Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Plan Number: TP-AMD-0523-00003
Parcel: 30513009A
Review Status: Approved
Review Details: AMENDMENT REVIEW v.1
Plan Number - TP-AMD-0523-00003
Review Name: AMENDMENT REVIEW v.1
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
Entitlements | APPROVED | No major land use issues identified as presented. A majority of the plan amendment will be Riparian/Flood/Conservation and Drainage related. | |||
Historic | REVIEW COMPLETED | Only a portion of the area has been surveyed for archaeological resources. It also appears that there are some known sites within the boundaries of this area. Prior to any work at the site, protocol laid out in the area plan should be followed which includes, in brief, a records search, a field survey, and based on the survey further investigation may be required. Additional work could include evaluation of the site for National Register eligibility, data recovery or project redesign for avoidance. The narrative should be revised to address cultural resources consistent with the area plan language. | |||
Site Engineering | REVIEW COMPLETED | I met with Brian Underwood and Adam Call to go over the wording of the policy. They explained to me and now I understand that the language in this policy has the purpose of setting up the foundation for development in this region and acknowledges and emphasizes the importance of protecting such things as floodplain, ERZ, and PRA without dictating the implementation. The implementation will happen later at the PCD/Rezoning stage along with secondary studies on current conditions of such things as floodplain, ERZ and PRA if any modifications to the ERZ/PRA zones are proposed. I am fine with the policy language as proposed. Stephen Blood (520) 837-4958 Stephen.blood@tucsonaz.gov |
|||
Site Landscape | REVIEW COMPLETED | Landscape has no comments at this time, but will continue to coordinate with Engineering, Floodplain, and Zoning reviewers during the formal PAD review. | |||
Site Zoning | REVIEW COMPLETED | Zoning has no comments at this time, but will continue to coordinate with Engineering and Landscape reviewers during the formal PAD review. |