Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0924-00224
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Fire New Construction | REVIEW COMPLETED | TP-PRE-0924-00224 • Pre-Application Conference Review v1 • 770 N KOLB RD TUCSON, AZ 85710: Based on the information provided, TFD has the following comments: 1. Provide Knox access at gates. IFC 24, 503.6, 506.1 2. Verify hydrant coverage. IFC 24, 507.5.1 Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
ROW Engineering Review | REVIEW COMPLETED | DTM has no comments. | |||
Site Engineering | REVIEW COMPLETED | TP-PRE-0924-00224 770 N KOLB RD Site engineering comments are as follows: 1. Pedestrian circulation is required to connect all buildings, dumpster areas, common use areas, and the sidewalk on the street frontage per TSM 7-01.3.3. Show a continuous pedestrian path that maintains a 4-ft unobstructed width from the offices to the public frontage. 2. Provide waste stream calculations and waste enclosure specifications compliant with TSM Section 8. Ryan Insalaco Engineering Associate City of Tucson Planning & Development Services Department Email: ryan.insalaco@tucsonaz.gov Phone: (520) 837-5351 |
|||
Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: ADDITION OF EXTERIOR STORAGE UNITS TO THE EXISTING EXTRA SPACE STORAGE FACILITY ACTIVITY NO: TP-PRE-0924-00224 ADDRESS: 770 N KOLB RD ZONING: PAD-3 GATEWAY CENTRE PAD LAND USE: MULTIUNIT STORAGE FACILITY This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to ensure compliance with the applicable UDC development criteria and Technical Standards. PAD-3 GATEWAY CENTRE PAD SITE LANDSCAPE COMMENTS: 1. See page IX-31 Landscape Concept: The landscape concept for Gateway Centre (Exhibit 15) will unify and set the character for this urban space; repletion of a common theme and drought resistant, low maintenance plant materials will strengthen and enhance this image. (Basic landscaping specifications have been included in Appendix B.) Where a variety of architectural approaches are permitted for buildings, continuity must be assured by coordinated landscaping, signage, street furniture and lighting. Several elements are proposed in the landscape concept, including: a. project entries/streetscape b. buffering/community wall c. protective screening for misdirected golf balls along residential and riverpark boundaries d. perimeter landscaping/parking e. major pedestrian ways/plaza area f. open space g. river park 2. See page IX-10 of the PAD-3 document, Section C, Site Development, Landscape/Screening for landscape requirements. 3. See page IX-40 of the PAD-3 document for Development Area 3 landscape requirement. #5 Parking Requirements: Required spaces, screening and landscaping shall be determined at the ratios set forth in the Unified Development Code (UDC) See comments below for UDC 7.6.4 landscape requirements. #6 Minimum Landscape Coverage: 10% of gross site area. Include the 10% landscape coverage calculation on the landscape cover sheet. 4. See page IX-52 of the PAD-3 document, Section E for Landscaping Alternatives. This section states: Although the Plan provides landscape specifications for Developing Areas in the Centre, the developer of properties in Gateway Centre is encouraged to utilize the City of Tucson Xeriscape and Screening Standards DS#2-06.0 approved since adoption of this Plan in January 1983. 5. See page IX-53 of the PAD-3 document: Landscape and Maintenance Plan. A landscape and maintenance plan at a scale of l inch = 20 feet showing the location, size and species of all plant material, and the proposed water or irrigation system to be used, along with a maintenance schedule. QUESTIONS ANSWERED FOR THE APPLICANT; ADDITIONAL CLARIFICATION ON WALLS VS. FENCES AT THE BORDER OF THE SITE: PAD-3 Wall/Fence requirements found on IX-11: - A combination of landscaping, fences and walls shall be used on the perimeter of properties to define property limits, separate use areas, and provide on-site security. Fencing, walls and other structural barriers should be designed of similar materials, colors and general style as the primary buildings on a site. - Landscaping, fences and walls, or a combination, shall be utilized to visually screen and/or physically enclose outdoor storage areas, loading docks and ramps, transformers, storage tanks, and other appurtenant items of poor visual quality. - Parking and outdoor storage areas shall be screened from view off the property by the use of fencing, walls and/or landscaping. -Fence and wall heights shall generally be as tall as those objects or areas they are intended to visually screen; however, no fence or wall shall exceed six feet in height. GENERAL UNIFIED DEVELOPMENT CODE, SITE LANDSCAPE/NPPO COMMENTS FOR AN EXPANSION OF 25 PERCENT OR GREATER: 6. A NPPO or a NPPO Waiver is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, must be submitted and approved or a request for an exception from the Native Plant Preservation requirements shall be approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Administrative Manual Section 2-11.0.0 prior to Grading Plan approval. PDSD will provide the applicant with the NPPO Waiver form upon request. 