Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: TP-ENT-1026-00015
Parcel: 13303315H

Review Status: In Review

Review Details: ENTITLEMENT REVIEW v.1

Plan Number - TP-ENT-1026-00015
Review Name: ENTITLEMENT REVIEW v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
DTM Planning IN REVIEW
External Reviewers - AZ State Land IN REVIEW
External Reviewers - COT Parks & Recreation IN REVIEW
External Reviewers - Davis Monthan AFB IN REVIEW
External Reviewers - PC RFCD IN REVIEW
External Reviewers - Pima Association of Governments IN REVIEW
External Reviewers - Pima County Addressing IN REVIEW
External Reviewers - Pima County Assessor IN REVIEW
External Reviewers - Pima County Development Services IN REVIEW
External Reviewers - Pima County Natural Resources IN REVIEW
External Reviewers - Pima County Transportation IN REVIEW
External Reviewers - Tohono Oodham IN REVIEW
External Reviewers - Tucson Airport Authority IN REVIEW
External Reviewers - Tucson Electric Power (TEP) IN REVIEW
External Reviewers - Tucson Unified School District (TUSD) IN REVIEW
Real Estate NOT REQUIRED The Real Estate Division has no comments or objections. Plese contact the Real Estate Division if any property rights need to be addressed. 520-791-4181
Streetcar Track Access Review NOT REQUIRED
Entitlement Review Coordinator Express REVIEW COMPLETED
Entitlements REVIEW COMPLETED
External Reviewers - Arizona Department of Transportation (ADOT) REVIEW COMPLETED ADOT has no comments.
Rick Freije, M.S.C.E., P.E.
Regional Traffic Engineer
SOUTHERN REGION TRAFFIC
1221 S 2nd Ave.
Tucson, AZ 85713
Office: 520.388.4203
Mobile: 520.576.8614 |
azdot.gov
External Reviewers - COT Environmental Services REVIEW COMPLETED ES has no objections to this rezoning request.
The proposed DP must comply with TSM 8-01.0 as it pertains to minimum requirements for solid waste collection and storage.

Andy Vera
(520) 8367-3798
Andy.Vera@tucsonaz.gov
External Reviewers - Pima County Wastewater (RWRD) REVIEW COMPLETED Sewer service is available through the 8-inch public sewer G-84-087 located in Speedway Blvd
(Type I P26WC00160, dated June 26, 2026) and the 8-inch public sewer G-2008-080 located to
the west of the property (Type I P26WC00161, dated June 26, 2026).
The following is noted:
“The most likely point of connection to the public sewer system will be at manhole 3223-07
on public sewer G-2008-080. This connection will likely require a lift station and force main due
to the existing grades on the Property and at this manhole. The sewer infrastructure required to
serve the Property will be determined and designed at the time of Development Package
preparation.”
Installation of the lifting system will require approval from PCRWRD.
PCRWRD has no objection to the proposed rezoning but offers the following rezoning
conditions:
Habitat for Humanity Desert Springs Page 2
TP-ENT-1026-00015 October 28, 2026
REZONING CONDITIONS
Should the City of Tucson Mayor and Council be inclined to approve this rezoning, the Pima
County Regional Wastewater Reclamation Department recommends the following wastewater
conditions:
1. The owner(s) shall construe no action by Pima County as a commitment of capacity to serve
any new development within the rezoning area until Pima County executes an agreement with
the owner(s) to that effect.
2. The owner(s) shall obtain written documentation from the Pima County Regional Wastewater
Reclamation Department (PCRWRD) stating that treatment and conveyance capacity is
available for any new development within the rezoning area, no more than 90 days before
submitting any tentative plat, development plan, preliminary sewer layout, sewer improvement
plan, or request for building permit for review. Should treatment and/or conveyance capacity
not be available at that time, the owner(s) shall enter into a written agreement addressing the
option of funding, designing and constructing the necessary improvements to Pima County’s
public sewerage system at his or her sole expense or cooperatively with other affected parties.
All such improvements shall be designed and constructed as directed by the PCRWRD.
3. The owner(s) shall time all new development within the rezoning area to coincide with the
availability of treatment and conveyance capacity in the downstream public sewerage system.
4. The owner(s) shall connect all development within the rezoning area to Pima County’s public
sewer system at the location and in the manner specified by the PCRWRD in its capacity
response letter and as specified by PCRWRD at the time of review of the tentative plat,
development plan, preliminary sewer layout, sewer construction plan, or request for building
permit.
5. The owner(s) shall fund, design and construct all off-site and on-site sewers necessary to serve
the rezoning area, in the manner specified at the time of review of the tentative plat,
development plan, preliminary sewer layout, sewer construction plan or request for building
permit.
6. The owner(s) shall complete the construction of all necessary public and/or private sewerage
facilities as required by all applicable agreements with Pima County, and all applicable
regulations, including the Clean Water Act and those promulgated by ADEQ, before treatment
and conveyance capacity in the downstream public sewerage system is permanently committed
for any new development within the rezoning area.
If you wish to discuss the above conditions, please contact me at (520) 724-6488.
Fire New Construction REVIEW COMPLETED
Historic REVIEW COMPLETED Per the City of Tucson U.D.C. 2-03.4.2.C, preliminary development packages (PDPs) are required to provide a letter from the Arizona State Museum, the State Historic Preservation Office, or a qualified archaeologist indicating whether the site has been field surveyed, whether there are archaeological or historical resources on or adjacent to the site, and stating their recommendations with regard to further investigation and/or preservation. Please re-submit this as part of the PDP.
IPC - Entitlements REVIEW COMPLETED
IPC - Fire New Construction REVIEW COMPLETED
IPC - Site Engineering REVIEW COMPLETED 1. No comments from site engineering
observational note:
Section II.E Hydrology & Drainage discusses the FEMA floodplain associated with the Coronado Ridge Wash and the LOMR to remove the portion of the property from FEMA's floodplain maps and with that removing the area of the development that encroaches into the floodplain, therefore, ERZ regulations will not apply. However, since the Coronado Ridge Wash is not designated as an ERZ wash the floodplain associated with the wash is not ERZ and not subject to ERZ regulations. Only the floodplain from the Tanque Verde wash would be subject to ERZ regulations for this site.

