Sunshine Mile Historic District, which is listed in the National Register of Historic Places. This property is also located within the Sunshine Mile District (SMD) optional zoning overlay. The SMD Zoning Option is regulated under UDC Section 5.13.1: Urban Overlay District (UOD) and the Sunshine Mile District (SMD) Document, available online: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/smd_document_final_9-14-21.pdf. Historic Review is required only if the SMD Zoning Option will be utilized for this project. APPLICATION REQUIREMENTS: SMD and Historic Review requires a supplemental application called a Design Package. Please see the Historic & Special Districts Application Instructions for more information about submittal requirements: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/special_districts_application_instructions_3.3.2025.pdf. All materials required as part of your Design Package should be combined into a single PDF. OVERVIEW OF REVIEW PROCESS: Once your Design Package is deemed complete and fees are paid, staff will schedule a Full Review with the Tucson-Pima County Historical Commission, Plans Review Subcommittee (PRS). QUESTIONS: For questions or to set up a meeting with Historic staff, please contact: desiree.aranda@tucsonaz.gov. |
|||
| ROW Engineering Review * | REVIEW COMPLETED | The proposed improvements along E Hughes Street include approx 400' of new curb and sidewalk within the public ROW. Due to the extent of the proposed public infrastructure improvements, a PIA will be required. Parking spaces along 10th should be angled at 60 degrees for reverse parking. daniel.urbina@tucsonaz.gov |
|||
| Site Engineering * | REVIEW COMPLETED | Permit Activity Number: TP-PRE-1026-00210 Project: The proposed project consists of the adaptive reuse of the two existing buildings (one is a historic contributor to the SMD) located at 1010 E. 10th Street (Former TUSD Administration building) for a mix of commercial, retail, food service, education and other nonresidential uses. The existing building footprints, gross floor areas and overall building heights will generally remain unchanged. Location: 1010 E 10TH ST Review Date: 11/5/2026 Reviewer: Marco Contreras & Joe Macualay Related Cases: *This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.* City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf Design standards for Stormwater Detention and Retention Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Site Engineering Review Comments: 1. The proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package. Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency. 2. Grading and Stormwater — The Development Package submittal shall include a grading plan showing both cut and fill quantities (cubic yards) and the total area of disturbance, expressed in both square feet and acres. [TSM 2-01.0.0] a. Where the total area of disturbance is one (1) acre or more — or is part of a larger common plan of development that will ultimately disturb one acre or more — coverage under the AZPDES Construction General Permit is required. The applicant shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and file a Notice of Intent with ADEQ prior to the start of any earth-disturbing activity. b. A dust control permit from the Pima County Department of Environmental Quality is required separately and is triggered at the same threshold as the SWPPP. Confirm applicability with PDEQ prior to commencing site work. 3. Minimum Standard parking space size is 8.5FT X 18FT [UDC7.4.6.D]. 4. Sidewalks shall be flood free for all storm discharges of up to and including a ten-year frequency flood event. Drainage flowing across all pedestrian circulation paths shall be designed and constructed to convey flows under the path for up to and including the ten-year frequency flood events, except at street intersections, pedestrian crossings, and PAAL pedestrian crossings. [TSM 7-01.4.1.E & 7-01.4.3.E] a. Provide keynotes and call-outs identifying all downspouts and sidewalk scupper locations on all related site plans and/or building sheets. This information is required to demonstrate compliance and to ensure coordination with building permit plan review. b. If downspouts from rooftops are to be discharged at grade-level, ensure that the stormwaters up to and including flow from a 10-year event are directed away from accessible parking stalls. 5. Applicable Waste Management Standards: a. Provide the Waste Stream Calculations for the entire site on the Development Package cover sheet or where able to on the plan set. This is to ensure that the site has adequate space as the enclosure is proposed to be moved. [TSM 8-01.8.0] b. All commercial developments are required to provide adequate space/capacity for both solid waste & recycling services [TSM 8-01.5.1.A] c. Provide a trash enclosure detail(s) that is compliant with TSM 8-01.0.0. This should include all necessary information as well as include the required minimum clear space. This detail should be comparable to figures found in TSM 8-01.9.0. d. Provide a detail displaying trash truck maneuverability for the trash enclosure in compliance with Technical Standards Manual, show it falls in compliance with back-up requirements. Maneuverability dimensions for operation are 14’x40’ & 28’x40’ for two enclosures. TSM 8-01.5.3 and TSM 8-01.5.3.F. 6. As currently presented, there is a conflict regarding the proposed placement of the enclosure shown at the southern portion of the site – There is a minimum vertical clearance requirement of 25-FT for access and maneuvering for trash service, and there appears to be existing overhead powerlines at this location. a. If additional assistance & problem solving is required, it would be advisable to coordinate with Environmental Services to see if a better solution is available in regard to location pickup and positioning of the enclosure. The contact to reach out to at ES will be Andy Vera at Andy.vera@tucsonaz.gov. If in the event the proposal involves modification to standards found in TSM 8-01.0.0, it will be required that a TSMR application be processed for approval. It will be required that Environmental Services approval be acquired prior to approval to the overall building permit submissions. 7. Parking feasibility – it may be requested/encouraged that angle parking design be entertained for more realistic conditions and use of the spaces. *NOTICE: These comments are provided for pre-application purposes only and are based solely on the conceptual information submitted to date. This review does not constitute an approval, and compliance with these comments does not guarantee approval of a subsequent submittal. Additional comments, including comments on items not addressed here, may be issued during formal review of the Development Package as more detailed plans become available.* If you have any questions or concerns, please contact marco.contreras@tucsonaz.gov |
|||
| Site Landscape * | REVIEW COMPLETED | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, PLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: ADAPTIVE REUSE OF THE TWO EXISTING BUILDINGS FOR A MIX OF COMMERCIAL, RETAIL, FOOD SERVICE, EDUCATION AND OTHER NONRESIDENTIAL USES ACTIVITY NO: TP-PRE-1026-00210 ADDRESS: 1010 E 10TH ST ZONING: RESIDENCE ZONE (R-2); UOD-3 - SUNSHINE MILE DISTRICT OVERLAY (PARK SUBAREA) LAND USE PER UDC TABLE 7.6.4-1: COMMERCIAL 11.3.2026 THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING. SITE LANDSCAPE/NPPO REVIEW SECTION SUNSHINE MILE DISTRICT OVERLAY COMMENTS: 1. SMD III-10, Section E, Shade shall be provided for at least fifty (50) percent of all sidewalks and pedestrian paths as measured at 2:00 pm on June 21 when the sun is 82 degrees above the horizon. Shade may be provided by trees, arcades, canopies, or shade structures provided their location and design characteristics are compatible with the historic and design context of the street and the architectural integrity of the building. The use of plantings and shade structures in the City Right-Of-Way is permitted to meet this standard with the approval of DTM. 2. SMD III-23, I. Landscaping A. All landscaping shall consist of 100 percent desert-adapted plant species. B. *EXCEPT AS REQUIRED BY SUBSECTION III.F, Development Transition Standards, a complete or partial exception to Section 7.6 of the UDC, Landscaping and Screening Standards may be granted in order to encourage infill and redevelopment on constrained sites. If shade is provided for pedestrians and customers, such as along sidewalks, pedestrian circulation paths and outdoor patios (in accordance with Subsection III.J.1), and there are no adverse impacts on adjoining properties, an exception may be granted by the PDSD Director from the landscaping and screening requirements. C. Hardscape areas must include variation in materials and design treatment. D. Seating and other site furnishings shall be located along pedestrian circulation, near building entries and in plazas so as to not interfere with safe pedestrian passage. E. Water features are only permitted in connection with active water harvesting or using a reclaimed water source. 