Permit Review Detail
Review Status: Requires Resubmit
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-0626-00262
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/24/2026 | Site Engineering | REQUIRES RESUBMIT | Permit Activity Number: TE-FPU-0626-00262 Project: Residential Addition/Alteration Location: 241 W LEE ST Review Date: 6/24/2026 Reviewer: Joe Macaulay – Civil Engineer - Site Engineering Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. For facilitating a shorter review time, please provide updated plans and calculations with a written response to each of the notated items indicating action taken. Do not cloud the changes made for comment updates; revisions are processed if changes occur after the permit is issued. Provide a response letter addressing each comment with location of change on the plans. Submit the separate response letter and plan set files. 1. A Floodplain Use (FPU) Permit was created on the applicant’s behalf because the project exists within FEMA regulated Zone “AE” associated with Bronx Wash. 2. The required cost estimate must be submitted and approved prior to TC-RES-0626-02979 receiving final approval and issuance. 3. The contractor must provide a detailed cost estimate in accordance with Substantial Improvement and Substantial Damage (SI/SD) requirements. The cost estimate must be submitted on official company/contractor letterhead and shall itemize all costs associated with the proposed scope of work, broken down into separate line items including, but not limited to: • Labor (all trades) • Materials and Equipment • Overhead and Profit • Warranties, Permits, and Fees 4. The cost estimate must reflect the full market value cost to complete the proposed work. Estimates that reflect only partial scopes, discounted rates, or owner-supplied labor must still account for the fair market value of all work performed. NOTE: Lease agreements, payment plans, financing agreements, or any other financial instrument will not be accepted as a substitute for a bona fide contractor cost estimate. 5. Please only provide a finalized cost estimate document to this FPU permit If you have any questions or concerns, please contact Joe Macaulay at Joe.Macaulay@tucsonaz.gov |