Plan Number: TP-PRE-0625-00116
Parcel: 12212048B

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0625-00116
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0625-00116 • Pre-Application Conference Review v1 • 4333 E SPEEDWAY BL TUCSON, AZ 85712:
Based on the information provided TFD has the following comments:
1. Verify hydrant coverage. IFC 24, 507.5.1.1 & Appendix C
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
ROW Engineering Review REVIEW COMPLETED DTM ROW Engineering has no comments.

If you have any questions, please contact Richard Leigh at 520-403-0970 or email richard.leigh@tucsonaz.gov.
Site Engineering REVIEW COMPLETED TP-PRE-0625-00116
4333 E SPEEDWAY BL

Site engineering comments are as follows:
1. Pedestrian circulation is required to connect all buildings, any dumpster areas, common use areas, and the sidewalk on the street frontage per TSM 7-01.4.
2. The shop is required to have pedestrian circulation surrounding it between the Parking Area Access Lanes (PAAL’s) and the building. Per TSM Sec. 7-01.4.1.B
3. Clearly show downspouts on buildings to ensure that stormwater from roof drains, up to and including waters from the ten-year storm event, does not pass over sidewalks per Technical Standards Manual 7-01.4.3E. Downspouts shall be scuppered under the walkway.
These comments are preliminary. Further comments may be forthcoming upon review of the formal submittal.

Ryan Insalaco – ryan.insalaco@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, RLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: NEW REPAIR SHOP PROPOSED TO BE BUILT ON THE NORTHEAST CORNER OF THE PARCEL TO REPLACE EXISTING PARKING SPACES
ACTIVITY NO: TP-PRE-0625-00116
ADDRESS: 4333 E SPEEDWAY BL
ZONING: C-2 COMMERCIAL ZONE

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards.

SITE LANDSCAPE/NPPO COMMENTS:

1. No comments or concerns with this building addition.

Thank you.
Chad Keller, RLA
Landscape Architect
chad.keller@tucsonaz.gov
520.837.4923
Site Zoning REVIEW COMPLETED PDSD TRANSMITTAL

TO:
Planning & Development Services Department

FROM: Jeffrey W Cassidy
PDSD Zoning Review Section

PROJECT: 4333 and 4373 E SPEEDWAY BL TUCSON, AZ 85712
Parcel(s): 122-12-048B, 122-12-048A
Zoning: C-2 Commercial Land Use Group / Automotive - Service and Repair / Automotive - Major Service and Repair
Pre-Submittal Conference (1st Review)
TP-PRE-0625-00116
Application Narrative: New repair shop proposed to be built on the northeast corner of the parcel to replace existing parking spaces. New building will include an oil/sand interceptor, and oil tanks on the south side of the building, adjacent to the existing Lexus building. Grade changes will be provided to maintain existing slope.

TRANSMITTAL DATE: July 10, 2024

1. The proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package. Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency.

2. The proposed project meets the zoning group use in C-2 (Commercial Land Use Group), Class: Automotive - Service and Repair and Type: Automotive - Major Service and Repair per 11.3.4.E.2. (Definitions) and Table 4.8-4 (Permitted Uses) subject to use specific standards 4.9.13.E.

3. The proposed project appears to consider two lots 122-12-048B and 122-12-048A as a single site, under single ownership, and as part of a unified development. As such, a lot-combination processed through Pima Count could be required prior to final approval of this project.

4. The following dimensional standards apply to the C-2 per UDC Table 6.3-4, unless otherwise noted:

Per 6.4.5.2.b., Setbacks to E Bellevue St (north), are 20’-0”.

Per 6.4.5.2.a., Setbacks to N Columbus Bl (west), are 10’-0”. Columbus is Major Streets & Routes (MS & R.

Per 6.4.5.2.a., Setbacks to E Speedway Bl (south), are 10’-0”, measured from the existing and/or future property line (see comment 5 below). E Speedway Bl is Major Streets & Routes (MS & R).

Setbacks for nonresidential use adjacent to a residential zone (east), are 36’-0” (1.5)(H) or (1.5)(24’-0”).

Height is limited to 40’-0”.

5. E Speedway Bl (MS&R) is set to expand to a 120’ right of way from the current 95’, requiring further discussion with Department of Transportation and Mobility which may affect future development plans outside of this submittal you may have. DTM can be reached at (520) 791-3154.

6. Per 7.4.3.E., Demonstrate gross floor area expansion percentage.

7. Per UDC Table 7.4.4-1, Auto service and repair uses require 1 motor vehicle parking space per 300 sq ft. based upon square footage of 6,700, 23 parking spaces are required, of which one must be van accessible. Demonstrate that the site provides sufficient parking for the expansion and all existing uses. Refer to 7.4.6. for Motor Vehicle Use Area Design Criteria.

8. Per UDC Table 7.4.8-1, the minimum required number of short-term bicycle parking spaces is 2. The minimum required number of long-term bicycle parking spaces is 2. Refer to 7.4.9. for Bicycle Parking Design Criteria.

9. Per Section 7-01.0.0 of the UDC Technical Standards Manual, an ADA accessible circulation path that is a minimum of 4’-0” wide is required to connect all areas of development within the site and to any adjacent street frontage. Pedestrian connectivity to Bellevue and the existing trash enclosure is required. Refer to 7-01.4.0. for Location.

10. Per DP17-0285 and the rezoning conditions, case number C9-82-47, ordinance 5751, demonstrate compliance with conditions.

11. Upon submitting a future Development Package, be sure to include the previous history of rezoning C9-82-47, DP17-0285, T16CM09071, T99CM02007 and Board of Adjustment Variance C10-18-04 case and package numbers in the title block.

12. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, the Zoning Review Section will conduct a full review to assure compliance with applicable UDC development criteria and technical standards. If you have any questions, please contact me at jeffrey.cassidy@tucsonaz.gov or 520-837-4916.
TW New Area Development REVIEW COMPLETED TP-PRE-0625-00116 - Pre-Application Conference Review v1 - 4333 E SPEEDWAY BL TUCSON

Tucson Water has no objections to the proposed development and offers the following comments for your convenience:

1. Serving this property is an existing 6in CA (Cement Asbestos) potable water main followed be an existing 6in fire service and existing 1.5in potable water meter.
2. If your intent is to use a 2in water service line, you must upsize to a 2in potable water meter. Please contact New Services at 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.


The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Michael Asbury, Senior Engineering Associate
Tucson Water, Planning and Engineering
310 W Alameda St
Tucson, AZ 85701
(520) 837-2202