Permit Review Detail
Review Status: Requires Resubmit
Review Details: FIRE CONSTRUCTION REVIEW v.1
Permit Number - TF-FCP-0626-00394
Review Name: FIRE CONSTRUCTION REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/24/2026 | Fire New Construction - Standard | REQUIRES RESUBMIT | Fire Alarm (FA) Reviewer Rob Mathis, CFI-III, CFPS, CFM, CFPE; rmathis@safebuilt.com Discipline Status:Denied Date Completed: 7/24/2026 1.Sheet FA.02 / Graphic scale:Provide correct graphic scale on plans. All scales mentioned on this page do not align with the plans. Graphic representation of the scale used shall be provided on the plans. [NFPA 72 2022ed Sec. 7.2.1 (3)(b)] 2.Sheet FA.02 / Document cabinet:With every new system, a documentation cabinet shall be installed at the system control unit or at another approved location at the protected premises. Show on plans. [NFPA 72 2022ed Sec. 7.7.2.1] 3.Sheet FA.02 / Primary power:Location of fire alarm primary power disconnect shall be shown on plans. [NFPA 72 2022ed Sec 7.4.5(2)(h)] 4.Sheet FA.DETAILS.01 / Project address:Project address shall be provided on each sheet of the plans. [NFPA 72 2022ed Sec 7.4.4(3)] RESUBMITTAL DIRECTIONS: •All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta identification number, with a brief explanation of the change(s). •As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is required for approval and permitting. •Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to each of the noted plan review comments items. •This response narrative must clearly address how each issue was corrected or resolved and indicate where the information may be found within the construction documents. The response narrative must be typewritten, on letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may result in review delays or rejection of the resubmittal. •Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.) have been revised according to the above directions. Please resubmit the complete revised plan set with a separate copy of response narrative PDF through the municipality to complete the review. •Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending on the size of the project and the volume of plans in queue at time of resubmittal. |
||
| 06/16/2026 | TFD Application Completeness Check Express | REVIEW COMPLETED |