Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0525-00087
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Fire New Construction | REVIEW COMPLETED | TP-PRE-0525-00087 • Pre-Application Conference Review v1 • 3901 S KOLB RD TUCSON, AZ 85730: Based on the information provided TFD has the following comments: 1. Units classified as R-2 per IFC 2024, will require fire sprinklers in accordance with 903.3. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review | REVIEW COMPLETED | TP-PRE-0525-00087 • 3901 S KOLB RD 1. In accordance with Sec 10-01.3.3 of the UDC Technical Standards (UDC TSM) Manual, a continuous unobstructed pedestrian circulation path along projects property street frontage must be provided. Any existing pedestrian facilities along the property frontage shall be brought into compliance with Sec. 10-01.4.0. of the UDC TSM. This includes providing driveway aprons Per PAAG standard Detail 206 and replacing any sidewalk panels that are lifted, broken or where the cross slope exceeds 2%. If you have any questions, please contact Richard Leigh at richard.leigh@tucsonaz.gov. |
|||
| Site Engineering | REVIEW COMPLETED | TP-PRE-0525-00087 3901 S KOLB RD Site engineering comments are as follows: 1. A block plat may be submitted to combine the lots previously recorded by the “Kolb Commercial Subdivision Lots 1 thru 4.” A drainage report is required to support the abandonment of the northern drainage easement. The abandonment of the blanket utility easement described on Docket 2412 p’s 94-97, however, requires the permission of Southwest Gas and Tucson Electric Power and must be granted by separate instrument. 2. Show all remaining easements on the formal development submittal. 3. A Stormwater Pollution Prevention Plan is required for the site. See https://azdeq.gov/what-swppp for more information. 4. First flush retention and balanced basin detention compliant with sections 2 and 3 of the Design Standards for Stormwater Detention and Retention (DSSDR) manual are required for the proposed project. Provide a drainage report which states how these requirements will be met. 5. Provide waste stream calculations and waste enclosure specifications compliant with TSM Section 8. Alley trash pickup and the use of APC’s will require special permission from Environmental Services. 6. Pedestrian circulation is required to connect all buildings, dumpster areas, common use areas, and the sidewalk on the street frontage per TSM 7-01.3.3. Show a continuous pedestrian path that maintains a 4-ft unobstructed width 7. Clearly show the locations of roof downspouts. Stormwater from roof drains, up to and including waters from the ten-year storm event, may not pass over sidewalks per Technical Standards Manual 7-01.4.3E. Tucson codes and ordinances can be found online at: https://codelibrary.amlegal.com/codes/tucson/latest/overview The Design Standards for Stormwater Detention and Retention (DSSDR) manual can be found online at: https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf Ryan Insalaco - Engineering Associate Email: ryan.insalaco@tucsonaz.gov Phone: (520) 837-5351 |
|||
| Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: MULTIFAMILY DEVELOPMENT ACTIVITY NO: TP-PRE-0525-00087 ADDRESS: 3901 S KOLB RD ZONING: C-1 COMMERCIAL ZONE LAND USE: MULTIFAMILY This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by the Site Landscape and NPPO section to ensure compliance with the applicable UDC development criteria and Technical Standards. SITE LANDSCAPE/NPPO COMMENTS: 1. A NPPO or a NPPO Waiver is required per UDC 7.7. SEE UDC 7.7.3. APPLICABILITY; UDC 7.7.4 NPPO GENERAL PROVISIONS AND STANDARDS; UDC 7.7.4.C. PLAN APPROVAL PRIOR TO PERMITTING; UDC 7.7.4.D. PROFESSIONAL EXPERTISE 7.7.5.C.5; ALSO SEE AM 2-11.3.0 PERMITTED EXCEPTIONS. PDSD will provide the applicant with the NPPO Waiver form upon request. 2. UDC 7.6.2. APPLICABILITY The provisions of this section apply to the following: A. All new development must include landscape plans that adhere to UDC 7.6.4 and Administrative Manual 2-10. 3. Provide the required number of trees in all vehicular parking areas (1 tree to 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a. 4. An interior landscape borders is required on the north property boundary of the site per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. Multifamily adjacent to Residence zone requires a 10’ interior landscape border. 5. A street landscape border is required along S Kolb Rd per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements. Multifamily along MS&R and non-MS&R requires a 10’ street landscape border. 