Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Requires Resubmit
Review Details: MODIFICATIONS REVIEW v.2
Plan Number - TP-MOD-1023-000024
Review Name: MODIFICATIONS REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Entitlements | REQUIRES RESUBMIT | Requires resubmittal. Please provide land use for proposed structures. Please provide a list of the previous zoning conditions and which conditions will remain, and which will be modified. The revised Preliminary Development Plan Special should include be garbage refuse, loading and unloading spaces as well as the Lee Street Access. Please provide vehicle and bicycle calculation based on the proposed land use. Please clarify existing and proposed development. Samuel Paz samuel.paz@tucsonaz.gov 520-837-4973 |
|||
Site Zoning | REQUIRES RESUBMIT | Provide all zoning uses for the site, along with any applicable use specific standards to the PDP. Please refer to the use tables in UDC 4.8: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az_udc/0-0-0-2074 For a quick review on the next cycle, please contact me at Nicholas.Martell@tucsonaz.gov |
|||
Site Engineering | REVIEW COMPLETED | Site Engineering has no comments | |||
Site Landscape | REVIEW COMPLETED | ||||
Traffic Engineering Review | REVIEW COMPLETED | DTM Traffic Engineering does not object to secondary access point on Lee St, with condition that there be a channelizing "porkchop" feature constructed so that all exiting traffic must turn left on Lee St to head towards Alvernon Way, and not travel east through the neighborhood. Thanks! |