Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0725-00136
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Fire New Construction * | REVIEW COMPLETED | TP-PRE-0725-00136 • Fire New Construction • Pre-Application Conference Review v1 • 7777 E STELLA RD TUCSON, AZ 85730: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review * | REVIEW COMPLETED | Traffic Impact Analysis will be required. Private Improvement Agreement will be required during the DP review process. Add knuckle design between lots 5-8. Recommend added knuckle design between lots 74-75 for traffic calming |
|||
| Site Engineering * | REVIEW COMPLETED | TP-PRE-0725-00136 7777 E STELLA RD Site engineering comments are as follows: 1. Provide topographical data prior to development. If fill is to be placed so that home pads are elevated more than 2 feet, plus the thickness of the slab, above existing grade at any location within the outer 100 feet of the development, the requirements of the differential grading administrative process shall be applied.. UDC Article 2-01.8.1.A. 2. Depending on the elevation difference between the development and the adjacent existing grade, the top and toe of the fill slope must meet the guidelines set forth in TSM 2-01.9.0. 3. The top of cut slopes shall not be made nearer the site boundary line than one fifth of the vertical height of cut with a minimum of two feet and a maximum of ten feet. 4. The toe of fill slope shall be made not nearer to the site boundary line than one half of the height of the slope with a minimum of two feet. and a maximum of 20 feet. Where a fill slope is to be located near the site boundary and the adjacent off-site property is developed, special precautions shall be incorporated in the work as PDSD deems necessary to protect the adjoining property from damage resulting from such grading. 5. Trash service to lots 6 and 7 may cause the trash truck to be required to back up more than 80 feet. This may require Environmental Services review and approval. TSM Section 8. Andy Vera - Environmental Services Andy.Vera@tucsonaz.gov 6. Because the proposed area of disturbance is greater than one acre, a Stormwater Pollution Prevention Plan (SWPPP) is required for the site. This document is required for review of the Development Package. 7. Because of the infrastructure requirements necessary to create code compliant functional lots, a tentative plat showing all improvements including road, sewer, and water infrastructure will be required prior to submission of a Final Plat. Should construction of these improvements not be possible prior to the subdivision of the parcel, an assurance agreement will be required. Administrative Manual 2-06 8. Any required retention / detention basins will need to be located on common area per UDC Art 7.11.1.A & B 9. There shall be a buffer around basins to allow for maintenance. 10. Please provide dimensions on all streets for the formal submittal. Ryan Insalaco – ryan.insalaco@tucsonaz.gov (520) 937-5351 |
|||
| Site Landscape * | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: PROPOSED 98-LOT FLEXIBLE LOT DEVELOPMENT RESIDENTIAL SUBDIVISION ACTIVITY NO: TP-PRE-0725-00136 ADDRESS: 7777 E STELLA RD ZONING: R-1 RESIDENCE ZONE LAND USE: FLEXIBLE LOT DEVELOPMENT (FLD) This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards. FLEXIBLE LOT DEVELOPMENT SITE LANDSCAPE COMMENTS: 1. UDC 8.7.3.H -- LANDSCAPING, SCREENING AND WALL REQUIREMENTS: 1. FLD projects shall comply with Section 7.6, Landscaping and Screening Standards, except as otherwise provided by this section. 2. One canopy tree shall be provided for every 40 feet of pedestrian circulation systems, excluding crossings with streets, alleys, and driveways. If providing canopy trees every 40 feet is not achievable, the applicant shall: a. Provide the equivalent number of trees that would be obtained using the 40-foot increment measure; and, b. Distribute the trees within the FLD project site along pedestrian circulation systems and within functional open space areas. 3. Landscape plans shall incorporate water-conserving design as defined in Section 7.6.6, Use of Water, and as described in the Technical Standards Manual. 4. Water harvesting techniques shall be incorporated as part of the landscape design based on the Water Harvesting Guidance Manual prepared for the City of Tucson Transportation Department Stormwater Section. 5. Mechanical equipment, utility boxes, irrigation equipment and similar elements shall be screened from adjacent streets exterior to the project and from adjacent existing residential development. Screening shall be architecturally integrated with the overall design of the FLD. 6. If a perimeter wall is proposed along an existing public right-of-way, it shall be constructed of, or painted with, graffiti-resistant materials. The wall shall incorporate one or more of the following decorative materials: a. Tile; b. Stone; c. Brick; d. Adobe; e. A textured material such as stucco or plaster; or, f. Metal. 2. UDC 8.7.3.F: OPEN SPACE REQUIREMENTS. See Table 8.7.3-2 for Functional Open Space Standards. 3. UDC 8.7.3.F.2 CONFIGURATION AND LOCATION OF FUNCTIONAL OPEN SPACE WITHIN AN FLD PROJECT ARE AS FOLLOWS: a. FLD projects five acres and less. Functional open space amenities should be configured as contiguous areas but may also be incorporated into the design of other elements on the site, such as detention/retention basins and buffers, to make those areas functional. b. FLD projects more than five acres. Functional open space may be divided into smaller areas if they are distributed throughout the project site and conveniently located for residents of the FLD project. c. Functional open space shall be conveniently located to and usable by the maximum number of residential units on the site. d. To the greatest extent possible, functional open space should not be comprised of remnant areas that are not usable by residents of the FLD project. e. Where the project is located near a public preserve, or can provide connections to open space areas or areas of environmentally or culturally significant features, the open space shall be configured in a manner to preserve this connectivity. ADDITIONAL SITE LANDSCAPE/NPPO COMMENTS: 4. A NPPO OR A NPPO WAIVER IS REQUIRED PER UDC 7.7. SEE UDC 7.7.3. APPLICABILITY; UDC 7.7.4 NPPO GENERAL PROVISIONS AND STANDARDS; UDC 7.7.4.C. PLAN APPROVAL PRIOR TO PERMITTING; UDC 7.7.4.D. PROFESSIONAL EXPERTISE 7.7.5.C.5; ALSO SEE AM 2-11.3.0 PERMITTED EXCEPTIONS. PDSD will provide the applicant with the NPPO Waiver form upon request. 