Plan Number: TP-PRE-0825-00171
Parcel: 11501155W

Address:
2160 N 6TH AV

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0825-00171
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction * REVIEW COMPLETED TP-PRE-0825-00171 • Pre-Application Conference Review v1 • 2160 N 6TH AV TUCSON, AZ 85705:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review * REVIEW COMPLETED No Impact to ROW
Site Engineering * REVIEW COMPLETED Permit: TP-PRE-0825-00171
Location: 2160 N 6TH AV
Review Date: 9/18/2025
Site Engineering Comments:
1. Site Engineering has no comments or concerns for this proposal at this time.
If you have any questions or concerns, please contact
Marco Contreras
Marco.contreras@tucsonaz.gov
Site Landscape * REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: INSTALL A 1MW, 5.4 MWH LITHIUM IRON PHOSPHATE BATTERY ENERGY STORAGE SYSTEM
ACTIVITY NO: TP-PRE-0825-00171
ADDRESS: 2160 N 6TH AV
ZONING: R-2 RESIDENCE ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards.

SITE LANDSCAPE/NPPO COMMENTS:

1. Existing protected native vegetation (Palo Verde) may be affected by the wall installation. Provide replacement trees at the required mitigation ratio if these protected natives are scheduled for removal. Transplanting may be a viable option. Transplanting requires one additional mitigation Palo Verde for every one moved. See UDC 7.7 for NPPO standards. If the Palo Verde are within the construction limits and are planned to be preserved, then provide preservation fencing for the trees.

2. No other comments or concerns with the installation of this battery energy storage system.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
Site Zoning * REVIEW COMPLETED
TW New Area Development * REVIEW COMPLETED