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
IPC - Site Zoning REVIEW COMPLETED 1. COMMENT: Ensure the proposed density complies with UDC 8.7.3.D.4, Residential density in Flexible Lot Development projects is based on the developable area (as defined in Section 11.4.5, Definitions – D) of the site. Zoning acknowledges the current parcel is approximately 9 acres; however, based on the above standard, not all of the area can be used to calculate density.

Per UDC 11.4.5, Developable Area is defined as ‘the land area of a site controlled by a single landowner or entity at the time of issuance of building permits or approval of a subdivision plat if subdividing the property, including those areas which are dedicated as natural areas within a Hillside Development Zone (HDZ) area, but exclusive of any floodway property as described in Chapter 26, Division 1, Floodplain and Erosion Hazard Area Regulations, of the Tucson Code. Those areas within a floodway shall be included in the developable area where the Planning and Development Services Department Engineer have approved construction of a principal building or of an accessory or incidental structure.’

2. COMMENT: Per UDC 8.7.3.P.1.b.1, “an applicant shall hold a neighborhood meeting in accordance with Section 3.2.2.C.1.b prior to submitting an FLD application.”

3. COMMENT: The minimum setback requirement adjacent to Speedway Boulevard is 20’ measured from the existing or future property line. Per UDC 6.4.5.C.1.a, “for single family, duplex, and middle housing development, the minimum required front street perimeter yard is 20 feet measured from the street property line”

Loran Shamis
loran.shamis@tucsonaz.gov
IPC - Traffic Engineering REVIEW COMPLETED As documented in the Traffic Statement attached to the DCR document, the trips to be generated by this 57 attached home development are low, with about 27 AM peak hour trips and 29 PM Peak hour trips to be generated. This represents a small decrease in AM peak hour trips and small increase in PM peak hour trips when compared to the previous site use of charter school. The amount of traffic to be generated by this development can be accommodated for by the existing roadway network. No traffic concerns. Thanks!
ROW Engineering Review REVIEW COMPLETED Private Improvement Agreement, PIA will be required for new public streets.
ROW section shall conform to Street Design Guide and Technical Standards Manual.
ROW composition shall include, travel lanes, curb, buffer space, and sidewalk.
Signs REVIEW COMPLETED All signage must conform to current standards and be applied for separately.
Site Engineering REVIEW COMPLETED 1. Site Engineering has no comments

Stephen Blood
(520) 837-4958
Stephen.blood@tucsonaz.gov
Site Landscape REVIEW COMPLETED PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
REVIEWER: CHAD KELLER, PLA
SITE LANDSCAPE/NATIVE PLANT PRESERVATION SECTION

PROJECT: REZONING TO PERMIT HABITAT FOR HUMANITY RESIDENTIAL PROJECT
ACTIVITY NO: TP-ENT-1026-00015
ADDRESS: 10129 E SPEEDWAY BL
ZONING: SUBURBAN RANCH ZONE (SR)
LAND USE PER UDC TABLE 7.6.4-1: RESIDENTIAL SUBDIVISION
10.30.2026

THE COMMENTS PROVIDED ARE PRELIMINARY AND ARE NOT TO BE ASSUMED AS A COMPLETE REVIEW OF THE PROPOSAL. DURING THE DEVELOPMENT PACKAGE REVIEW PROCESS, A FULL REVIEW WILL BE MADE BY THE SITE LANDSCAPE/NPPO REVIEW SECTION TO ENSURE COMPLIANCE WITH THE APPLICABLE CITY OF TUCSON UNIFIED DEVELOPMENT CODE, TECHNICAL STANDARDS MANUAL AND ADMINISTRATIVE MANUAL REQUIREMENTS FOR SITE LANDSCAPE, NATIVE PLANTS AND RAINWATER HARVESTING.

SITE LANDSCAPE/NPPO COMMENTS:

1. The Environmental Resource Report and the PDP appear to meet the standards required from a site landscape perspective. At the time of Development Package submittal, landscape compliance plans will be required, including native plant preservation plans and Flexible Lot Development requirements for street landscape borders, functional open space and interior subdivision shade trees.

Thank you.

CHAD KELLER, PLA
LANDSCAPE ARCHITECT

CITY OF TUCSON, PDSD, SITE REVIEW SECTION
CHAD.KELLER@TUCSONAZ.GOV
520.837.4923
Site Zoning REVIEW COMPLETED 1. COMMENT: Ensure the proposed density complies with UDC 8.7.3.D.4, Residential density in Flexible Lot Development projects is based on the developable area (as defined in Section 11.4.5, Definitions – D) of the site. Zoning acknowledges the current parcel is approximately 9 acres; however, based on the above standard, not all of the area can be used to calculate density.

Per UDC 11.4.5, Developable Area is defined as ‘the land area of a site controlled by a single landowner or entity at the time of issuance of building permits or approval of a subdivision plat if subdividing the property, including those areas which are dedicated as natural areas within a Hillside Development Zone (HDZ) area, but exclusive of any floodway property as described in Chapter 26, Division 1, Floodplain and Erosion Hazard Area Regulations, of the Tucson Code. Those areas within a floodway shall be included in the developable area where the Planning and Development Services Department Engineer have approved construction of a principal building or of an accessory or incidental structure.’

2. COMMENT: Per UDC 8.7.3.P.1.b.1, “an applicant shall hold a neighborhood meeting in accordance with Section 3.2.2.C.1.b prior to submitting an FLD application.”

3. COMMENT: The minimum setback requirement adjacent to Speedway Boulevard is 20’ measured from the existing or future property line. Per UDC 6.4.5.C.1.a, “for single family, duplex, and middle housing development, the minimum required front street perimeter yard is 20 feet measured from the street property line”

Loran Shamis
loran.shamis@tucsonaz.gov
Sun Tran Review REVIEW COMPLETED
Traffic Engineering Review REVIEW COMPLETED As documented in the Traffic Statement attached to the DCR document, the trips to be generated by this 57 attached home development are low, with about 27 AM peak hour trips and 29 PM Peak hour trips to be generated. This represents a small decrease in AM peak hour trips and small increase in PM peak hour trips when compared to the previous site use of charter school. The amount of traffic to be generated by this development can be accommodated for by the existing roadway network. No traffic concerns. Thanks!
Transportation Landscape Review REVIEW COMPLETED
Tucson Water New Area Development REVIEW COMPLETED Based on the information provided, Tucson Water has no objections to the proposed development.
For development, a looped water system will be required. If such looping is not technically feasible, a written explanation of what legal and/or technical reasons prevent such looping must accompany the Master Water Plan when it is submitted for review. (A Letter of Variance)
A Water master plan will need to be prepared for this project and submitted to Tucson Water and local Fire Department for review and approval. The master plan must show the water main layout and identify if there is construction phasing for the new water mains.
The Water Master Plan and detailed Water Design Plan are separate submittals that must be made through Tucson Water’s electronic plan portal at https://cityoftucsonaz-energovweb.tylerhost.net/apps/selfservice#/home, or can be combined into an “at risk” submittal.
More information about Tucson Water’s Water Master Plan and detailed Water Design Plan processes can be found on-line at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Frequently-Asked-Questions/Tucson-Development-Center-Online-Instructions
Please note that the available option to provide domestic water service for the proposed project is to tie into the existing service stub from the 8-inch PVC water main (D Zone) located on the southwest side of the parcel, within the right-of-way of E Speedway Blvd.
Water pressure in this area is 79-86 PSI at an elevation of 2593ft. Water pressure can vary by an additional 5 psi +/.
This project may receive higher than normal water pressure and may require individual pressure regulators as part of the private plumbing.
The building currently has two existing domestic water meters of varying sizes, as well as a 4-inch fire service line. These services are connected to the same water main mentioned above.
If these services will be abandoned due to the building being demolished, and new service connections will be required, please contact Tucson Water’s New Services Section by calling 520-791-5164 or by sending an email to TW_Common@tucsonaz.gov.

This parcel falls within an Archaeological Sensitivity Zone. For additional information or requirements, please contact the City of Tucson Historic Preservation Office at (520) 837-4984 or PDSDHistoric@tucsonaz.gov.
The above comments are based on the limited preliminary information provided by the applicant and should not be construed as a complete review of the proposal. Any questions, comments or concerns about these comments may be directed to Deepesh Dawadi
(Engineering Manager) at Deepeshraj.Dawadi@tucsonaz.gov