Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TP-PRE-0623-00244
Parcel: 132130490

Address:
1025 E BENSON HY

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0623-00244
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0623-00244 • Pre-Application Conference Review v1 •1025 E BENSON HY TUCSON, AZ 85713:
Based on the information provided, TFD has the following comments:
1. Knox key switch/box(es) in accordance with 2018 IFC, 506.
2. Provide hydrants to meet the requirements of 2018 IFC, 505.7.1.
3. Provide fire sprinkler systems in accordance with 2018 IFC, 903.3.
4. Provide fire alarm systems in accordance with 2018 IFC, 907.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
Signs REVIEW COMPLETED RE: sign review
For: change of use from hotel to apartments
AT: 1025 E Benson Hwy
Presubmittal: TP-PRE-0623-00244
Date: 07/06/23
Reviewer: H. Thrall (Heather.Thrall@tucsonaz.gov

Codes: Unified Development Code (7A) Sign Standards

1. UDC:
This is a change of use from a hotel to multi-family apartments. Per UDC 7A.10.2.B. Table 2. Commercial Zones - section .4:-
“Property where an approved site plan, development plan or plat provides for a multi-family dwelling as the principal use, shall follow the standards of the multi-family zone category.” Freeway signs and pole signs are not permitted within the multi-family zone category. The site presently has a freeway sign that would require removal, and a pole sign that would require modification, given the preliminary information provided in this presubmittal review. Please note, maximum sign area allowed for multi-family residential is 50 square feet. Please reach out to me for further discussion.
2. Please clarify your parking for the restaurant with bar use. The restaurant use, if open to the public, may have a sign area ratio of 3 square feet per linear foot of building frontage along Benson Hwy, not to exceed 30% of sign area on elevations where signage is displayed.
3. Please consult the Arizona Department of Liquor Licenses and Control for requirements for liquor licensing, as this location was likely licensed as a hotel for consumption.

Depending on revisions resubmitted, further review comments may be forthcoming.
I may be reached at Heather.Thrall@tucsonaz.gov if you have any questions.
Site Engineering REVIEW COMPLETED 1. Maximize water harvesting to any required landscaping through use of curb cuts and cut curbs.
2. Ensure waste design and maneuverability per TSM 8-01 (active requirement) and TC 15-10.1.E (passive requirement for multifamily)
3. Retention/detention will be waived due to change of use with no change in site permeability
4. Ensure a 4 ft pedestrian circulation path with a 2.5 ft overhang from edge of curb or wheel stop in sidewalks adjacent to parking spots
5. Ensure a pedestrian circulation path from each building to any waste enclosures and out to Benson Hwy. See traffic comments regarding any new sidewalk
6. Ensure roof drainage up to the 10-yr storm is direct away from/under adjacent sidewalks through the use of gutters/scuppers

Scott Haseman
scott.haseman@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PROJECT: OCOTILLO APARTMENTS
ACTIVITY NO. TP-PRE-0623-00244
ADDRESS/PARCEL: 1025 E BENSON HY /132-13-0490
ZONING: C-2, I-1

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
1. There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.
2. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.
3. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.
4. Bring the street landscape border on Benson HWY up to code per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements.
5. Bring the interior landscape border on the east & west sides of the site up to code per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements.
6. See Engineering notes for Retention/Detention.
7. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.
8. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. Landscape plan should have spot elevations in the detention/retention areas as well as in all water harvesting areas in the Landscape Plan.
9. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot.
10. As the site is not being repaved, PDSD cannot ask for a commercial rainwater harvesting plan, but it would behoove the applicant to ensure that the required landscaping is getting a large percentage of the necessary water from rainwater harvesting.


If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Georgia Pennington, Planner

PROJECT: TP-PRE-0623-00244
Parcel(s): 132-13-0490
Current Zoning: C-2/I-1
Existing Use: Motel
Proposed Use: Multifamily Development

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 – Development Package. The Development Package is a separate submittal from the building permits, and the building permits cannot be approved until the Development Package is approved.

2. The existing zone is C-2/I-1. Multifamily Development is a permitted use in the C-2 portion of the property. Multifamily is not permitted in the I-1 portion of the property. Demonstrate compliance with Section 1.4.2.E in order to have multifamily permitted for the north building.

3. Maximum Density:
a. C-2: 44 Dwelling Units/Acre (223 units are permitted)

4. Motor Vehicle Space requirements:
a. Studio, less than 400 SF GFA, 1.00 space/Dwelling Unit
b. 1 bedroom, 1.5 space/Dwelling Unit

Refer to Table 7.4.4-1 for requirements. The submitted site plan with parking calculations appears to be incorrect. If required parking exceeds what is provided, standards in 7.4 are applicable.

5. Bicycle Parking Requirements:
a. Short term: 0.10 spaces per bedroom (min 2)
b. Long term: .5 spaces per bedroom (min 2)

6. Electric Vehicle Charging Requirements:
a. EV Ready- 10% required; EV Capable- 20%,

7. Parking Area Access Lanes (PAAL) shall be 24 feet wide for 2-way traffic and fire access.

8. Comply with Section 7-01 Pedestrian Access in the Technical Standards Manual.

9. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Georgia.Pennington@tucsonaz.gov.
Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
TW New Area Development REVIEW COMPLETED TP-PRE-0623-00244 - Pre-Application Conference Review v1 – 1025 E BENSON HY

1. Based on the information provided, Tucson Water has no objections to, or comments on, the proposed conversion of an existing motel into multi-family apartments.

2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov