Plan Number: TP-PRE-0724-00178
Parcel: 11918023B

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0724-00178
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0724-00178 • Pre-Application Conference Review v1 • 3001 S COTTONWOOD LN TUCSON, AZ 85713:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review REVIEW COMPLETED DUE: 29AUG24
SUBJECT: Proposed Old Pueblo BESS – Drainage Review
LOCATION: Ward 1
FROM: Elizabeth Leibold P.E., CPM, CFM

SUMMARY: The proposed plan for Old Pueblo BESS, was reviewed for compliance with City of Tucson regulations including Tucson Code Chapters 26, Plan Tucson, Technical Manual Section 4-04, and other Tucson regulations. No drainage report was submitted and is required. The following comments for the report are provided:
1) Tucson Code Sec.26 Article 1 and Technical Stnd Sec. 4-04.1.2.1: Drainage report is required for proposed projects within Erosion Hazard Setback (EHS) areas.
2) Tucson Code Sec.26-2: Please provide discussion as well as clarifications of delineations on planviews that depict EHS according to the following comments:
a) Setback for Santa Cruz River regional watercourse is measured from the top edge of the highest channel bank or edge of the base flood water surface elevation, whichever is closer to the channel center line.
b) Provide discussion in a drainage report regarding compliance with this section of the code including computation of the rc / Tw ratio to explain compliance to the criteria for use of the straight section setback; EHS for curve section per code would be 1,230 feet and straight section is 490- feet.
c) Please be aware, the labeled 230-foot proposed erosion hazard setback only applies to a different parcel under a special variance. Proposed labeled substation also must meet EHS requirements.
3) Tucson Code Sec. 26-11.2(f): Address the following other comments for the plan:
a) Show proposed grading for the site including minimum 2-feet offset at property boundaries for cut or fill slopes shall be included in the planview.
b) Layout appears to need to minimize footprint area of proposed infrastructure and any future substation to meet City erosion hazard setback safety requirements. Show interceptor swales and proposed fill pads for all proposed infrastructure located out of / west of the regulatory 490 feet EHS.
c) Clearly show access road and label access from public right-of-way or legal access easement to parcel on planview, including any paved 20-ft wide paved emergency access road to the parcel.
d) Detention / Retention waiver request (Criterion 1) can be included in Development Package submittal, with provision for first flush. Typically, the request for waiver, or the request and documentation with response from PDSD Engineering or Floodplain Administration, is placed within the drainage report for the first submittal. Keep in mind that first flush requirement may still be required by PDSD Engineering.
e) Explain and delineate where regulatory 500-year floodplain exists on parcel and how proposed Critical Facility meets requirements for utility features such as batteries storage, other machinery or buildings that will need to be elevated above 500-year floodplain per Tucson Flood Ordinance freeboard requirements. Critical Facility requirements for utility features will need elevation above the 500-year floodplain.
4) Tucson Code Sec. 26-11.2(f): Engineering and safety concerns include:
a) Future meandering is unknown. Although the location of the end of the west bank soil cement has a curve in the alignment that can lessen flow velocities if the east bank does not change alignment, at the same time, the soil cement alignment also directs floodwaters toward the subject parcel.
b) The potential danger exists if the parcel erodes during a storm event and onsite battery or other materials are swept onto other lands or downstream or to create localized scour hazards which may increase potential to cause injury to others, and blockages, diversion, or contamination of floodwaters within the regional watercourse. Design must reflect consideration of these hazards.
c) Discuss stormwater quality considerations for this project and how any batteries will be placed in secondary containment to protect against fire potential and from contaminating regional watercourse area where infiltration to groundwater potential is high.
d) Consideration of project’s impact to the existing closed City of Tucson Ryland Landfill located on opposite side of bank of the Santa Cruz River. If sufficient EHS is not provided there is a potential to create a danger or hazard to life or property in the area, or result in increased flood hazards or additional threats to public safety if the design for this project fails to function from the impact of an erosion hazard.
e) Technical Stnd Sec.4-04.7.5: Provide soil engineering data and analysis of existing bank soil conditions for computing Allowable Velocity to determine if Santa Cruz River west bank is vulnerable to erosion.
f) Historical information indicates this section of the regional watercourse has meandered back and forth across this property over 400-feet. Potential to erode is consistent with the City of Tucson’s current 490-feet setback requirement. Proposed setback of 230-feet is less conservative and puts infrastructure at risk during regulatory storm events. Revised design is required.
g) Unknown fill material near or on the subject property may or may not increase future erosion potential. Previous uses of the site for sand and gravel pit activities may have changed consistency of soil compaction and may increase potential for erosion risk. Provide engineering justification of project with supporting geotechnical engineering report.
h) During the 1983 flood event, higher velocities were seen west of the existing eastern thalweg, which indicates some proclivity to meander back toward the west bank and this property. Provide engineering justification for lesser EHS.
5) Tucson Code Sec.26-2: If a variance is to be proposed, keep in mind that the City of Tucson Mayor and Council requires that the any proposal for a variance be exceptional, unusual, and peculiar to the property involved. Mere economic or financial hardship alone is not exceptional. Inconvenience or physical constraints, cannot, as a rule, qualify as an exceptional hardship. All of these problems can be resolved through other means without granting a variance, even if the alternative is more expensive, or requires the property owner to build elsewhere or put the parcel to a different use than originally intended.
6) Tucson Code Sec.26-12(c)(1)a: Applicant may submit a request for a variance however the submittal shall include a concise explanation of all matters in dispute and any pertinent maps, drawings, data or other information in support of the appeal.
7) Tucson Code Sec.26-7.1: In 2020, the City of Tucson adopted more restrictive erosion hazard setback requirements for the regional watercourse since the chances for flood and erosion disaster would more likely occur along the regional watercourses. City of Tucson Floodplain Administration carefully reviews any proposed projects adjacent to the regional watercourses to avoid future loss of life and property and requires compliance to the erosion hazard setbacks as provided in the Flood and Erosion Hazard Management Code. An acceptable protection improvement for this proposed critical facility would provide 100-year protection that extends from existing soil cement located upstream, south of subject parcel, and extend beyond downstream side of parcel with a key-in at a distance from top of bank at floodway that would equate to the 100-year EHS and would include appropriate toedown to scour depth. Otherwise, all proposed improvements should be placed west of the 490 feet EHS (unless curved section criteria applies).

