Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: FIRE CONSTRUCTION REVIEW v.2
Permit Number - TF-FCP-0623-00786
Review Name: FIRE CONSTRUCTION REVIEW v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/05/2023 | Fire New Construction | REQUIRES RESUBMIT | Verify submittal does not contain any previous approval stamps. The Site Plan should include the following: - Actual physical address of project - Installing contractor, including address, phone number and ROC information - Diameter, type, and length of all segments - Indicate method and type of joint restraints - Note indicating fire service underground to conform to NFPA 24 - Note minimum depth of bury to be _______. (typically 30”, more if under high weight traffic) *per NFPA 24 2016ed. 10.4.2.2.2. - Note system to be tested at 200psi (or 50psi above street pressure) for 2 hours *per NFPA 24 2016ed. 10.4.2.2.1. - Note system to be flushed, and flush witnessed by TFD inspector *per NFPA 24 2016ed. 10.10.1. Please note inspectors will be looking at tracer wire, poly wrap of metallic fittings, etc at time of hydro. Please include notes on plan. It is only required to submit the sheet that includes the fire line. Questions: patricia.shelton@tucsonaz.gov / 520.837.7082 |
||
06/20/2023 | TFD Application Completeness Check | REVIEW COMPLETED |