Plan Number: TP-PRE-0123-00094
Parcel: 22017001B

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0123-00094
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED Questions:

Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
Site Engineering REVIEW COMPLETED Engineering has no comments.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PROJECT: HILLS #1 BOOSTER STATION
ACTIVITY NO. TP-PRE-0123-00094
ADDRESS/PARCEL: 7980 N CHRISTIE DR/220-17-001B
ZONING: NA

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
Landscape/NPPO has no current issue with this project.

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review

FROM: Wyatt Berger, Lead Planner

PROJECT: Thursday Pre-submittal meeting - TP-PRE-0123-00094
Address: 7980 N Christie Dr
Parcel(s): 220-17-001B
Zoning: Within Unincorporated Pima County
Existing Use: Utilities Use Group, Distribution System
Proposed Use: Utilities Use Group, Distribution System

TRANSMITTAL DATE: February 16, 2023

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package. Although this property is within Pima County jurisdiction, Development Packages and Building Permits are processed through the City of Tucson.
2. As this property is not within a City of Tucson zoning designation, the zoning review of the proposal will be limited to ADA compliance and Development Package formatting requirements.
3. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.

If you have any questions, please contact me at Wyatt.Berger@tucsonaz.gov.
Traffic Engineering Review REVIEW COMPLETED No Comments
TW Hydraulic Modeling Review REVIEW COMPLETED 1. Tucson Water New Development has no objections to, or comments on, the proposed development.
2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov