Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: MODIFICATIONS REVIEW v.1
Plan Number - TP-MOD-1123-000027
Review Name: MODIFICATIONS REVIEW v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Entitlements | REQUIRES RESUBMIT | Per 3.5.4 of the Unified Development Code, this modification qualifies as a major change due to the change in "Use" and the reconfiguration of the site and traffic generation due to the proposed use (3.5.4.c & d ). Procedurally, a major amendment to conditions follows the outline below: a. A request for a major amendment to the conditions of approval or the approved preliminary is subject to either the Zoning Examiner Legislative Procedure, per UDC Section 3.5.3, or Mayor and Council approval at a public hearing. b. A neighborhood meeting is required per the requirements of Section 3.2.2. c. After the required neighborhood meeting the PDSD Director will determine which process the request will follow. The PDSD Director's determination is not subject to appeal. 1. The request shall follow the Zoning Examiner Legislative Procedure if the PDSD Director determines, after the neighborhood meeting, that the application presents issues that would be appropriate for review and recommendation from the Zoning Examiner prior to Mayor and Council consideration. 2. The request is subject only to Mayor and Council approval at a public hearing if the PDSD Director determines that no review by the Zoning Examiner is needed to inform the Mayor and Council's consideration of the application. The Mayor and Council may proceed to make that decision after a Public Hearing; and also have the option to remand the application to the Zoning Examiner for the Zoning Examiner's review and recommendation. d. The same voting requirements as for the original adoption shall apply to the request for a substantial change of conditions. Please coordinate with PDSD Staff for the fee and receiving mailing labels. Please be aware the neighborhood meeting date and the resubmittal date to PDSD cannot exceed 60 days. Additionally, your rezoning fees will range from $6,500-6,700. |
|||
Site Zoning | REQUIRES RESUBMIT | ||||
Site Engineering | REVIEW COMPLETED | Because no changes to the drainage or grading plan is proposed, Site Engineering has no comments or concerns about the proposed modification. Lianne Evans lianne.evans@tucsonaz.gov |
|||
Traffic Engineering Review | REVIEW COMPLETED | No comments from DTM Traffic Engineering Division. |