| Fire New Construction | REVIEW COMPLETED | TP-PRE-0424-00113 • Pre-Application Conference Review v1 • 1200 N EL DORADO PL Unit: BLDG 1 UNIT 100 TUCSON, AZ 85715: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
| ROW Engineering Review | REVIEW COMPLETED | TP-PRE-0424-00113 1200 N. El Dorado Pl. Comments: 1. Construction of a “direct access point” onto Wilmot Rd will have several requirements. The first most obvious is the removal of several Eucalyptus trees. Being that these trees are in the Right of Way, the removal of these trees will require a review from the DTM Landscape Architect- David Marhefka. David.Marhefka@tucsonaz.gov 2. City of Tucson storm drain Catch Basin will have to be RELOCATED. 3. The existing sidewalk scupper can be eliminated and not replaced. 4. Handrail at the scupper and the back-side inlet of the catch basin will be surplus and taken to an appropriate city of Tucson location. (Contact Shawn Moore. Shawn.Moore@tucsonaz.gov) 5. Sanitary sewer manhole adjustment, possible reconstruct. Pima County will have to be consulted. 6. There are other utilities in the area. The property owner is responsible for verification of existing utilities and contacting the utility owners to determine whether or not adjustments are necessary. 7. A Traffic Impact Analysis-TIA-will have to be completed. 8. New curb returns will be required and are to have a 25 Ft. radius. 9. New curb access ramps to be constructed at each curb return, per P.A.G. standard 207. 10. New concrete curb per P.A.G. standard 209. (Match existing.) (A curb transition is acceptable per P.A.G. standard 210.) 11. Paved entrance paved with City Mix No. 2 with TR-22. 12. The Pedestrian Pathway portion of the entrance must be constructed with a maximum of a 2% cross slope. 13. Right of Way total width and the one-half width will need to be shown and labeled on the DP plan. 14. Sight Visibility Triangles will have to be shown and labeled on the DP plan. 15. At least one sidewalk is required to connect the onsite circulation path to sidewalk in the ROW. 16. Where adjoining sidewalk from the property ties to sidewalk along the ROW frontage, a 5’ X 5’ ADA landing is required. Landings shall be 5’ X 5’ and not to exceed a 2% cross slope in all directions. David Stiffey DTM Project Coordinator David.Stiffey@tucsonaz.gov |
|||
| Site Engineering | REVIEW COMPLETED | Site Engineering has no comments or concerns about the proposed new access drive. Lianne Evans lianne.evans@tucsonaz.gov |
|||
| Site Landscape | REVIEW COMPLETED | CDRC TRANSMITTAL PLANNING AND DEVELOPMENT SERVICES DEPARTMENT REVIEWER: CHAD KELLER, RLA PDSD LANDSCAPE/NATIVE PLANT PRESERVATION SECTION PROJECT: PROPOSED DIRECT ACCESS TO WILMOT ROAD FROM EL DORADO SQUARE DEVELOPMENT ACTIVITY NO: TP-PRE-0424-00113 ADDRESS/PARCEL: 1200 N EL DORADO PL/133146610 ZONING: C-1 COMMERCIAL ZONE This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants, and water harvesting. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to ensure compliance with the applicable UDC development criteria and Technical Standards. COMMENTS: 1. DTM approval is required for all planting, irrigation or tree removal work being done in the ROW prior to the approval of the development package. Reach out to David Marhefka (david.marhefka@tucsonaz.gov) if necessary for this project. If you have any questions about these comments, I can be reached at chad.keller@tucsonaz.gov |
|||
| Site Zoning | REVIEW COMPLETED | CDRC Thursday Pre-Submittal Transmittal PDSD Zoning Review FROM: Georgia Pennington, Planner PROJECT: Thursday Pre-submittal meeting TP-PRE-0424-00113 Parcel(s): 133-14-6630 Zoning: C-1 Existing Use: Residential Proposed Use: Access TRANSMITTAL DATE: 6/3/24 COMMENTS: 1. Development must comply with the Administrative Manual Section 2-06 – Minor Development Package. The Minor Development Package is a separate submittal from the building permits, and the building permits cannot be approved until the Minor Development Package is approved. 2. The existing zone is C-1. 3. Construction must comply with 7.8 Access. 4. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards. If you have any questions, please contact me at Georgia.Pennington@tucsonaz.gov. |
|||
| TW New Area Development | REVIEW COMPLETED | TP-PRE-0424-00113 - Pre-Application Conference Review v1 – 1200 N EL DORADO PL Tucson Water has no objections to, or comments on, the proposed direct access to Wilmot Road. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to: Tim Rowe, P.E., Civil Engineer Tucson Water, New Development Section 201 N. Stone Avenue, #2-220 P.O. Box 27210 Tucson, AZ 85726-7210 (520) 837-2106 tim.rowe@tucsonaz.gov |