Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TP-PRE-0926-00186
Parcel: 12008508A

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0926-00186
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction * REVIEW COMPLETED TP-PRE-0926-00186 • Pre-Application Conference Review v1 • 550 W IRVINGTON RD TUCSON, AZ 85714:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review * REVIEW COMPLETED Provide existing and future ROW lines per updated Major Streets & Routes map.
Close all unused curb openings; restore curb and sidewalk per PAG Standards.
4 ft sidewalks require a 5 ft by 5 ft passing space at intervals not exceeding 200ft (TSM 10-01.4.1.a.1); Sidewalk along Irvington Rd will require a 5’x5’ passing space
S. 11th Ave. is a local street. Provide a COT SD 206 driveway apron unless it can be
demonstrated that the driveway will exceed 100 trips per day (ADT), meeting the criteria for the use of curb returns on local streets per TSM 10-01.4.3.B. See new COT SD for driveways in attachments.
Contact ROW Engineering at ROWEngineeringReview@tucsonaz.gov if you have any questions.
Site Engineering * REVIEW COMPLETED Permit Activity Number: TP-PRE-0926-00186
Project: Professional offices and commercial mixed use
Location: 550 W IRVINGTON RD
Review Date: 10/8/2026
Reviewer: Marco Contreras & Joe Macaulay
Related Cases:
Krista Running
*This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-6 and Technical Standards Manual (TSM) Section for waste management, Pedestrian Access, Hydrology -Retention/Detention Requirements, and all site standard code.*
City of Tucson Code: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes
Drainage Manual Link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/cot-drainage-manual-searchable.pdf
Design standards for Stormwater Detention and Retention Link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
Site Engineering Review Comments:
1. The proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package. Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency.
2. A full drainage report shall be submitted with the application for the associated development package submittal. The report must demonstrate compliance with all applicable City of Tucson stormwater management requirements, including first-flush retention and critical basin detention. The following references from the Standards Manual for Drainage Design and Floodplain Management (COT Drainage Manual) and the Design Standards for Stormwater Detention and Retention Manual (DSSDR) shall govern report preparation:
a. Report Formatting & Content: COT Drainage Manual §2.3; DSSDR Chapter 10
b. Flood Peak Estimation: COT Drainage Manual Chapter 4
c. Erosion Hazard Assessment: COT Drainage Manual Chapters 6 & 7
d. Drainage Facility Design Standards: COT Drainage Manual Chapters 9–11
e. First-Flush Retention & Detention Guidelines/Triggers: DSSDR Chapters 2, 3, & 4
f. NOTICE: The site is located within the Rodeo Wash watershed and as such carries a Critical Basin designation.
3. Geotechnical Investigation Report — A Geotechnical Investigation Report prepared and sealed by a Professional Engineer registered in the State of Arizona is required [IBC 1803] and shall be submitted with the associated Development Package submittal. At a minimum, the report shall address the following:
a. Soil Bearing Capacity & Site Classification — Allowable soil bearing capacity, seismic site classification, expansive soil identification, and groundwater conditions, with all applicable foundation design recommendations for the proposed construction.
b. Grading & Earthwork — Recommendations for site preparation, fill compaction standards, and the suitability of on-site materials for reuse as engineered fill.
c. Pavement Design — Pavement design recommendations for all proposed drive aisles, parking areas, and access improvements, including R-value or CBR test results as applicable.
d. Retaining Walls (if applicable) - Backfill requirements and wall foundation recommendations.
e. Drainage Manual 14.2.6 Items — Soil classification, soil erodibility, soil permeability and infiltration rate, slope stability, and groundwater elevation; a recommended minimum setback from buildings and other structures; an evaluation of whether hydro-collapsing soils are present on the site; and the boring log(s) and laboratory results supporting the above based on the required 30-foot boring test.
4. Grading and Stormwater — The Development Package submittal shall include a grading plan showing both cut and fill quantities (cubic yards) and the total area of disturbance, expressed in both square feet and acres. [TSM 2-01.0.0]
a. Where the total area of disturbance is one (1) acre or more — or is part of a larger common plan of development that will ultimately disturb one acre or more — coverage under the AZPDES Construction General Permit is required. The applicant shall prepare a Stormwater Pollution Prevention Plan (SWPPP) and file a Notice of Intent with ADEQ prior to the start of any earth-disturbing activity.
b. A dust control permit from the Pima County Department of Environmental Quality is required separately and is triggered at the same threshold as the SWPPP. Confirm applicability with PDEQ prior to commencing site work.
5. Applicable Waste Management Standards:
a. Provide the Waste Stream Calculations for the entire site on the Development Package cover sheet or where able to on the plan set. [TSM 8-01.8.0]
b. Provide a trash enclosure detail(s) that is compliant with TSM 8-01.0.0. This should include all necessary information as well as include the required minimum clear space. This detail should be comparable to figures found in TSM 8-01.9.0.
c. Provide a detail displaying trash truck maneuverability for the trash enclosure in compliance with Technical Standards Manual, show it falls in compliance with back-up requirements. Maneuverability dimensions for operation are 14’x40’ & 28’x40’ for two enclosures. TSM 8-01.5.3 and TSM 8-01.5.3.F
d. All commercial developments are required to provide adequate space/capacity for both solid waste & recycling services [TSM 8-01.5.1.A]
6. “Covered Parking - Parking lot canopies” – To review for compliance with UDC 7.4.6.F.2 & UDC 7.4.6.E.2. It is required that the required the canopies proposed either follow the required height clearance of 15 – feet or be setback one foot or greater from the PAAL. At time of submission, ensure to provide a height call-out showing the clearance or show on the site plan that the 1-foot setback is addressed. This will need to be shown both on plan-view as well as an elevation detail.
7. Sidewalks shall be flood free for all storm discharges of up to and including a ten-year frequency flood event. Drainage flowing across all pedestrian circulation paths shall be designed and constructed to convey flows under the path for up to and including the ten-year frequency flood events, except at street intersections, pedestrian crossings, and PAAL pedestrian crossings. [TSM 7-01.4.1.E & 7-01.4.3.E]
a. Provide keynotes and call-outs identifying all downspouts and sidewalk scupper locations on all related site plans and/or building sheets. This information is required to demonstrate compliance and to ensure coordination with building permit plan review.
b. If downspouts from rooftops are to be discharged at grade-level, ensure that the stormwaters up to and including flow from a 10-year event are directed away from accessible parking stalls.
8. Show that sidewalks in front of parking spaces maintain a minimum 4-foot unobstructed width per TSM 7-01.4.3 A. The parking spots must have wheel stops or the sidewalk must be 6.5 feet in total width to ensure that vehicles do not obstruct the 4-foot width.
a. Wheel Stops Required at Sidewalk-Adjacent Spaces -Wheel stops are required at all parking spaces that abut a sidewalk or pedestrian circulation path where the sidewalk width would be reduced to less than 4 feet by vehicle overhang. [UDC 7.4.6.H]
9. Provide dimensions for all curb return radii at the following locations: Internal drive aisles and roadway access points.
a. Confirm that all curb return radii comply with the dimensional requirements of Chapter 25, Streets and Sidewalks Standards and UDC 7.4.6.E.1.a. Where existing curb returns are to remain, document the existing radii and confirm compliance or identify any required modifications.
10. Sight visibility triangles (SVT) will need to be shown at any and all site access points from designated MS&R’s:
a. 12th AV has a current designation as an Arterial Road. Sight visibility triangles (SVT) will need to be shown for existing & proposed ROW for all entrances/exits to the site. [TSM 10-01.5.0]
11. Move wall on the north to remain out of the easement,
12. Depending on ROW Engineering determination - Demonstrate throat length compliance in accordance with Access Management Guidelines 5.11; the length must be 60 feet or greater for the access off of 12th AV. City of Tucson Transportation Access Management Guidelines: https://www.tucsonaz.gov/files/sharedassets/public/v/1/transportation-and-mobility/dtm/documents/cot-access-management-guidelines_update_december_2011_final.pdf



*** *NOTICE: These comments are provided for pre-application purposes only and are based solely on the conceptual information submitted to date. This review does not constitute an approval, and compliance with these comments does not guarantee approval of a subsequent submittal. Additional comments, including comments on items not addressed here, may be issued during formal review of the Development Package as more detailed plans become available.*


If you have any questions or concerns, please contact marco.contreras@tucsonaz.gov
Site Landscape * REVIEW COMPLETED PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PROFESSIONAL OFFICES AND COMMERCIAL MIXED USE
ACTIVITY NO: TP-PRE-0926-00186
ADDRESS: 550 W IRVINGTON RD
ZONING: COMMERCIAL ZONE (C-2)
LAND USE: COMMERCIAL/OFFICE USE
10.5.2026

THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING.

SITE LANDSCAPE/NPPO COMMENTS:

1. UDC 7.6.2. APPLICABILITY
The provisions of this section apply to the following: All new developments require the submittal of a landscape plan set. Preparation of the landscape plans shall adhere to UDC 7.6 and Administrative Manual 2-10.

2. Parking lot canopy trees are required at 1 tree for every 4 parking spaces provided, see UDC 7.6.4.B. Structurally covered parking spaces do not count toward the ratio, see UDC 7.6.4.B.1.c (8). Trees are to be distributed evenly throughout the parking area, see UDC 7.6.4.1.a.(1). See Technical Standards Manual 5-01.3.0 for additional landscaping in vehicular use area requirements.

3. Interior landscape borders per UDC 7.6.4.C.3 and Table 7.6.4-1 and proposed Commercial Land Use:
A. An interior landscape border is required on commercial land use sites adjacent to residence zones. This is the case at the northeast property line of this proposal. This border will require trees and a 5’ wall at the property line. **THE EXISTING WALL APPEARS NOT TO BE ON THE PROPERTY LINE AS THE CODE REQUIRES. THIS WALL MAY BE USED TO SATISFY THE SCREENING REQUIREMENT WITH A DESIGN DEVELOPMENT OPTION (DDO) APPROVAL. THIS APPROVAL REQUIRES DRC REVIEW AND APPROVAL. SEE DDO AND VARIANCE REFERENCES, REQUIREMENTS AND PDSD CONTACTS FOR GUIDANCE IN COMMENTS BELOW.

4. Street landscape borders per UDC 7.6.4.C.2 and Table 7.6.4-1 and proposed Commercial land use along MS&R and non-MS&R:
A. W. Irvington Rd. and S. 12th Av. are both major local roads and require 10’ street landscape borders and a 30” screen located at the rear perimeter of the landscape border. S. 11th Av. is a minor local road and requires a 10’ street landscape border and a 5’ screen located at the rear perimeter of the landscape border. All street landscape borders should be designed on the project side of the ROW/Future ROW.

5. DTM review is required for all planting and irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) for review and approval if applicable for this project.

6. A drip irrigation plan and details are required for all proposed landscape planting areas.

7. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.

8. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required. The Rainwater Harvesting Plan shall consist of two elements: a Site Water Budget and a Water Harvesting Implementation Plan. Preparation of the Rainwater Harvesting Plan elements requires coordination between project managers, site engineers and landscape architects from the inception of the project. The two elements of the Rainwater Harvesting Plan shall illustrate water harvesting how will meet 50% of annual landscape water demand, as required by the ordinance.

9. Coordinate the Landscape Plan, Commercial Rainwater Harvesting Plan and the Civil Grading Plans to have identical basin size, grades/percent slopes, spot elevations and curb cut inlet and outlet locations.

10. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area.

11. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0. Or see City of Tucson Ordinance 10597 -- Sec. 6-182. Rainwater Harvesting Plan: Number 3 (a) A separate water meter connected to the main water supply; or (b) An irrigation sub-meter.

12. **If it is determined that any of the above provided site landscape standards cannot be met due to the nature of the development, then a Design Development Option (DDO) may be an option to gain partial relief from some landscape requirements, see UDC 3.11.1.B.3 for landscape and screening modifications allowed. A Board of Adjustment Variance to the UDC site landscape requirements is also a viable alternative. Please reach out to Mark Castro or Georgia Pennington with PDSD for more information on the DDO and Variance process. Mark.Castro@tucsonaz.gov – Georgia.Pennington@tucsonaz.gov

Thank you.

CHAD KELLER - PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON – PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
Site Zoning * REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Krista Hansen, Lead Planner
PROJECT: Pre-submittal meeting TP-PRE-0926-00186

Parcel: 12008508A
Address: 550 W IRVINGTON RD
Zoning: C-2
Proposed Use: Commercial Services - Administrative and Professional Office

TRANSMITTAL DATE: 10/8/2026

COMMENTS:
1. Any proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package (DP). Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency.
2. The site is zoned C-2. The proposed use is Commercial Services - Administrative and Professional Office, which is permitted, subject to UDC use specific standards 4.9.13.P. Clarify which Uses will make up the “mixed use” building. Please note: depending on the Use, there may be additional Use Specific Standards and/or parking requirements.
3. Dimensional Standards per UDC Table 6.3-4.A:
a. Rear (north) setbacks: 0 ft (adjacent to C-2 ); 1½(H) of adjacent building wall (adjacent to R-2)
b. Street setback to 11th Ave: 20 ft (minor local road)
c. Street setback to Irvington Rd and 12th Ave: 10 ft (Major Street & Route)
4. Motor Vehicle parking ratios (UDC Table 7.4.4-1). Commercial Services: 1 space per 300 sq. ft. GFA. Show compliance with UDC 7.4.6, Design Standards and ADA parking requirements/standards (www.ada.gov/topics/parking).
a. Add wheel stops to spaces 1 through 12 (adjacent to Office Building) to ensure 4 ft min clearance for pedestrian access.
5. Bicycle parking ratios (UDC Table 7.4.8-1). Administrative and Professional Office: 2 short-term spaces and 2 long-term spaces. Show compliance with UDC 7.4.9, Design Standards.
6. Electric vehicle supply equipment (EVSE) parking ratios (UDC Table 7.4.11-1). Administrative and Professional Office: 5% EV Ready and 15% EV Capable. Show compliance with UDC 7.4.12, Design Standards.
7. Provide a pedestrian circulation path that connects all areas of development on-site and to any adjacent street frontage. The path must be ADA accessible and a minimum of 4’ wide (TSM 7-01).
8. The proposed plans show an existing masonry fence within the utility easement. To remain in this location, approval from the utility company is required.
9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at krista.hansen@tucsonaz.gov.
TW New Area Development * REVIEW COMPLETED Based on the information provided, Tucson Water has no objections to the proposed development.
There’s an existing 5/8-inch water meter currently serving the lot. This service is connected to 12-inch cement asbestos water main (B Zone) located within the south side of the parcel within the right-of-way of W Irvington Rd.
There is an existing 6-inch fire hydrant at the corner of W Irvington Rd and S 11th Ave
Water pressure in this area is 52-59 PSI at an elevation of 2464ft. Water pressure can vary by an additional 5 psi +/-.
If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.
The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to Abdullah Salman (Project Manager) at Abdullah.Salman@tucsonaz.gov.