Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TP-PRE-0223-00115
Parcel: 11811049J

Address:
987 W 34TH ST

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0223-00115
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED Neighborhood will require fire hydrants to be installed and depending on placement, the houses built on these plots might require fire sprinklers.

Questions:

Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
Historic REVIEW COMPLETED Work has occurred at the site without the benefit of an archaeological monitor. A damage assessment will need to be completed for the disturbance that has already occurred at the site. A plan for the damage assessment should be submitted to the city of Tucson Historic Preservation Office (HPO) for review and approval prior to the archaeological and construction work. Once the assessment is completed, the report should be submitted to the HPO for review. Recommendations to mitigate any damage should be followed prior to the commencement of new construction at the site.
Existing requirements noted in the Zoning Conditions dated 8.15.2013 should remain in effect for areas that have not been disturbed by the previously noted unpermitted work.
Site Engineering REVIEW COMPLETED Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview
The Stormwater Detention-Retention Manual can be found online at https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-manual-board-version-201511.pdf
With the City of Tucson edits at https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf


1. The current proposal differs from the Preliminary Development Plan approved in the site rezoning. Site plan must be edited to match the PDP or submitted as a major change to the previous rezoning
2. Balanced basin retention is required on the site. Stormwater detention on the site must be such that post development peak discharge rates are reduced to pre-development rates.
3. First flush stormwater retention is required. The first half inch of rain must be retained onsite in basins or landscaped areas.
4. Adhere to Low Impact Design standards by maximizing water harvesting to landscaped areas.
5. Sidewalks are required along all road frontages.
6. The site is located within a archaeological sensitivity zone. An archaeological survey will be required before any grading can take place.
7. Any proposed block plats must be submitted under a subdivision application type.

Lianne Evans
lianne.evans@tucsonaz.gov
Site Landscape REVIEW COMPLETED PROJECT: MERIDIAN ENGINEERING
ACTIVITY NO. TP-PRE-0223-00115
ADDRESS/PARCEL: 987 W 34TH ST/118-11-049J
ZONING: I-1, P-1

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
1. This may be considered a major revision to the approved PDP. Please reach out to John Beale (john.beale@tucsonaz.gov) in the Entitlements section to schedule a meeting in regards to the existing PDP.
2. Please address the code violation case (CE-VIO1222-00946).
3. C9-09-03 Rezoning Comments
- Should buffelgrass be present on the site, a buffelgrass mitigation management plan shall be created for the site as a component of the Native Plant Preservation Plan portion of the Landscape Plan.
- One canopy tree shall be provided for every four parking spaces within each vehicular use area. Alternately, the applicant may demonstrate, through a shade pattern analysis that the shade created by mature canopy trees, buildings and other structures on the vehicular use area, during summer June or July between 9:30 A.M. and 3:30 P.M., shall cover fifty percent of the paved area.
- All trees planted within the landscape buffer areas shall be placed twenty-five feet apart
- Construct a continuous all-weather pedestrian path from El Puente Lane south along the west side of Fiandaca Boulevard and on the north side of 34th Street from Fiandaca Boulevard to Santa Cruz Lane. Where possible, sidewalk to have a two foot separation from back of curb/pavement edge.
- Water harvesting and irrigation shall be provided by complying with the Commercial Water Harvesting ordinance (Municipal Code Article III. Section 6, Oct. 14, 2008) and Development Standards No. 10-03.0, as adopted by Mayor and Council
4. There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.
5. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.
6. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.
7. Ensure the landscape borders match the PDP from Case C9-09-03.
8. See Engineering notes for Retention/Detention.
9. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.
10. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. Please include spot elevations in the detention/retention areas as well as in all water harvesting areas in the Landscape Plan.
11. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot.
12. A Commercial Rainwater Harvesting plan is required per UDC Technical Standards Manual – Section 4-01.3.0. and Section 5-01.0.0 Landscaping and Screening. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf

With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf
13. Reach out to Jodie Brown in Historic (jodie.brown@tucsonaz.gov) to go over the archaeology required for the site.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Wyatt Berger, Lead Planner

PROJECT: Thursday Pre-submittal meeting – TP-PRE-0223-00115
Address: 937 W 34th St
Parcel(s): 118-11-049J
Zoning: P-I “park industrial” and I-1 “light industrial”
Existing Use: Undeveloped
Proposed Use: Industrial park

