Plan Review Detail
Review Status: Requires Resubmit
Review Details: ENTITLEMENT REVIEW v.1
Plan Number - TP-ENT-0723-00032
Review Name: ENTITLEMENT REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| Entitlement Review Coordinator Express | PENDING ASSIGNMENT | ||||
| Entitlements | PENDING ASSIGNMENT | ||||
| External Reviewers - Arizona Department of Transportation (ADOT) | PENDING ASSIGNMENT | ||||
| External Reviewers - AZ State Land | PENDING ASSIGNMENT | ||||
| External Reviewers - COT Environmental Services | PENDING ASSIGNMENT | ||||
| External Reviewers - COT Parks & Recreation | PENDING ASSIGNMENT | ||||
| External Reviewers - Davis Monthan AFB | PENDING ASSIGNMENT | ||||
| External Reviewers - PC RFCD | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima Association of Governments | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Addressing | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Assessor | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Development Services | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Natural Resources | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Transportation | PENDING ASSIGNMENT | ||||
| External Reviewers - Pima County Wastewater (RWRD) | PENDING ASSIGNMENT | ||||
| External Reviewers - Tohono Oodham | PENDING ASSIGNMENT | ||||
| External Reviewers - Tucson Airport Authority | PENDING ASSIGNMENT | ||||
| External Reviewers - Tucson Electric Power (TEP) | PENDING ASSIGNMENT | ||||
| External Reviewers - Tucson Unified School District (TUSD) | PENDING ASSIGNMENT | ||||
| Fire New Construction | PENDING ASSIGNMENT | ||||
| Historic | PENDING ASSIGNMENT | ||||
| Real Estate | PENDING ASSIGNMENT | ||||
| ROW Engineering Review | PENDING ASSIGNMENT | ||||
| Signs | PENDING ASSIGNMENT | ||||
| Site Engineering | PENDING ASSIGNMENT | ||||
| Site Landscape | PENDING ASSIGNMENT | ||||
| Site Zoning | PENDING ASSIGNMENT | ||||
| Streetcar Track Access Review | PENDING ASSIGNMENT | ||||
| Sun Tran Review | PENDING ASSIGNMENT | ||||
| Transportation - Bike/Ped | PENDING ASSIGNMENT | ||||
| Transportation Landscape Review | PENDING ASSIGNMENT | ||||
| Tucson Water New Area Development | PENDING ASSIGNMENT | ||||
| IPC - Entitlements | REQUIRES RESUBMIT | Requires resubmittal per UDC Section 3.2.2. Submitted beyond the 60 days neighborhood notice. | |||
| IPC - Site Zoning | REQUIRES RESUBMIT | Please provide the following on the next submittal of the PDP: 1. Please show the entire site boundary 2. Show how the 1 way PAAL widths comply with the 20' requirement per UDC 7.4.6-2 3. Provide a UDC use as a general note, along with any use-specific standards 4. Provide the parking requirements on the plan as a general note. It is unclear if the parking to the East will be used for the site. If so, include how the parking will be incorporated on the site. 5. Provide information on how the site is accessed; whether via easement, re-plat, or combination nicholas.martell@tucsonaz.gov |
|||
| IPC - Fire New Construction | REVIEW COMPLETED | ||||
| IPC - Site Engineering | REVIEW COMPLETED | Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview The Stormwater Retention-Detention Manual can be found online at https://www.tucsonaz.gov/files/sharedassets/public/pdsd/documents/engineering-code/updated-retention-detention-manual.pdf 1. Because the proposed development has less impervious paving than the existing development, no additional retention or detention is required as a condition of the rezoning. 2. Maximize water harvesting to the proposed landscaped area through use of curb cuts and flush curbs. Lianne Evans lianne.evans@tucsonaz.gov |
|||
| IPC - Traffic Engineering | REVIEW COMPLETED | As long as access to the site can be worked out, no objection from DTM Traffic Engineering. Traffic impact anticipated is negligible. |