Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-1222-00055
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 12/20/2022 | Floodplain Administration Review | APPROVED | The report and application are acceptable and approvable for DTM drainage review for temporarily discharging to the right-of-way within the Swan Road Wash Watershed (TSMS Watershed: GD) and subsequently the downstream Swan Road Wash stormdrain system near TSMS node GD-N0010. It is recommended that Ward 2 & 6 offices be notified - if not already done so, that way if constituents are wondering what the discharge is and how long this activity will be occurring, then the Ward Office will have some information to to provide regarding the temporary discharge schedule and assure the constituent that this is discharge from a potable well. Also any impacted Neighbourhoods associations should be notified. I see the following NA info: Neighborhood Association NAME: Arcadia Rose STATUS: Active WARD: 6 PRESIDENT: Arlene Imoehl PRESIDENT_PHONE: 977-7817 PRESIDENT_EMAIL: R-A-IMOEHL@cox.net If discharge exceeds one week, or if there are unanticipated safety or accessibility considerations or conditions (for example, flowrate is excessive or traffic controls are not functioning as expected), the project may need to be re-assessed to consider a temporary 4-inch hose with associated traversable pedestrian/vehicular bridges to temporarily discharge to the Arcadia Wash. Recommended expiration date for FPUP: 28FEB23 The above information can be used as conditions of the FPUP approval. |