Permit Review Detail
Review Status: Requires Resubmit
Review Details: FIRE CONSTRUCTION REVIEW v.4
Permit Number - TF-FCP-0723-00906
Review Name: FIRE CONSTRUCTION REVIEW v.4
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/01/2023 | Fire New Construction | REQUIRES RESUBMIT | Please clarify if UG fire line is 6" or 8" Include the following information on you plans - The Site Plan should include the following: - Diameter, type, and length of all segments - Note indicating fire service underground to conform to NFPA 24 - Note minimum depth of bury to be _______. (typically 30”, more if under high weight traffic) *per NFPA 24 2016ed. 10.4.2.2.2. - Note system to be tested at 200psi (or 50psi above street pressure) for 2 hours *per NFPA 24 2016ed. 10.4.2.2.1. - Note system to be flushed, and flush witnessed by TFD inspector *per NFPA 24 2016ed. 10.10.1. Please note inspectors will be looking at tracer wire, poly wrap of metallic fittings, etc at time of hydro. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
||
| 08/01/2023 | TFD Application Completeness Check Express | REVIEW COMPLETED |