5. UDC 7.6.2. APPLICABILITY: The provisions of this section apply to the following: All new development requires the preparation of landscape plans that adhere to UDC 7.6.4 and Administrative Manual 2-10. 6. A 10-foot interior landscape border is required along the north property line per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. 7. A 10-foot street landscape border is required along E. Stella Rd and along S Pantano Rd per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. 8. A drip irrigation plan and details are required for all proposed landscape planting areas. 9. Depress Functional Open Space landscape planting areas 6 inches to maximize rainwater harvesting on site. 10. DTM review is required for all planting and irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) if necessary for this project. Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
|||
| Site Zoning * | REVIEW COMPLETED | CDRC TRANSMITTAL TO: Planning & Development Services Department FROM: Fernando L. García PDSD Zoning Review Section PROJECT: 7777 E Stella Rd, Tucson, AZ 85730 Parcel: 136210120 Zoning: R-1 Pre-Submittal Conference (1st Review) TP-PRE-0725-00136 TRANSMITTAL DATE: August 6, 2025 1. The proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package. Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency. 2. As this is an FLD project, a tentative plat and final subdivision plat will be required. 3. The project proposes to utilize the Flexible Lot Development standards as articulated in UDC 8.7.3 under the “Maximum FLD” option indicated in 8.7.3.D. Single-family attached or detached, and multifamily residential development in the R-2, R-3, O-1, O-2, O-3, C-1, C-2, and C-3 zones. 4. Maximum Density Option FLDs (Development Alternative B) permit site coverage of 70%, up to 6.25 dwelling units per acre, and a building height of 25’. Without a typical lot detail(s), anticipated site coverage cannot be determined. Provide typical lot detail(s) to facilitate a more complete review of the PDP. Without a “developable area” calculation per UDC 11.4.5, residential density cannot be confirmed. 5. Per UDC Table 8.7.3-2, 269 sf of functional open space (FOS) must be provided per unit. Given 98 proposed single-family units, a minimum of 26,362 sf of FOS is required. Given the Maximum Density Option FLD, the applicant is proposing to provide 20% more FOS than required, which would require 5,272 sf additional FOS. 6. Project site and interior lot line requirements are indicated in UDC 8.7.3.K and 8.7.3.L. 7. Building design and elevations must meet the design criteria indicated in UDC 8.7.3.M., including an architectural variation plan. 8. Privacy mitigation, as indicated in UDC 8.7.3.M.2.b through a Privacy Mitigation Plan, is required to the west and north where the project abuts existing single-family residential developments. 9. Ensure pedestrian circulation paths connect all areas of the development per UDC 8.7.3.J and TSM Article 7. None are demonstrated on the submitted plan. 10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package/Tentative Plat review process, the Site Zoning Review Section will conduct a full review to assure compliance with applicable UDC development criteria and technical standards. 11. If you have any questions, please contact me at fernando.garcia2@tucsonaz.gov. |
|||
| TW New Area Development * | REVIEW COMPLETED | TP-PRE-0725-00136 (7777 E STELLA RD TUCSON, AZ 85730) Proposed 98-lot Flexible Lot Development residential subdivision: Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development. 1. The owner/developer will need to construct all on-site and off-site public water mains necessary to serve this development at his or her own expense, and the following requirements will apply: a. The owner/developer will first need to obtain a Water Availability Letter from Tucson Water verifying this project is within Tucson Water’s service area. Note: This document is required for all projects, even though it may be obvious that the project is within Tucson Water’s service area. It is used in some other development processes, most notably the City Council’s final plat approval process. b. An overall water master plan will need to be prepared for this project and submitted to the local Fire Department and Tucson Water for review and approval. c. The overall master plan must show the proposed construction phasing for the new water mains, and the water main layout. During the water master planning of this project, please plan on looping the new on-site water mains to at least two different points in Tucson Water’s existing water distribution system as required by Section 8-06.4.2.A of Tucson Water’s Design Manual to meet water quality and fire flow requirements or explaining what legal and/or technical reasons prevent such looping. d. The new public water mains will also need to be located within public or private streets to the maximum extent practicable. Where this is not practicable, the new water mains will need to be centered within public water line easements that are a minimum of 15’ wide and lie on smallest number of private parcels possible. e. The local fire department’s fire flow requirement for the building size and construction type, the fire hydrants and the fire department’s vehicular access also need to be shown on the water master plan. f. The water master plan must first be submitted to the local Fire Department for review. Upon the local fire department’s acceptance of the water master plan, it may be submitted to Tucson Water’s New Development section for review. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Abdullah Salman | Project Manager Tucson Water - New Area Development C: 520-307-6189 | Abdullah.Salman@tucsonaz.gov |