Plan Number: TP-PRE-0523-00197
Parcel: 141185950

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0523-00197
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0523-00197 – Address: 10165 E OLD VAIL RD - Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.7082
Site Engineering REVIEW COMPLETED 1. Ensure detention requirements follow the Old Vail Drainage Plan
2. First flush retention regulations are required. Please refer to the updated retention/detention manual at: https://www.tucsonaz.gov/files/pdsd/updated-retention-detention-manual/updated-retention-detention-manual.pdf With amendments listed at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf
3. Maximize water harvesting into any landscaping through the use of curb cuts, scuppers, and flush curbs

Scott Haseman
scott.haseman@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL

PROJECT: OLD VAIL PLAZA
ACTIVITY NO. TP-PRE-0523-000197
ADDRESS/PARCEL: 10165 E OLD VAIL RD/141-18-5950
ZONING: SOLIT ZONING I-1 & C-1

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.
The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
1. Due to the existing nature of the site, there must be an NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.
2. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.
3. There is an existing plant palette for the overarching site; see DP14-0248; please reference that for your new planting palette. If necessary, Site Landscape can email a copy to the applicants.
4. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.
5. There will need to be a interior landscape border on the west side of the site per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements.
6. See Engineering notes for Retention/Detention.
7. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.
8. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. Landscape plan should have spot elevations in the detention/retention areas as well as in all water harvesting areas in the Landscape Plan.
9. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot.
10. Commercial Rainwater Harvesting plan is required per UDC Technical Standards Manual – Section 4-01.3.0. and Section 5-01.0.0 Landscaping and Screening. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf

With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf


If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Nicholas Martell, Principal Planner
PROJECT: Thursday Pre-submittal meeting - TP-PRE-0523-00197
Address: 10165 E OLD VAIL RD
Parcel: 141185950
Zoning: C-1, I-1
Existing Use: Vacant
Proposed Use: Retail, Food Service
TRANSMITTAL DATE: May 17, 2023
COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. Zoning is split between C-1 and I-1. Food Service is permitted in the C-1 zone with adherence to the following use-specific standards: 4.9.4.M.1 & 5 and 4.9.13.O. Food Service is permitted in the I-1 Zone without use-specific standards.
3. Parking is generally calculated as follows (Table 7.4.4-1 UDC). Please refer to DP14-0248 for more parking specifics, as parking is calculated per phase within this plat.
4. Please refer to the “Proposed Lot & Common Area Breakdown” chart for maximum building area calculations.
5. The maximum height of a principal structure in the plat is 30’.
6. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met.
7. The development is the ADC-3 Overlay Zone. Please refer to 5.6.8.C for restrictions within the zone.
8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.
If you have any questions about this transmittal, contact me at Nicholas.Martell@tucsonaz.gov
Traffic Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
TW New Area Development REVIEW COMPLETED TP-PRE-0523-00197 - Pre-Application Conference Review v1 – 10165 E OLD VAIL RD

1. Tucson Water has no objections to, or comments on, the proposed development.
2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov