Plan Number: TP-PRE-0725-00132
Parcel: 11918087A

Address: Unknown

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0725-00132
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Traffic Engineering Review * APPROVED
Fire New Construction REVIEW COMPLETED TP-PRE-0725-00132 • Fire New Construction • Pre-Application Conference Review v1 • NEC of Interstate 19 & West Ajo Way:
Please note:
1. Separate fire construction permit required for flammable and combustible liquids
2. Separate fire operational permit required for flammable and combustible liquids
Questions regarding those requirements – Contact inspector Jesus Silva 520.837.7094
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review REVIEW COMPLETED DTM ROW Engineering has no comments at this time.
Site Engineering REVIEW COMPLETED TP-PRE-0725-00132
850 W AJO WY

Site engineering comments are as follows:

1. Please include the area of disturbance as well as cut/fill quantities on the plan set for the formal submittal.
2. Provide waste stream calculations compliant with Technical Standards Manual Section 8.
3. The valley gutter which channels the water to the basin at the northwest of the parcel runs through the northern area of the proposed fuel canopy site footprint. Please ensure that the drainage for the site be maintained.
4. Pedestrian circulation is required to connect all buildings, any dumpster areas, common use areas, and the sidewalk on the street frontage per TSM 7-01.4.

Ryan Insalaco – ryan.insalaco@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PROPOSED FRY'S FUEL CENTER WITH 3,956 SF CANOPY; APPROXIMATELY 0.66 ACRE COMMERCIAL SITE
ACTIVITY NO: TP-PRE-0725-00132
PARCEL: 11918087A
ZONING: C-2 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards.

SITE LANDSCAPE/NPPO COMMENTS:

1. A NPPO or a NPPO Waiver is required per UDC 7.7. SEE UDC 7.7.3. APPLICABILITY; UDC 7.7.4 NPPO GENERAL PROVISIONS AND STANDARDS; UDC 7.7.4.C. PLAN APPROVAL PRIOR TO PERMITTING; UDC 7.7.4.D. PROFESSIONAL EXPERTISE 7.7.5.C.5; ALSO SEE AM 2-11.3.0 PERMITTED EXCEPTIONS. PDSD will provide the applicant with the NPPO Waiver form upon request.

2. UDC 7.6.2. APPLICABILITY
The provisions of this section apply to the following:
A. All new development; and,
B. Expansion of existing development, as provided below:
1. Buildings Greater Than 10,000 Square Feet
On sites where the gross floor area of the existing building (s) is more than 10,000 square feet, expansion in square footage of land area, floor area, lot coverage, or vehicular use area as follows:
a. If the expansion is less than 25%, the standards of this section apply only to the proposed expansion. Existing development on the site is subject to the zoning standards in effect at the time the existing development received zoning approval.

3. A landscape plan is required. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.

4. Provide the required number of trees in all vehicular parking areas (1 tree to 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.. PROVIDE A CALCULATION FOR THE REQUIRED SHADE TREES DUE TO THE EXISTING ASPHALT REMOVAL AND LIMITS OF WORK.

5. A drip irrigation plan and details are required for all proposed landscape planting areas.

6. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.

7. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required.

8. Coordinate the Landscape Plan, Commercial Rainwater Harvesting Plan and the Civil Grading Plans to have identical basin size, grades, spot elevations and curb cut locations.

9. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area.

10. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal

PDSD Zoning Review

FROM: Krista Hansen, Lead Planner

PROJECT: Pre-submittal meeting: TP-PRE-0725-00132



Parcel: Portion of 119-18-087A

Address: 3660 S 16TH AV

Zoning: C-2

Existing Use: Retail Trade: Food & Beverage Sales

Proposed Use: Retail Trade: General Merchandise Sales (Fuel Station)



TRANSMITTAL DATE: July 24, 2025



COMMENTS:

Any proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package (DP). Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency.



This project, even if divided into its own parcel at a future point, is part of the Santa Cruz Shopping Center development. Cross-access agreements will be required with any adjacent parcels, as well as any parcels which provide access to the public right-of-way along both W Ajo Wy and S 16th Av. Provide a City of Tucson “Covenant Regarding Development and Use of Real Property” with the DP submittal. A copy of this covenant can be provided through the email contact below.



If the intent is to sub-divide the lot, this will require a separate permit.



The site is zoned C-2. The proposed use is “Retail Trade: General Merchandise Sales (Fuel Station),” which is permitted, subject to use specific standards UDC 4.9.9.B.1.



Dimensional Standards per UDC Table 6.3-4.A:

Interior/front/rear lot line setbacks: 0 ft

maximum building height: 40 ft

maximum lot coverage: 70%



Motor vehicle parking requirements for “Gasoline Sales without Food and Beverage Sales” is 1 space per employee but not less than 2 spaces (UDC Table 7.4.4-1). See UDC 7.4.6 for design criteria. One (1) ADA van-accessible parking space is required. See IBC Chapter 11 Accessibility, Table 1106.1, 76-100 (www.ada.gov/topics/parking) for design criteria.



As this project proposes to eliminate existing motor vehicle parking on site, provide an updated motor vehicle parking calculation indicating the change in parking and that the site will maintain the required minimum amount of parking overall. Indicate uses of all buildings on site. This site may utilize the motor vehicle parking calculation for “Shopping Center” as indicated in Table 7.4.4-1 (1/300 sf), except that any Food Service (1/100 sf), Entertainment (1 space per 5 fixed seats or 1/50 sf), and Alcoholic Beverage Service (1/50 sf) uses must be parked separately at their specific calculations.



Bicycle parking ratios (UDC Table 7.4.8-1). See UDC 7.4.9 for design criteria.

Short-term: 1 space per 5,000 sq. ft. GFA. Minimum requirement is 2 spaces.

Long-term: 1 space per 12,000 sq. ft. GFA. Minimum requirement is 2 spaces.



Per Technical Standards Manual (TSM) section 7-01.3.0., provide a pedestrian circulation path that connects to all areas of development on-site and to any adjacent street frontage. The path must be ADA accessible and a minimum of 4’ wide (TSM 7-01).

Per TSM 1-01.60, a Technical Standards Modification Request (TSMR) may be utilized to request relief from this requirement. Request a TSMR application from nicholas.ross@tucsonaz.gov.



Access Lane / Parking Area Access Lane (PAAL):

Ensure setbacks from access lanes/PAAL meets the requirements of UDC 7.4.6.F.2.a., requiring a one-foot setback from open structures (like a canopy) and from the building and two feet from any obstruction over 6 inches in height

Per UDC Table 7.4.6-2, the minimum width for two-way access lane or PAAL is 24’. Measurement of all PAAL widths shall not include the pedestrian circulation path (measurement starts from the outside edge of the sidewalk).



Show trash collection area on site plan. If dumpster service is not proposed, indicate type of service.



The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.



If you have any questions, please contact me at krista.hansen@tucsonaz.gov.
TW New Area Development REVIEW COMPLETED TP-PRE-0725-00132 Proposed Fry's fuel center with 3,956 sf canopy, 174 sf walk up kiosk, 5 pump stations with 10 fuel pumps on approximately .66 acre commercial site.

Based on the information provided, Tucson Water has no objections to, or comments on, the proposed development.

If any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.

The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Abdullah Salman | Project Manager
Tucson Water - New Area Development