Permit Review Detail
Review Status: Requires Resubmit
Review Details: FLOODPLAIN USE REVIEW v.1
Permit Number - TE-FPU-0523-00196
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/09/2024 | Floodplain Administration Review | REQUIRES RESUBMIT | 1) For Sewer project # 2: Grouted riprap is called out on plans but gabions are indicated elsewhere; clarify. 2) For Sewer project # 2: Bank scour protection is unclear; explain how upstream and downstream portions of the rip rap bank protection is designed to protect against local scour conditions during 100-year event. 3) For all sewer projects 1, 2, & 3, revise plans and drainage report, explaining energy grade line changes, and how sediment transport will not be adversely impacting adjacent properties. Aggradation of sediment is not acceptable; revise report including WASH compliance section. |
||
| 09/11/2023 | ROW Engineering Review | REVIEW COMPLETED |