Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0623-00245
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Fire New Construction | REVIEW COMPLETED | TP-PRE-0623-00245 • Pre-Application Conference Review v1 • 314 E BENSON HY TUCSON, AZ 85713: Based on the information provided, TFD has the following comments: 1. Knox box(es) in accordance with 2018 IFC, 506. 2. Provide fire sprinkler systems in accordance with 2018 IFC, 903.3. 3. Provide fire alarm systems in accordance with 2018 IFC, 907. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| Signs | REVIEW COMPLETED | RE: sign review For: 314 E Benson Hwy Partial change of use from hotel to part apartments and hotel Case: TP-PRE-0623-00245 Date: 07/05/23 Reviewer: H. Thrall (Heather.Thrall@tucsonaz.gov) Unified Development Code (7A, Sign Standards) 1 The hotel is still present and active, with the proposal to turn a few of the rooms into multi-family use. . A freeway sign is not permitted for apartment use / display, per 7A.10.2.B chart note 4, and descriptions for freeway sign allowances. Remove the apartments advertising from the freeway sign. 2. Should the use change in part of the building be approved, please obtain a change copy permit for the freeway sign cabinet through a licensed sign contractor to have the change from Lazy 8 Motel. Omit the apartment advertisement from that sign. 3. Apartment use area may have up to 50 square feet of sign area. Contact me by email with questions / discussion desired. |
|||
| Site Engineering | REVIEW COMPLETED | 1. Maximize water harvesting to any required landscaping through use of curb cuts and cut curbs. 2. Ensure waste design and maneuverability per TSM 8-01 (active requirement) and TC 15-10.1.E (passive requirement for multifamily) 3. Retention/detention will be waived due to change of use with no change in site permeability 4. Ensure a 4 ft pedestrian circulation path with a 2.5 ft overhang from edge of curb or wheel stop in sidewalks adjacent to parking spots 5. Ensure a pedestrian circulation path from each building to any waste enclosures and out to Benson Hwy. See traffic comments regarding any new sidewalk along Benson Hwy 6. Ensure roof drainage up to the 10-yr storm is direct away from/under adjacent sidewalks through the use of gutters/scuppers Scott Haseman scott.haseman@tucsonaz.gov |
|||
| Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PROJECT: OCOTILLO APARTMENTS ACTIVITY NO. TP-PRE-0623-00245 ADDRESS/PARCEL: 314 E BENSON HY /119-01-046C ZONING: C-2, R-2 This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards. COMMENTS: 1. There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval. 2. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10. 3. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a. 4. Bring the street landscape border on Benson HWY up to code per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. 5. See Engineering notes for Retention/Detention. 6. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 7. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. Landscape plan should have spot elevations in the detention/retention areas as well as in all water harvesting areas in the Landscape Plan. 8. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot. 9. As the site is not being repaved, PDSD cannot ask for a commercial rainwater harvesting plan, but it would behoove the applicant to ensure that the required landscaping is getting a large percentage of the necessary water from rainwater harvesting. If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988 |
|||
| Site Zoning | REVIEW COMPLETED | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Georgia Pennington, Planner PROJECT: TP-PRE-0623-00245 Parcel(s): 119-01-046C Current Zoning: C-2/R-2 Existing Use: Motel Proposed Use: Multifamily Development (150 units) COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 – Development Package. The Development Package is a separate submittal from the building permits, and the building permits cannot be approved until the Development Package is approved. 2. The existing zone is C-2 and R-2. Multifamily Development is a permitted use in the C-2 zone. 3. Show entire site on site plan, including 119-01-074A. 4. A lot combination (Parcel 119-01-074A and 119-01-046C) is required. This can be done through Pima County Assessor’s office. 5. Maximum Density: a. 44 Dwelling Units/Acre 6. Motor Vehicle Space requirements: a. Studio, less than 400 SF GFA, 1.00 space/Dwelling Unit b. 1 bedroom, 1.5 space/Dwelling Unit Refer to Table 7.4.4-1 for requirements. If required parking exceeds what is provided, standards in 7.4 are applicable. Demonstrate parking requirements are met for both uses. 7. Bicycle Parking Requirements: a. Short term: 0.10 spaces per bedroom (min 2) b. Long term: .5 spaces per bedroom (min 2) 8. Electric Vehicle Charging Requirements: a. EV Ready- 10% required; EV Capable- 20%, 9. Parking Area Access Lanes (PAAL) shall be 24 feet wide for 2-way traffic and fire access. 10. Comply with Section 7-01 Pedestrian Access in the Technical Standards Manual. 11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Georgia.Pennington@tucsonaz.gov. |
|||
| Traffic Engineering Review | REVIEW COMPLETED | No Comments David Stiffey David.Stiffey@tucsonaz.gov |
|||
| TW New Area Development | REVIEW COMPLETED | TP-PRE-0623-00245 - Pre-Application Conference Review v1 – 314 E BENSON HY 1. Based on the information provided, Tucson Water has no objections to, or comments on, the proposed conversion of an existing motel into multi-family apartments. 2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |