Permit Number: TF-FCP-0326-00196
Parcel: 11108314B

Address:
2502 N DODGE BL

Review Status: Requires Resubmit

Review Details: FIRE CONSTRUCTION REVIEW v.3

Permit Number - TF-FCP-0326-00196
Review Name: FIRE CONSTRUCTION REVIEW v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
09/15/2026 Fire New Construction - Standard REQUIRES RESUBMIT Per 2024 IFC 1103.1 (COT Amended), ...A fire alarm control panel replacement shall be considered a new installation...
*I changed your permit to reflect this as a new installation. I also totaled up the area covered by the FA system and entered that (approx 50,777sf) into the permit instead of the provided "1sf".
Fire sprinkler riser components are shown on these old plans on page SS-3.
*Please show all equipment connections from the fire sprinkler riser to the FA in the fire alarm riser diagram on page SS-5.
Battery calculations are shown on the plans don't reflect the components proposed, but what was proposed when these plan were originally prepared.
*Please amend the battery calculations to reflect all of the components proposed to be connected to the new panel by the project completion (New and reused devices).
*Make certain the battery safety factor (sometimes referred to as "derating factor") is calculated properly and correct battery(s) is selected and covers calculated aH needed.
08/31/2026 TFD Application Completeness Check Express REVIEW COMPLETED