Plan Number - TP-PRE-0424-00100
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED TP-PRE-0424-00100 • Pre-Application Conference Review v1 • 1110 W IRVINGTON RD TUCSON, AZ 85714:
Based on the information provided, TFD has no comments at this time.
Questions: patricia.shelton@tucsonaz.gov / 520.837.708
ROW Engineering Review REVIEW COMPLETED No Comments

David Stiffey

David.Stiffey@tucsonaz.gov
Site Engineering REVIEW COMPLETED 1. Site Engineering has no objections or comments to the proposed plans.

Mike Ortiz
michael.ortiz@tucsonaz.gov
Site Landscape REVIEW COMPLETED Landscape/NPPO have no comments or concerns with the improvements to the existing TARP Water Treatment Plant.

Chad Keller
chad.keller@tucsonaz.gov
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Nicholas Martell, Principal Planner
PROJECT: Thursday Pre-submittal meeting - TP-PRE-0424-00100
Address: Parcel 12004003J
Zoning: R-1
Existing Use: Utilities-Distribution System
Proposed Use: Utilities-Distribution System
TRANSMITTAL DATE: May 8, 2024
COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. This Development Package will be reviewed as a CIP project.
3. Utilities-Distribution System is allowed in the R-1 Zone using the Zoning Examiner Special Exception Procedure found in UDC 3.4.3.
4. The development must comply with UDC Use Specific Standards 4.9.11.A.1, .2, .5, .8, .9, .11, .12
5. Parking is calculated as follows (Table 7.4.4-1 UDC); 1 space per 500 sq. ft. GFA, with a minimum of 2 spaces per facility
6. Please reach out to John.Beall@tucsonaz.gov to inquire whether a special exception procedure is necessary.
7. Non-residential uses to non-residential zones have 0’ setbacks adjacent to interior lots. Non-residential uses adjacent to residential zones have a setback requirement of 10' or ¾(H) (UDC6.3-2.A)
8. The maximum allowable height of a primary structure in the R-1 zone is 25’ (UDC TABLE 6.3-2.A)
9. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met.
10. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.
If you have any questions about this transmittal, contact me at Nicholas.Martell@tucsonaz.gov
TW New Area Development REVIEW COMPLETED TP-PRE-0424-00100 - Pre-Application Conference Review v1 – 1110 W IRVINGTON RD

Tucson Water’s New Area Development Section has no objections to, or comments on, the proposed development.

The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106