Elizabeth Leibold P.E., CPM, CFM
Engineering Division
Department of Transportation & Mobility
City of Tucson
(520) 429-4905
Site Engineering REVIEW COMPLETED Tucson codes and ordinances can be found online at: https://codelibrary.amlegal.com/codes/tucson/latest/overview
The Design Standards for Stormwater Detention and Retention (DSSDR) manual can be found online at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf
1. A Stormwater Pollution Prevention Plan is required for the site. See https://azdeq.gov/what-swppp for more information.
2. First flush retention and balanced basin detention compliant with sections 2 and 3 of the DSSDR will be required. A drainage report will be required to establish that these requirements are being met.
3. Due to proximity to The Loop, please reach out to Pima County Regional Flood Control District.

Mike Ortiz
michael.ortiz@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: PROPOSED OLD PUEBLO BESS FACILITY
ACTIVITY NO: TP-PRE-0724-00178
ADDRESS/PARCEL: 3001 S COTTONWOOD LN/11918023B
ZONING: R-1 RESIDENCE ZONE
LAND USE: UTILITY SERVICES

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to ensure compliance with the applicable UDC development criteria and Technical Standards.

SITE LANDSCAPE/NPPO COMMENTS:

1. A NPPO or a NPPO Waiver is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, must be submitted and approved or a request for an exception from the Native Plant Preservation requirements shall be approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Administrative Manual Section 2-11.0.0 prior to Grading Plan approval. PDSD will provide the applicant with the NPPO Waiver form upon request.

2. A landscape plan is required per UDC 7.6.2.B.1-b. The Unified Development Code requires all new development, or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.

3. Interior landscape borders are required on all four property boundaries as this is a Utility Services land use adjacent to a Residence Zoned parcels per UDC 7.6.4.C-2 and Table 7.6.4-1. Utility Services adjacent to Residence Zones requires a 6-foot wall. See UDC 7.6.4.C for landscape border requirements.

If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
FROM: Nicholas Martell, Principal Planner
PDSD Zoning Review
PROJECT: Pre-submittal meeting TP-PRE-0724-00178
Address: 3001 S COTTONWOOD LN
Zoning: R-1
Existing Use: Vacant
Proposed Use: Distribution System or Hazardous Materials Storage

TRANSMITTAL DATE: August 28, 2024

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06, Development Package
2. Based on Preliminary Discussions with the Zoning Examiner, this use will either be classified as a Utilities-Distribution System or a Hazardous Materials Storage.
a. Utilities-Distribution System is allowed in the R-1 via a Zoning Examiner Special Exception Procedure per UDC 3.4.3, and adherence to use-specific standards 4.9.11.A.1, .2, .5, .8, .9, .11, .12
b. Hazardous Material Storage is not allowed in the zone. A re-zoning would have to occur to enable the use to operate at this site.
3. Per UDC Table 6.3-2.A, the following Dimensional Standards apply:
a. Lot Coverage is limited to 70%
b. The height maximum is 25’ from Design Grade.
c. Perimeter yard setbacks to interior property lines are 10’ or ¾ the Height of the Building, whichever is greater.
4. Ensure compliance with Table 7.4.4-1: Minimum Number of Motor Vehicle Spaces Required:
1 space per 500 sq. ft. GFA, with a minimum of 2 spaces per facility
5. Per UDC 6.4.5.C, For nonresidential and multifamily development abutting an Arterial or Collector Street the minimum required street perimeter yard is ten feet, as measured from the existing or future property line as determined by the adopted Major Streets and Routes Plan, whichever is greater.
6. Ensure access for the proposed southern parcel complies with section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual.
a. The pedestrian circulation paths must comply with 7-01.3: Within all development, a continuous pedestrian circulation path is required as follows:
A. This path must connect all public access areas of the development and the pedestrian circulation path located in any adjacent streets.
B. The areas within the development which must be connected include, but are not limited to, all buildings, all bicycle and vehicle parking areas, all recreation areas, all dumpster areas, and all other common use areas.


7. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Nicholas.Martell@tucsonaz.gov.
TW New Area Development REVIEW COMPLETED TP-PRE-0724-00178 - Pre-Application Conference Review v1 - 3001 S COTTONWOOD LN

Tucson Water has no objections to the proposed development and offers the following comments for your convenience:

1. Will this project include parcel 119180210? If so, do you intend to use the well (ADWR Reg. No. 55-639596) on the property?
2. If you do not intend to use this well it must be properly abandoned in accordance with provisions of Arizona Department of Water Resources (ADWR) Regulation R-12-15-816. Documentation of well abandonment must be submitted to Tucson Water Hydrology Division, Attn: Charles Faas (chuck.faas@tucsonaz.gov (520) 349-3356), before project finalization.
3. Please contact Tucson Water’s New Services Section with any questions you may have about new domestic water, irrigation water, or fire water services needed to serve this proposed development. Tucson Water’s New Services Section can be reached by calling 520-791-5164 or by sending an e-mail to TW_Common@tucsonaz.gov.


The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Michael Asbury, Engineering Associate
Tucson Water, New Development Section
201 N. Stone Avenue, #2 Flr.
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2202