7. A landscape plan is required per UDC 7.6.2.B.1-b. The Unified Development Code requires all new development, or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10. 8. Provide the required number of trees in all vehicular parking areas (1 tree to 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a. 9. A Multiunit Storage Facility adjacent to Office and Residential land use requires interior landscape borders per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. The border requirement for all borders of this site is a 6-foot wall. See PAD-3 document for further explanation of the wall/fence requirement at the perimeter of the site. 10. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 11. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required. The Rainwater Harvesting Plan shall consist of two elements: A Site Water Budget Calculation Spreadsheet and a Water Harvesting Implementation Plan. Preparation of the Rainwater Harvesting Plan elements require coordination between project managers, site engineers and landscape architects from the inception of the project. The two elements of the Rainwater Harvesting Plan shall illustrate how water harvesting will meet 50% of annual landscape water demand, as required by the ordinance. If a copy of the Site Water Budget Spreadsheet is needed, please reach out to the contact information at the bottom of these comments. 12. Ensure that the Landscape Plan, the Commercial Rainwater Harvesting Plan and the Civil Grading Plans are coordinated to show identical basin size, grades, spot elevations and curb cut locations. 13. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area. 14. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0 If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
|||
Site Zoning | REVIEW COMPLETED | CDRC Thursday Pre-Submittal Transmittal FROM: Nicholas Martell, Principal Planner PDSD Zoning Review PROJECT: Pre-submittal meeting TP-PRE-0924-00224 Address: 770 N Kolb Zoning: PAD-3 Existing Use: Storage-Personal Storage Proposed Use: Storage-Personal Storage TRANSMITTAL DATE: October 9, 2024 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06, Development Package 2. A Personal Storage use is not permitted in PAD sub-area 3. However, based on a clarification letter in 2021, the sub-area shall be subject to the use standards found in the C-1 of the Unified Development Code. 3. Page 1 of the clarification letter, which is a minor amendment to the PAD, mentions providing flexibility for new retail, office, multifamily and other potential uses. 4. Per PAD document page IX-40, the following dimensional standards apply: a. Height Maximum: Not to exceed 45 feet. Exception: The hotel not to exceed 75 feet, exclusive of elevator mechanisms. b. Lot Coverage: N/A c. Lot Size: N/A d. Minimum Building setback from Public (or Private, see AD note II.B.5) Streets: A distance equal to 60 percent of building height, but not less than 20 feet e. Maximum FAR: 4.0 f. Maximum Building Coverage: 90 percent at ground level; 60 percent above ground level 5. Ensure compliance with Table 7.4.4-1: Minimum Number of Motor Vehicle Spaces Required. 6. Ensure access for the proposed southern parcel complies with section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual. 7. Ensure long-term bike parking is provided per UDC Table 7.4.8-1. 8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Nicholas.Martell@tucsonaz.gov. |
|||
TW New Area Development | REVIEW COMPLETED | TP-PRE-0924-00224 - Pre-Application Conference Review v1 – 770 N KOLB RD Tucson Water has no objections to the proposed development and offers the following comments for your convenience: 1. The preliminary site plan submitted for review does not show all the public water mains and water easements on the property. Please see Tucson Water’s NW081415valve map and the Tucson Water’s As-Built Plan No. 140-1991. Copies of these documents may be obtained by requesting them from Tucson Water’s Mapping and GIS Center by sending an email request for them to twmapinfo@tucsonaz.gov 2. The proposed gates across the water easements will need to be capable of opening the full 15’ width of the water easements. Provisions will need to be made to allow Tucson Water’s Operations and Maintenance staff to open those gates at any time of the day and night, if necessary to respond to water main breaks. 3. Any plantings over, or immediately adjacent to, the existing water mains will need to comply with Section 8-08.4.3 of Tucson Water’s Design Standards Manual. 4. If you have any questions about any new domestic water, irrigation water, or fire water services needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |