Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Approved
Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1
Plan Number - TP-PRE-0424-00106
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Transportation Landscape Review | APPROVED | ||||
DTM - Park Tucson | REVIEW COMPLETED | With the proximity to the SunLink streetcar tracks, Park Tucson would support the use of an curbside loading zone space at this location. There may be potential concern with having a vehicle parking in the space to the west, due to how small the spaces are and being adjacent to the streetcar. | |||
Fire New Construction | REVIEW COMPLETED | TP-PRE-0424-00106 • Pre-Application Conference Review v1 • 222 E CONGRESS ST TUCSON, AZ 85701: Based on the information provided, TFD has no comments at this time. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
|||
Historic | REVIEW COMPLETED | The proposed outdoor patio seating area is located within the Downtown National Register Historic District. The project should be reviewed by the Plans Review Subcommittee. 1) Please provide additional information on the finishes of the metal panels and tubes. 2) Indicate the height of the panels and the overall structure. 3) Provide either a rendering showing the patio element in front of the building or a scale elevation to help understand the impact to the contributing resource. Questions? Jodie.Brown@tucsonaz.gov | |||
MITZ District | REVIEW COMPLETED | Coordination of constuction dates will occur with the right of way permit. Downtown events my impact your scheduled contruction date. | |||
Real Estate | REVIEW COMPLETED | Show dimensions on existing parking spaces, existing sidewalk widths need to be shown, storm water direction needs to be shown at the curb, show width from curb to building. Thomas.Kral@tucsonaz.gov | |||
ROW Engineering Review | REVIEW COMPLETED | Show existing and proposed drainage patterns show existing scuppers show valley gutter |
|||
Streetcar Track Access Review | REVIEW COMPLETED | Sun Link has no issues with the proposed streatary on Congress at the Juniper per Jeannette Haro. | |||
Traffic Engineering Review | REVIEW COMPLETED | ||||
Transportation Application Review | REVIEW COMPLETED | Consider decking material with removable panels to clean and maintain under the decking and mitigate potential stormwater drainage issues. Please show any relevant electrical connections to overhead festoon lighting. |