Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0825-00171
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Fire New Construction * | REVIEW COMPLETED | TP-PRE-0825-00171 • Pre-Application Conference Review v1 • 2160 N 6TH AV TUCSON, AZ 85705: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review * | REVIEW COMPLETED | No Impact to ROW | |||
| Site Engineering * | REVIEW COMPLETED | Permit: TP-PRE-0825-00171 Location: 2160 N 6TH AV Review Date: 9/18/2025 Site Engineering Comments: 1. Site Engineering has no comments or concerns for this proposal at this time. If you have any questions or concerns, please contact Marco Contreras Marco.contreras@tucsonaz.gov |
|||
| Site Landscape * | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: INSTALL A 1MW, 5.4 MWH LITHIUM IRON PHOSPHATE BATTERY ENERGY STORAGE SYSTEM ACTIVITY NO: TP-PRE-0825-00171 ADDRESS: 2160 N 6TH AV ZONING: R-2 RESIDENCE ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards. SITE LANDSCAPE/NPPO COMMENTS: 1. Existing protected native vegetation (Palo Verde) may be affected by the wall installation. Provide replacement trees at the required mitigation ratio if these protected natives are scheduled for removal. Transplanting may be a viable option. Transplanting requires one additional mitigation Palo Verde for every one moved. See UDC 7.7 for NPPO standards. If the Palo Verde are within the construction limits and are planned to be preserved, then provide preservation fencing for the trees. 2. No other comments or concerns with the installation of this battery energy storage system. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
|||
| Site Zoning * | REVIEW COMPLETED | ||||
| TW New Area Development * | REVIEW COMPLETED |