Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TE-FPU-0125-00029
Parcel: 112051640

Review Status: Requires Resubmit

Review Details: FLOODPLAIN USE REVIEW v.1

Permit Number - TE-FPU-0125-00029
Review Name: FLOODPLAIN USE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
01/24/2025 Site Engineering - Standard REQUIRES RESUBMIT 1. A Hydrology Study is required. An engineer will need to show that the proposed wall design meets these two criteria:
a) Does not have an adverse impact on adjacent or downstream properties during the 100-year storm. Show "no rise" in floodwaters at adjacent and downstream properties. This is shown in the Hydrology Study.
b) Can withstand the force of the 100-year floodwaters while allowing floodwaters to pass through as they do in the existing condition. A licensed engineer needs to stamp the plans for the wall. This is referring to the construction plans but should also be discussed in the Hydrology Study.

Mike Ortiz
michael.ortiz@tucsonaz.gov