Permit Review Detail
Review Status: Requires Resubmit
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-0526-00170
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/07/2026 | Site Engineering | REQUIRES RESUBMIT | Permit: TE-FPU-0526-00170 Location: 2626 N COLUMBUS BL UNITS 1 & 2 Review Date: 5/7/2026 A Comment Response letter is required. Please address all reviewer’s comments in a separate document with all required documents for resubmittal. Site Engineering Comments: 1. This floodplain use permit will require an intermediate and final elevation certificate to be filled out by a registered land surveyor or engineer and submitted to the associated FPU permit. The intermediate is to be completed PRIOR to pouring the foundation. The final is completed after construction is completed. 2. The project resides within FEMA XS-100FT Flood Zone and will require the submission and approval of a Development Package (DP) – “Grading Permit.” Apply for this permit on TDC-Online. City of Tucson Floodplain Ordinance - Section 26-8.b.3: https://codelibrary.amlegal.com/codes/tucson/latest/tucson_az/0-0-0-19333 3. All grading plans must be prepared, signed, and sealed by a licensed Arizona Civil Engineer and submitted in accordance with the City of Tucson Technical Standards Manual (TSM) Section 2-01.0.0. At a minimum, the grading plan submittal shall include the following: • Regulatory Compliance: Demonstrate compliance with Technical Standards Manual (TSM) Section 2-01.0.0. • Existing Conditions: Depict existing topography with contour intervals (typically 1- or 2-foot intervals), benchmark, and datum reference (NAVD 88). • Proposed Grading: Show proposed contours and/or spot elevations throughout the site, including finished grade elevations at all building corners, parking areas, and drainage structures. • Limits of Disturbance: Delineate the full extent and limits of all proposed grading work, including all areas associated with required drainage improvements. • Cut & Fill Quantities: Provide total area of disturbance in square feet, as well as total cut and fill quantities. • The Submission of the grading permit should include a Hydrology Study which would be prepared by a registered civil engineer or hydrologist. • Finished floor elevation: the regulatory floor elevation of the structure is 23” above natural grade. Label FFE on the grading plan and building permit site plan. (Both FFE’s must match) 4. Resubmit to this FPU with the same documents as the required grading permit (DP). 5. Site Engineering will be unable to approve the FPU permit (TE-FPU-0526-00170) until a Grading Permit (DP) is applied for. (Note: approval of model permit(s) (TC-MDP-0426-00241) will be unable to be approved until associated FPU permit and Grading Permit (DP) have been approved.) If you have any questions or concerns, please contact Dylan Molina. Dylan.Molina@tucsonaz.gov |