Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: TP-PRE-0123-00084
Parcel: 13316013E

Address:
6610 E GRANT RD

Review Status: Approved

Review Details: PRE-APPLICATION CONFERENCE REVIEW v.1

Plan Number - TP-PRE-0123-00084
Review Name: PRE-APPLICATION CONFERENCE REVIEW v.1
Review Status: Approved
Review Date Reviewer's Name Type of Review Description Status Comments
Fire New Construction REVIEW COMPLETED I was contacted regarding this one. There is a hydrant located on the property that will need to be relocated at an approved location and or fire sprinklers installed. Fire sprinkler might be an issue since Grant Rd in that area is under a moratorium.

Questions:

Jennifer Peel-Davis
Tucson Fire Department
Fire Plans Examiner
Fire Inspector I, II and Fire Alarm Plans Examiner
Jennifer.Peel-Davis@Tucsonaz.gov
Desk: 520-837-7033
Site Engineering REVIEW COMPLETED 1. Follow Commercial Rainwater Harvesting standards and maximize water harvesting to landscaped areas.
2. Ensure Waste maneuverability and design per TSM 8-01
3. Ensure roof drainage up to the 10-yr storm is directed under adjacent sidewalks through the use of scuppers/gutters
4. Provide pedestrian access from the site to the existing sidewalks in adjacent properties.
Joshua Garcia
joshua.garcia@tucsonaz.gov
Site Landscape REVIEW COMPLETED CDRC TRANSMITTAL
PROJECT: 3 BAY OIL CHANGE
ACTIVITY NO. TP-PRE-0123-00084
ADDRESS/PARCEL: 6610 E GRANT RD/133-16-013E
ZONING: C-2

This plan has been reviewed for compliance with applicable development criteria in the City of Tucson Unified Development Code (UDC) Administrative Manual (AM) Section 2-11 and Technical Manual (TM) Section for landscape, native plants and water harvesting.

The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Landscape/NPPO to assure compliance with the applicable UDC development criteria and Technical Standards.

COMMENTS:
1. There must be a NPPO or NPPO waiver. An NPPO is required per UDC 7.7.3-B. A Native Plant Preservation Plan, Section 7.7.4, is required to be submitted or approved or a request for an exception from the Native Plant Preservation requirements approved in accordance with Sections 7.7.3.D.3 & .4 of the UDC and Admin. Manual Section 2-11.0.0 prior to Grading Plan approval.
2. A landscape plan is required per 7.6.2.B.1-b. The Unified Development Code (UDC) requires all new development or an expansion of greater than 25% of an existing development to submit a landscape plan, UDC 7.6.2. Preparation of the landscape plan shall adhere to UDC 7.6.4 and Administrative Manual 2-10.
3. Ensure the required number of trees is in all vehicular parking areas (1 tree: 4 parking spaces) per UDC 7.6.4.B.1. Trees are to be distributed evenly throughout the parking area, UDC 7.6.4.1.B.1, UDC Technical Standards Manual 5-01-.3.2 and UDC 7.6.4.B.1.a.
4. There will need to be a street landscape border on E Grant Rd per UDC 7.6.4.C-2 and Table 7.6.4-1. See UDC 7.6.4.C for landscape border requirements.
5. See Engineering notes for Retention/Detention.
6. All landscape plans shall incorporate water conserving design as defined in UDC Section 7.6.6, Use of Water, and as described in the Technical Standards Manual 5.01-5.11.
7. The Landscape Plan should match the Commercial Rainwater Harvesting Plan as well as the Grading Plan. Please include spot elevations in the detention/retention areas as well as in all water harvesting areas in the Landscape Plan.
8. Maximize the rainwater harvesting across the site into the landscape areas, including but not limited to the street landscape borders as well as the tree wells for the required trees for the parking lot.
9. Commercial Rainwater Harvesting plan is required per UDC Technical Standards Manual – Section 4-01.3.0. and Section 5-01.0.0 Landscaping and Screening. Adherence to the Low Impact Development Standards outlined in Section 5 of the PCRFCD Design Standards for Stormwater Detention and Retention is required and shall work in conjunction with the Commercial Rainwater Harvesting design. Using Low Impact Development design and water harvesting provides critical basin detention and first flush retention for all new development and impervious area. The newly adopted Detention/Retention Manual can be found: https://webcms.pima.gov/UserFiles/Servers/Server_6/File/Government/Flood%20Control/Rules%20and%20Procedures/Stormwater%20Detention-Retention/dssdr-final-201406-manual.pdf

With CoT edits to the manual are found at: https://www.tucsonaz.gov/files/pdsd/codes/Detention_Retention_Manual_Tech_Standards_Amemdments.pdf

If you have any questions about these comments, I can be reached at Matthew.Carlton@tucsonaz.gov or 520-837-4988
Site Zoning REVIEW COMPLETED CDRC Thursday Pre-Submittal Transmittal
PDSD Zoning Review
FROM: Paul Camarena, Planner
PROJECT: Thursday Pre-submittal meeting – TP-PRE-0123-00084
Address: 6610 E GRANT RD
Parcel(s): 13316013E
Zoning: C-2
Existing Use: Food Service
Proposed Use: Automotive
TRANSMITTAL DATE: 2/14/2023

COMMENTS:
1. Development must comply with the Administrative Manual Section 2-06 - Development Package.
2. The use is Automotive – Minor Service and Repair, which is permitted in the C-2 zone. The development is subject to use specific standards C-2: 4.9.13.E
3. Vehicular parking requirements are 1 space per 300 sq. ft. GFA
4. Bicycle Parking requirements are 2 short-term parking spaces and Long-term parking 1 space per 12,000 sq. ft. GFA, the minimum requirement is 2 spaces;
5. The minimum width of a two-way PAAL is 24 ft.
6. Ensure access standards found in section 7.8 of the UDC and sections 7-01.0.0 and 10-01.0.0 of the Technical Standards Manual are met. Pedestrian access along the street is required. Show complete pedestrian circulation for the site.
7. The required setback along Grant Rd is the greater of 21ft or the Height measured from the back of existing curb or future curb location.
8. The comments provided are preliminary and are not to be assumed as a complete review of the proposal. During the Development Package review process, a full review will be made by Zoning to assure compliance with the applicable UDC development criteria and Technical Standards.
If you have any questions, please contact me at Paul.Camarena@tucsonaz.gov
Traffic Engineering Review REVIEW COMPLETED No Comments
TW Hydraulic Modeling Review REVIEW COMPLETED 1. Tucson Water has no objections to, or comments on, the proposed development.
2. The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to:

Tim Rowe, P.E., Civil Engineer
Tucson Water, New Development Section
201 N. Stone Avenue, #2-220
P.O. Box 27210
Tucson, AZ 85726-7210
(520) 837-2106
tim.rowe@tucsonaz.gov