6. A drip irrigation plan and details are required for all proposed landscape planting areas. 7. DTM review is required for all planting and irrigation in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) if necessary for this project. 8. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11. 9. A Commercial Rainwater Harvesting plan is required: See Technical Standards Manual 4-01.3.0 RAINWATER HARVESTING PLAN. A Rainwater Harvesting Plan shall be submitted with all applications for commercial developments at which landscaping is required. The Rainwater Harvesting Plan shall consist of two elements: A Site Water Budget Calculation Spreadsheet and a Water Harvesting Implementation Plan. Preparation of the Rainwater Harvesting Plan elements require coordination between project managers, site engineers and landscape architects from the inception of the project. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. The two elements of the Rainwater Harvesting Plan shall illustrate how water harvesting will meet 50% of annual landscape water demand, as required by the ordinance. If a copy of the Site Water Budget Spreadsheet is needed, please reach out to the contact information at the bottom of these comments. 10. Coordinate the Landscape Plan, Commercial Rainwater Harvesting Plan and the Civil Grading Plans to have identical basin size, grades, spot elevations and curb cut locations. 11. Maximize rainwater harvesting across the site into all landscape areas, including the street landscape borders and planting islands for the required trees in the parking area. 12. A separate irrigation water meter is required. Please label irrigation meter as “irrigation only”. See TSM 4-01.6.0 Thank you. Chad Keller, RLA Landscape Architect chad.keller@tucsonaz.gov 520.837.4923 |
|||
| Site Zoning | REVIEW COMPLETED | CDRC TRANSMITTAL TO: Planning & Development Services Department FROM: Fernando L. García PDSD Zoning Review Section PROJECT: 3901 S Kolb Rd, Tucson, AZ 85730 Parcel(s): 136384180, 136384170, 136384160, 136384150 Current Zoning: C-1 TP-PRE-0525-00087 TRANSMITTAL DATE: May 14, 2025 1. Any proposed development must comply with the City of Tucson Unified Development Code (UDC) Administrative Manual Chapter 2-06 – Development Package (DP). Building permits can be submitted and reviewed concurrently with the development package but the building plans cannot be approved until the development package is approved and the building plans are reviewed for consistency. 2. Proof of lot combination of the four component parcels will be required before issuance of the development package (DP). 3. Per UDC Table 4.8-4, the proposed use is: Residential Land Use Group – Family Dwelling (Multifamily Development), which is a permitted use in the C-1 zone. 4. Per UDC Table 6.3-5.A, dimensional standards in the C-1 zone are listed below. For the purposes of determining dimensional standards, a multifamily development is considered “nonresidential”. a. Residential Density Permitted: 36 dwelling units per acre (one dwelling unit for every 1,210 sf) b. Maximum building height (nonresidential; as measured from design grade): 30’ c. Maximum lot coverage (nonresidential): N/A d. Perimeter Yard (as measured from property line): i. Per UDC 6.4.5.C.2, nonresidential development abutting a Major Street & Road (MS&R), S Kolb Rd in this location, requires a 10’ setback from the property line. ii. Interior setback to a residential zone (to any SR or R-2 zone within 20’ of the property line, including across an alley or street): 1.5 times the height of the adjacent wall. The setback to the east and north appear to be insufficient without an approved setback reduction. A setback reduction can be requested through a Design Development Option (DDO) application submitted after the first formal review. 5. The original plat for this subdivision (available at https://maps-and-records.tucsonaz.gov/subdivisions/search?book=28&pg=010) demonstrates a number of easements, including access, no-access, utility, and drainage, that conflict with the placement of buildings and driveways for this project. A block plat, to vacate these easements (and concurrently, combine the lots) will be necessary to submit and approve prior to final approval of the development package for this project. 6. Per UDC Table 7.4.4-1, for “multifamily dwellings – 0-70 units/acre”, the motor vehicle parking requirements is based on the number of bedrooms in each unit as follows: a. 1 bedroom - 1.50 spaces per dwelling unit Based upon 28 one-bedroom units, 42 parking spaces are required on site; of these 42, two must be accessible; of the two accessible spaces, one must be van accessible b. Parking calculations below are an estimate based upon information provided on the submitted plans and may be incomplete, or incorrect, based upon the veracity or clarity of the information provided in the plans. 7. Motor vehicle use areas must be designed in accordance with UDC 7.4.6, to include required parking area access lane (PAAL) widths for one and/or two-way lanes. 8. Per UDC Table 7.4.8-1, bicycle parking requirements are as follows: a. Multifamily Dwellings and Group Dwelling: i. Short-Term Bicycle Parking: 0.10 spaces per bedroom; for 28 one-bedroom dwellings, the requirement would be 3 ii. Long-Term Bicycle Parking: 0.5 spaces per bedroom; for 28 one-bedroom dwellings, the requirement would be 14; these spaces can be located in common areas or within individual units b. Ensure bicycle parking design is consistent with UDC Section 7.4.9. 9. Per UDC Table 7.4.11-1, multifamily dwellings require no parking spaces to be EV Installed, 10% to be EV Ready, and 20% to be EV Capable. 10. Ensure pedestrian access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. 11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, the Zoning Review Section will conduct a full review to assure compliance with applicable UDC development criteria and technical standards. 12. If you have any questions, please contact me at fernando.garcia2@tucsonaz.gov. |
|||
| TW New Area Development | REVIEW COMPLETED | TP-PRE-0525-00087 - Pre-Application Conference Review v1 – 3901 S KOLB RD Tucson Water offers the following comments for your convenience: 1. Please see Tucson Water’s NW321415 valve map to see the public water mains in Kolb Road that front this group of parcels. Copies of the valve map(s) and/or ‘as-built’ plan(s) referenced in these comments may be obtained from Tucson Water’s Mapping & GIS Center by sending an e-mail request for them to TWMapInfo@tucsonaz.gov. 2. An existing 6” public water main stub-out and a fire hydrant was constructed to serve this property under Tucson Water Plan No. 154-1982. These are shown on Sheet 5 of this plan. 3. The water pressure in this area at ground level (based on elevation) is estimated to be in the 67 to 74 psi range. 4. Tucson Water will allow this project to be served by a single master water meter that discharges to a private water distribution system. Tucson Water also recommends (but is not requiring) that each individual dwelling unit be equipped with its own private sub-meter. 5. The required size of the master water meter for this project will need to be determined by a water fixture count conducted in accordance with the 2018 International Plumbing Code and Tucson Water’s Water Meter Sizing Guidelines. Tucson Water’s Water Meter Sizing Guidelines are available at https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/tucson-water/documents/signed_meter_sizing_guidelines_march_2020.pdf. 6. If a 3” or larger master water meter is needed for this development, the master water meter will need to be located within a large meter enclosure that is a minimum of 25’ long x 10’ wide x 5’ high per Tucson Water Standard Detail SD-314. The entire large meter enclosure must be located on the property in a water easement granted to the City of Tucson. 7. To comply with Tucson Water’s Tucson Water’s Remote Meter Policy No. IV-B.08, Eff. 07/14/2009, these four existing parcels will need to be combined into a single parcel. 8. The submitted site plan shows some of the dwelling units within existing easements. This will not be allowed. The existing easements will need to be are released to utilize the proposed building locations. 9. The Kolb Commercial Subdivision, Lots 1-4 final plat indicates there is a public utility easement created by BK 27, M&P, PG 92 on this property. Please note that the City of Tucson may only release only the City of Tucson’s interest in this public utility easement via a re-subdivision plat. The interests of other public utilities in this public utility easement will need to be released by separate instruments. See Section 11-01.4.0 SUPPLEMENTAL DOCUMENTATION SPECIFICATIONS of the Technical Standards Manual of the City of Tucson’s Uniform Development Code. 10. If and when any new domestic water, irrigation water, or fire water services are needed to serve this proposed development, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW Common@tucsonaz.gov. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |