Permit Review Detail
Review Status: Requires Resubmit
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-0726-00294
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/16/2026 | Site Engineering | REQUIRES RESUBMIT | Permit Activity Number: TP-FPU-0726-00294 Project: Commercial Addition/Alteration Location: 1800 E FORT LOWELL RD Review Date: 7/16/2026 Reviewer: Joe Macaulay – Civil Engineer - Site Engineering Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter review time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. Provide a response letter addressing each comment with location of change on the plans. Submit the separate response letter and plan set files. 1. A Floodplain Use (FPU) Permit was created on the applicant’s behalf because the project exists entirely within a FEMA regulated floodplain associated with Navajo Wash. 2. The required cost estimate must be submitted and approved prior to TC-COM-0626-00959 receiving final approval and issuance. 3. The contractor must provide a detailed cost estimate in accordance with Substantial Improvement and Substantial Damage (SI/SD) requirements. The cost estimate must be submitted on official company/contractor letterhead and shall itemize all costs associated with the proposed scope of work, broken down into separate line items including, but not limited to: • Labor (all trades) • Materials and Equipment • Overhead and Profit • Warranties, Permits, and Fees 4. The cost estimate must reflect the full market value cost to complete the proposed work. Estimates that reflect only partial scopes, discounted rates, or owner-supplied labor must still account for the fair market value of all work performed. NOTE: Lease agreements, payment plans, financing agreements, or any other financial instrument will not be accepted as a substitute for a bona fide contractor cost estimate. 5. Please only provide a finalized cost estimate document to this FPU permit If you have any questions or concerns, please contact Joe Macaulay at Joe.Macaulay@tucsonaz.gov |