Permit Review Detail
Review Status: Approved
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-0626-00219
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Approved
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/15/2026 | ROW Engineering Review | APPROVED | Monsoon Season started June 15th, 2026 to September 30th,2026 - Debre and Physical blockages prohibiting Water Flow to be removed. All trenches will be required to be back filled at the end of each working day, and may not be opened if prediction of rain is above 0% within 3 days of work prior to post. | ||
| 06/15/2026 | Transportation Application Review | PENDING ASSIGNMENT |