3. SMD III.11, Development Transition Standards: The purpose of the Development Transition Standards is to mitigate excessive visual, noise, odor, vibration intrusion and other similar public health, privacy and safety concerns that may be created by the proposed Project. A. Privacy Mitigation: Privacy mitigation measures, such as the incorporation of vegetative or other screening or siting elements, walls, siting of buildings, balconies or windows, or other design strategies shall be incorporated into a Project to reduce views towards an Affected Residential Property. B. Screening: Buffers and/or screening consistent with the purpose of this section shall be provided between a Project and an Affected Residential Property and shall include features such as, but not limited to, landscaping, walls and architecturally decorative features. C. ALSO SEE MITIGATION OF SERVICE AREAS; AND MITIGATION OF PARKING FACILITIES SCREENING STANDARDS. 4. Upon submittal of the landscape plan development package, provide documentation and calculations summarizing how the Sunshine Mile District requirements are being met. https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development services/documents/smd_document_final_9-14-21.pdf 5. SMD III-23, J. Open Space A. Projects shall provide Open Space, such as public plazas or courtyards and enhanced pedestrian passthroughs. Open Spaces are areas designed to accommodate formal or informal public gatherings, and they are one of the ways that spaces, uses and neighborhoods can be linked together. B. See Open Space design criteria included in the Subdistrict diagrams (Section IV) for total required Open Space and amount of required public Open Space. C. Public Open Space plazas shall incorporate at least three (3) of the following features to activate the area: i. Seating that is a minimum sixteen (16) inches in height and thirty (30) inches wide. Ledge benches shall be a minimum thirty (30) inches deep. ii. Mixture of areas that provide shade. iii. Shade trees. iv. Water features or public art. v. Outdoor eating areas or food vendors. D. The Open Space requirement may be waived or reduced by the PDSD Director upon a written finding during the review process that the Project enhances the pedestrian environment even with a smaller percent or elimination of the requirement. E. Open Spaces do not need to be limited to the ground level or outdoors. They may be incorporated into public or semi-private spaces that are open to the public but accessible only to patrons (e.g., patio seating at a restaurant). F. Open Space may be located in different areas of a Project, as long as each area is a minimum 300 square feet, with a minimum dimension of fifteen (15) feet if open on one side only or ten (10) feet if open on two or more sides. G. Parking areas may not be counted as Open Space. H. Portions of ground-level outdoor Open Space that are not landscaped should be surfaced in textured concrete, pavers, or other similar small-scale materials with permeable characteristics. 6. EUCLID-PARK SUBDISTRICT**THE PDP APPEARS TO BE ACCOUNTING FOR REQUIRED LANDSCAPE AREAS AND OPEN SPACE INCLUDING THE MINIMUM 30 PERCENT OF THE PUBLIC OPEN SPACE TO BE LANDSCAPED PER THE SMD, PARK SUBAREA. For any work proposed in the ROW, please reach out to DTM and David Marhefka, PLA, for review and approval prior to development package submittal. SMD ADDITIONAL GENERAL SITE LANDSCAPE/NPPO COMMENTS: 1. Parking lot canopy trees are required at 1 tree for every 4 parking spaces provided, see UDC 7.6.4.B. Structurally covered parking spaces do not count toward the ratio, see UDC 7.6.4.B.1.c (8). Trees are to be distributed evenly throughout the parking area, see UDC 7.6.4.1.a.(1). See Technical Standards Manual 5-01.3.0 for additional landscaping in vehicular use area requirements. 2. Street landscape borders per UDC 7.6.4.C.2 and Table 7.6.4-1, exception: ON THE DEVELOPMENT PACKAGE INCLUDE GRAPHICAL AND CALCULATION DATA THAT SUPPORTS ADHERENCE TO THE SMD PUBLIC OPEN SPACE LANDSCAPE AND REQUIRED SHADE. A SHADE STUDY EXHIBIT IS HELPFUL FOR REVIEWING. 3. DTM review is required for all planting and irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) for review and approval if applicable for this project. 4. A drip irrigation plan and details are required for all proposed landscape planting areas. 5. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 6. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required. 7. Coordinate the Landscape Plan, Commercial Rainwater Harvesting Plan and the Civil Grading Plans to have identical basin size, grades/percent slopes, spot elevations and curb cut inlet and outlet locations. 8. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area. 9. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0. Or see City of Tucson Ordinance 10597 -- Sec. 6-182. Rainwater Harvesting Plan: Number 3 (a) A separate water meter connected to the main water supply; or (b) An irrigation sub-meter. Thank you. CHAD KELLER, PLA LANDSCAPE ARCHITECT CITY OF TUCSON, PDSD, SITE REVIEW SECTION CHAD.KELLER@TUCSONAZ.GOV 520.837.4923 |