TRANSMITTAL DATE: March 8, 2023

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package. Building permits may be applied for concurrently with the development package; however, the development package must be approved prior to approval of the associated building permit.
2. Administration and Professional Office uses (Buildings “A” and “B”) are permitted in the P-I zone, subject to use-specific standard 4.9.13.Q. General Manufacturing uses (Buildings “C,” “F,” and “G”) are permitted in the P-I zone, subject to use-specific standards 4.9.5.C.2, .4, .5 .6, & .8 and 4.9.13.Q, as well as permitted in the I-1 zone, subject to use-specific standards 4.9.5.C.2, .6, .7, & .8 and 4.9.13.Q. Major Trade Service and Repair (Building “E”) is permitted in the I-1 zone, subject to use-specific standards 4.9.4.X.1 and 4.9.13.Q. Lastly, Commercial Storage “Building “D” is permitted in the P-1 zone, subject to use-specific standards 4.9.10.A, 4.9.5.C.8, and 4.9.13.Q. Provide uses as defined within the UDC with the development package.
3. Required setbacks from adjacent public roadways in 20 feet or one and one-half the height of the proposed wall, measured from the street property line. Interior setbacks may be as little as zero feet.
4. Motor vehicle parking requirements are as follows: Administrative and Professional Office as well as Major Trade Service and Repair uses require one parking space per 300 square feet gross floor area (gfa); General Manufacturing uses require one parking space per 1,000 square feet gfa; Commercial Storage requires one parking space per 5,000 square feet gfa (all UDC Table 7.4.4-1).
5. Short-term bicycle parking requirements are as follows: Administrative and Professional Office uses require one space per 2,000 square feet gfa, with a minimum requirement of two spaces; General Manufacturing uses do not require short-term bicycle parking; Major Trade Service and Repair uses require two spaces; Commercial Storage uses do not require short-term bicycle parking (all UDC Table 7.4.8-1).
6. Long-term bicycle parking requirements are as follows: Administrative and Professional Office uses require one space per 6,000 square feet gfa, with a minimum requirement of two spaces; General Manufacturing uses require one space per 15,000 square feet gfa, with a minimum requirement of two spaces and a maximum requirement of ten spaces; Major Trade Service and Repair uses require one space per 12,000 square feet gfa, with a minimum requirement of two spaces; Commercial Storage uses require one space per 40,000 square feet gfa, with a minimum requirement of two spaces and a maximum requirement of ten spaces (UDC Table 7.4.8-1).
7. Ensure compliance with all rezoning conditions of C9-09-03.
8. The proposed site circulation and layout differ from the preliminary development plan associated with rezoning case C9-09-03. Contact John Beall, Entitlements Section Manager, at John.Beall@tucsonaz.gov to determine whether the proposal still meets the intent of rezoning case C9-09-03.
9. Ensure compliance with Technical Standards Manual Section 7-01.4.3. All sidewalks must be a minimum of four feet wide and installed to avoid any obstruction which decreases the minimum width to less than four feet.
10. Ensure access standards found in Section 7.8 of the UDC and Sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met.
11. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Wyatt.Berger@tucsonaz.gov.
Traffic Engineering Review REVIEW COMPLETED No Comment

David Stiffey
David.Stiffey@tucsonaz.gov
TW Hydraulic Modeling Review REVIEW COMPLETED TP-PRE-0223-00115 - Pre-Application Conference Review v1 - 987 W 34TH ST
1. Tucson Water has no objections to the proposed development and offers the following comments for your convenience:
2. An existing 8”PVC “B” pressure zone public water main is located in W 34th ST on the north side of the property. This project will need to obtain all its water from this water main.
3. An existing 24” PVC “A” pressure zone publc water transmission main is located at the south east corner of the property. No connections may be made to this water transmission main.
4. If you need to, or intend to, construct an on-site fire loop with fire hydrants, the fire loop will need to be a public water main, and all fire hydrants will need to be public fire hydrants to ensure they receive the maintenance they require.
5. The owner/developer will need to construct all on-site and any off-site public water mains necessary to serve this development at his or her own expense.
6. The following requirements will apply to the design and construction of the new public water mains:
a. The owner/developer will first need to obtain a Water Availability Letter from Tucson Water via the Tucson Development Center Online website that verifies this project is within Tucson Water’s service area. This document is required for all projects, even though it may be obvious that the project is within Tucson Water’s service area. It is used in many other development processes, most notably the City Council’s final plat approval process.
b. A master water plan showing the proposed water main layout will then need to be prepared for this project.
c. The proposed new on-site water mains will need to connect at least two different points in Tucson Water’s existing water distribution system and form a loop as required by Section 8-06.4.2.A of Tucson Water’s Design Manual to meet water quality and fire flow requirements. If such looping is not legally or technically feasible, a written explanation of what legal and/or technical reasons prevent such looping must accompany the Master Water Plan when it is submitted for review.
d. The new public water mains will also need to be located within public or private streets to the maximum extent practicable. Where this is not practicable, the new water mains will need to be centered within public water easements that are a minimum of 15’ wide and lie on smallest number of private parcels possible.
e. The local fire department’s fire flow requirement for the building type, the fire hydrants and the fire department’s vehicular access also need to be shown on the water master plan.
f. The water master plan must be submitted for review and acceptance via the Tucson Development Center Online website, wherein it will be routed to Tucson Fire Department and Tucson Water reviewers for review.
g. Upon the Fire Department’s and Tucson Water’s acceptance of the water master plan, a detailed water design plan for the new water mains must be prepared
h. The detailed water design plan must also be submitted to Tucson Water’s New Development section for review and acceptance via the Tucson Development Center Online website
i. The owner of the property will need to enter into a Construction Agreement with Tucson Water regarding the construction of the new water mains before Tucson Water will accept the detailed water design plan.
j. Upon Tucson Water’s acceptance of the detailed design plan, the detailed design plan must be submitted to Pima County Development Services Department for an ADEQ Approval To Construct to comply with State of Arizona law.
k. Only after all the above tasks have been completed, may the owner/developer schedule a Pre-Construction Meeting with Tucson Water’s Construction section to schedule the start of the new public water main construction.
l. The new public water mains will not be accepted into Tucson Waters distribution system for use, and no water meters will be issued, until all new public water easements shown on the detailed construction plan have been recorded.
7. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov