Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0923-00332
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0923-00332 • Pre-Application Conference Review v1 • 5020 E GLENN ST TUCSON, AZ 85712: Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
Site Engineering REVIEW COMPLETED Site engineering has no objections to or comments on the proposed land division.

Lianne Evans
lianne.evans@tucsonaz.gov
Site Landscape REVIEW COMPLETED Landscape/NPPO has no concerns or questions about the proposed project.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Georgia Pennington, Planner

PROJECT: TP-PRE-0923-00332
Parcel(s): 110-12-1020
Current Zoning: PAD-16
Existing Use: Medical Service – Extended Health Care
Proposed Use: Medical Service - Extended Health Care

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-07 – Minor Subdivision.

2. The existing zone is PAD-16. Medical Service – Extended Health Care is a permitted use in the PAD-16 zone, subject to use-specific standards 4.9.13.E (Section 4.8.6)

3. Maximum Height: 28 Feet (Pad-16 document page 56)

4. Motor Vehicle Space requirements (Table 7.4.4-1):
a. 1 space/2 beds

5. Bicycle Parking Requirements (Table 7.4.8-1):
a. Short term: 0.05 spaces per bedroom (min 2)
b. Long term: .15 spaces per bedroom (min 2)

6. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Georgia.Pennington@tucsonaz.gov.
Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
TW New Area Development REVIEW COMPLETED TP-PRE-0923-00332 - Pre-Application Conference Review v1 – 5020 E GLENN ST

Tucson Water has no objections to the proposed development and offers the following comments for your convenience:

1. Tucson Water’s Remote Meter Policy prohibits the private water line from a water meter to a building on one lot from lying on, or crossing, any other lot. Please verify that the private water line for the existing building on proposed Lot 2 does not encroach into proposed Lots 1 or 3. If it will, a new water meter for the existing building on Lot 2 will need to be installed in the street frontage of Lot 2 and a new private water line run from this new water meter to the existing building on Lot 2.

2. If a new water is needed, please contact Tucson Water’s New Services Section to discuss the details of this process by sending an e-mail to TW_Common@tucsonaz.gov.

The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov