Permit Review Detail
Review Status: Requires Resubmit
Review Details: FIRE CONSTRUCTION REVIEW v.1
Permit Number - TF-FCP-0526-00360
Review Name: FIRE CONSTRUCTION REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2026 | Fire New Construction - Standard | REQUIRES RESUBMIT | Fire (F) Reviewer Rob Neale; rneale@safebuilt.com Discipline Status:Denied Date Completed: 6/24/2026 1.Sheet 4521T-02FA Fire Riser Room Plan / Equipment Protection/Supply Side Surge Protector.The plans do not appear to show a listed supply-side surge protector at or near the fire alarm control unit. Please show the surge protector upon resubmittal. (2024 IFC 907.2 and NFPA 70-760.33) 2.Sheet 4521T-02FA Fire Riser Room Plan /Flow Switch Placement / Trade Coordination.Based on the submittal, the fire sprinkler contractor likely installed the flow switch. Some manufacturers require the flow switch to be installed at least 6 inches from a fitting that changes water flow direction or 24 inches from a valve or drain. Please note this on the plans. (2024 IFC 901.6.1) 3.Sheet 4521T-02FA Fire Riser Room Plan / Exterior Waterflow Alarm.It is not clear from the submittal if the existing sprinkler system or this dedicated function fire alarm is intended to provide the exterior audible and visual waterflow alarm required by 2024 IFC 903.4.3. Please address this item on resubmittal. 4.Sheet 4521T-02FA Fire Riser Room Plan / Cable Protection.Cable Protection. Where located within seven (7) feet of the floor, exposed cables shall be securely fastened in an approved manner and protected from physical damage. Please show on the plans how fire alarm cables will be protected. (2024 IFC 907.2 and NFPA 720-5.4.2.3) 5.Sheet 4521T-02FA Fire Riser Room Plan / Fire Alarm Control Unit Disconnect.The plans do not appear to identify the dedicated fire alarm control unit circuit, its disconnect, marking and security in accordance with NFPA 70-760.127 and NFPA 72-10.6.5.2. Please note the requirements on the plans. (2024 IFC 907.2) ◦RESUBMITTAL DIRECTIONS: ◦· All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta identification number, with a brief explanation of the change(s). ◦· As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is required for approval and permitting. ◦· Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to each of the noted plan review comments items. ◦· This response narrative must clearly address how each issue was corrected or resolved and indicate where the information may be found within the construction documents. The response narrative must be typewritten, on letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may result in review delays or rejection of the resubmittal. ◦· Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.) have been revised according to the above directions. Please resubmit the complete revised plan set with a separate copy of response narrative PDF through the municipality to complete the review. ◦· Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending on the size of the project and the volume of plans in queue at time of resubmittal. |
||
| 05/29/2026 | TFD Application Completeness Check Express | REVIEW COMPLETED |