|||
| Site Zoning * | REVIEW COMPLETED | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Krista Hansen, Lead Planner PROJECT: Pre-submittal meeting TP-PRE-1026-00210 Parcel: 12406249A, 124062470, 12406245A Address: 1010 E 10TH ST Zoning: C-2 / R-2 Existing Use: Civic – Educational Use Proposed Use: Mixed-Use Development (Commercial – Food Service, Retail) TRANSMITTAL DATE: 11/5/2026 COMMENTS: 1. Any proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package (DP). Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency. 2. The site will require a lot combination processed through Pima County Assessors before final approval is provided to submitted plans: www.asr.pima.gov/Downloads/Forms/ComboRequest.pdf. 3. The site is zoned C-2 and R-2 and is located in the optional Sunshine Mile Urban Overlay District (UOD) in the Park Subarea. The proposed uses are Commercial – Food Service and Retail – General Merchandise Sales, which are permitted in the Park Subarea UOD. The following comments are related to the proposed Adaptative Reuse development utilizing the Sunshine Mile District (SMD) optional overlay per UDC 5.13. 4. Show compliance with the SMD Section III Standards and Guidelines: a. To qualify for Adaptive Reuse incentives, a Project must include a change of occupancy, change in use, interior modifications and/or exterior modifications that incorporates and retains the existing structure. b. Clearly show how Open Space requirements are met (SMD Section III.J). c. Clearly show how Environmentally Conscious Design Practices are met (SMD Section III.M). Adaptive Reuse of an existing structure (may count as 3 of the 7 required). 5. Show compliance with the Park Subarea Dimensional Standards (Figures IV.A.3.a(2)(a)-(d)) and Development Standards. a. Max lot coverage = 85% b. Open Space = Min 10% of lot area; Min Landscaped Area = 30% of Public Open Space 6. Motor Vehicle parking ratios (SMD Table III.H.1). Ensure compliance with UDC 7.4.6, Design Standards and ADA parking requirements/standards (www.ada.gov/topics/parking). a. Mixed-Use Developments (no more than 50% of the GFA is dedicated to Alcoholic Beverage and Food Services) = 1 space/500 sq. ft. GFA b. Per Table III.H.2: no parking is required for uses with ratio of fewer than 1 space/300 sq. ft. 7. Bicycle parking ratios (SMD Section III.H.5). Show compliance with UDC 7.4.9, Design Standards. Short-term bike parking: 1 space/5,000 sq. ft. 8. Provide a pedestrian circulation path that connects all areas of development on-site and to any adjacent street frontage. The path must be ADA accessible and a minimum of 4’ wide (TSM 7-01). 9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at krista.hansen@tucsonaz.gov. |
|||
| TW New Area Development * | REVIEW COMPLETED | Based on the information provided, Tucson Water has no objections to the proposed development. The two existing buildings are currently connected to Tucson Water’s distribution system. The building on the west (left) side is served by a 1-inch water service line with a 1.5-inch commercial/irrigation meter connected to the 6-inch cast-iron water main (Zone A) along N. Park Avenue. The building on the east (right) side is served by a 2-inch water service line with a 2-inch water meter connected to the 6-inch asbestos-cement water main along N. Fremont Avenue. The water pressure along N. Park Avenue (left side) ranges from 35 psi to 42.0 psi at an elevation of 2,508 ft. The water pressure along N. Fremont Avenue (right side) ranges from 72.62 psi to 79.62 psi at an elevation of 2,461 ft. Water pressure may vary by an additional ±5 psi. The proposed development may experience higher-than-normal water pressure, and individual pressure-reducing valves (PRVs) may be required as part of the private plumbing system. The existing building is also served by two 4-inch fire service lines, one on each side of the building. Both services are connected to the water mains referenced above. If these fire service lines are to be abandoned due to reconfiguration of the existing facilities and new service connections are required, please contact Tucson Water’s New Services Section at 520-791-5164 or TW_Common@tucsonaz.gov. The comments above are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposed development. Any questions, comments, or concerns regarding this review may be directed to Deepesh Dawadi, Engineering Manager, at Deepeshraj.Dawadi@tucsonaz.gov. |