Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0923-00325
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Design Review | REVIEW COMPLETED | Your property is within the boundaries of the Rio Nuevo Area (RNA) overlay zone. Your project will need to demonstrate compliance with the requirements of the RNA. Please submit a special districts application as a sub-record of this permit. Please see the Special District Application Instructions and the Rio Nuevo Area Design Review process guides for a complete list of requirements: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/submission-documents/special_districts_application_instructions_7.18.23.pdf https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/planning-amp-zoning/rna_application_and_review_process.pdf For any questions, please email me at maria.gayosso@tucsonaz.gov. Thanks. |
|||
Fire New Construction | REVIEW COMPLETED | TP-PRE-0923-00325 • Pre-Application Conference Review v1 • 192 S STONE AV TUCSON, AZ 85701: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
Historic | REVIEW COMPLETED | ||||
Site Engineering | REVIEW COMPLETED | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview 1. The carport structure must be set back 1 foot from the edge of the parking and access lane per UDS 7.4.6 F2. Lianne Evans lianne.evans@tucsonaz.gov |
|||
Site Landscape | REVIEW COMPLETED | Landscape/NPPO has no questions or concerns about this proposed project based on the information provided. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
|||
Site Zoning | REVIEW COMPLETED | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Georgia Pennington, Planner PROJECT: TP-PRE-0923-00325 Parcel(s): 117-20-024A Current Zoning: C-3 Existing Use: Religious & Administrative/Professional Office Proposed Use: Solar Canopy COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 – Minor Development Package. The Development Package is a separate submittal from the building permits, and the building permits cannot be approved until the Development Package is approved. Please visit this link for a checklist on Minor Development Package: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf 2. Lot combination may be required if proposing construction crossing property lines. 3. Contact Sonya Bermudez to complete DP17-0019 (sonya.bermudez@tucsonaz.gov). Only one Development Package is allowed to be open per site. 4. The existing zone is C-3. Religious and Administrative/Professional Office are both permitted uses in the C-3 zone. (Section 4.8.6) 5. There is an existing DP on file for reference (DP17-0019). 6. Maximum Height (Table 6.3-4.A): 75 Feet 7. Setbacks (Table 6.3-4.A): a. Front/Side Street: 20’ b. Side/Rear: 0’ 8. Parking Area Access Lanes (PAAL) shall be 24 feet wide for 2-way traffic and fire access. 9. The canopy must be setback 1' from the edge of the parking and access lane ( 7.4.6.F.2.) 10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Georgia.Pennington@tucsonaz.gov. |
|||
Traffic Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
|||
TW New Area Development | REVIEW COMPLETED | TP-PRE-0923-00325 - Pre-Application Conference Review v1 – 192 S STONE AV 1. Tucson Water has no objections to, or comments on, the proposed development. 2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |